Natural gas installation engineer at S.C. Maestro Gaz Construct S.R.L.

  • România, Constanța
  • România, Constanța
  • Romania, Constanța
  • Romania, Constanța
Deblocheaza date contact
Traduceri ale CV-ului
  • Ultima actualizare: 25-02-2012
  • Numar referinta: 1430


Permis de conducere
  • B

Limbi straine

  • Last update: 25-02-2012
  • Reference number: 1430


  • January 2000 - Present

    Natural gas installation engineer, S.C. Maestro Gaz Construct S.R.L.

    • Constanța, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Field measurements, elaboration of natural gas installations, ongoing monitoring and verification contract.electrofusion execution of branching and natural gas installations of HDPE with diameters ranging from DN 32 mm DN 63 mm.Polypropylene Thermal Runs

  • May 1998 - December 1999

    Head shop, S.C. Activ Light S.R.L

    • Constanța, Romania
    • Full time
    • Work domain - Marketing: PR,Advertisement

    manufacture illuminated signs, Benera, awnings, street signs, burning sticker. Coordination of workshop activity.

  • April 1985 - May 1998

    Oil and gas pipeline construction engineer, S.C. Petroconst S.A.

    • Constanța, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Managed technical documentation for various projects Supervised workforce of 10 to 40 peoplePrepared contracts (documentation, specification, terms)Accomplishments:Coordinating documentation for III Transit high pressure Gas Piping (48”) Ukraine – Greece project, Romanian area ($850 million whole project – 195 km)Coordinating execution and managed documentation and workforce for: High pressure Gas piping (24”) ($14 million whole project – 27 km), High pressure Gas piping (20”) ($25 million whole project – 32 km), Medium pressure Gas piping (24”) ($70 million whole project -30 km),Regulating and measuring gas Station (4”-20”), ($6 million whole project),Terrestrial and undersea piping (6”-12”) ($550 million whole project – 300 km),Designing and execution of different engineering works.Generating isometrics.Follow  up and coordination of activities performed by the personnel reporting to me, all romanian sea platforms : Fortuna, Gloria, Saturn, Jupiter, Orizont, Prometeu, Atlas, to Central Platform and PGSU 3 Fitting jackets to sea platforms and social groups,Bind the gas and oil well to manifolds,Fitting oil pipes and inpute line to sea platforms.Arrangement PGSU 3 ( well, manifolds, cementing truck  ACF, PSI ),Submerged oilduct Æ  323, about 70 km long, connecting offshore platform to shore systems  Location Black Sea in way of Cape Midia  Piperun sections of 2 km in lenght manufactured on shore and fitted on the sea bottomUnderground gas pipe transiting from Russia to Turkey ,section Isaccea-Negru Voda, Æ 1200 . About 100 km long. Pipe sections of 20  m long fitted on site.Gas Metering Station jointly with NUOVO PIGNONE- Italy , serving the gas pipe Æ 1200 mm, with location in Negru Voda . Construction G.M.S. including fitting of measuring lines with Daniels , horizontal liquid separators and filters.Modernization measuring gases station Isaccea


  • 2012 - 2012

    Postdoctorate, S.C. Work Consulting S.R.L.

    • Constanța, Romania
  • 1981 - 1984

    Bachelor's degree, Ovidius University (Faculty of Mechanical Specialized Welding Technology))

    • Constanța, Romania


Driving license
  • B

Foreign languages