Electrical Routing Design Engineer at AREVA

  • România, București
  • România, București
  • Romania, București
  • Romania, București
Deblocheaza date contact
Traduceri ale CV-ului
  • Ultima actualizare: 06-06-2011
  • Numar referinta: 7779


Permis de conducere
  • B

Limbi straine

  • Last update: 06-06-2011
  • Reference number: 7779


  • April 2010 - Present

    Electrical Routing Design Engineer, AREVA

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Perform electrical routing design for power cables, command and control cables,instrumentation cables. 
    - I make calculation of penetrations, cable trays size for diferent voltage levels using and respect layout cables nuclear procedures.
    - Use Navis Works 3D software, Excell Data bases.
    - Using Kadis, VPE, Dessi, Power Junction Boxes.
    - Using typical layout support procedures.
    - Perform electrical routing design for 1000 cables per each elevation buildings.
    - detail drawings for typical supports. 

  • June 2008 - March 2010

    Technical Manager, SC Iacob Electric

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Rehabilitation of electrical power supply energy with automatic change over and internal installation for Police Office School Campina 
          -     Performed technical-economical offer using Win Dev 6.1 software 
    -	Low voltage calculation, power cable dimensioning, low voltage panel dimensioning
    -	Equipment list, requisition list
    -	Consumer list, Load list.
    -	Detail Engineering.
    -	Meeting Vendors.
    -	Technical specifications for the equipments
    -	Designing of low voltage General Panel and Distribution Panel – dimensioning drawings, layout drawings, layout drawing for external lighting pole, main grounding.
    -	Lighting calculation using Elba-Lux romanian software.
    -	 Using catalogue of ABB, Siemens, Moeller in order to prepare the technical specifications for low voltage equipments.
    -	Coordinated the installation of low voltage equipments and medium voltage equipments
    -	Coordinated the installation of power cables, cable trays, main grounding for building and lightning.
    - Coordinated the installation of ABB Power transformers 10 / 0.4 Kv
    - Coordinated the installation of 10 kv substation type ABB.
    - Leveling for substations, fastening, cable trench comunications.
    - Coordinated the installation of bus duct 10 Kv - Feeder

  • January 2008 - March 2008

    Electrical Designing Engineer, The Badger Company Enginering

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Adenhaven Project – Marine Loading Arm – Performed lighting calculations, external
                       Lighting, layout drawings.
                       - prepare requisition list.
                       BB Energy Project – Oman Oil&Gas
    -	Designing of cable trays layout for electrical equipments.
    -	Dimensioning of  power cables.
    -	Meeting vendors.
    -	Technical specification for the motors – ATEX areas.
    -	Load list.
    -	Detail Engineering
    -	Detail Engineering for substations 10,6 Kv type ABB
    -	Detail engineering for terminal box of medium voltage motors
    -	Detail engineering for low voltage panels dimensions and fastening

  • October 2007 - January 2008

    Electrical Designing Engineer, IMSAT SNEF

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Working for Lime Factory as follow:
    -	Performed  general cable trays layout drawings ,electrical and instrumentation equipments  layout drawing.
    -	 Performed lighting calculation, and general layout drawings for external and internal lighting, wiring diagram, connection diagram. Also I made cables calculation.
    -	I made power cable dimensioning for low voltage motors, general layout drawing for power transformers 10 /0.4 Kv, substations, and 0.4 kV low voltage panels.
    -	Load list, Cable list, Equipment list
    -	Requisition list, Technical specifications&ATEX areas.
    -	Detail Engineering  

  • January 2004 - September 2007

    Electrical Construction Engineer, Nuclear Power Plant Cernavoda Romania

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Working with guidelines, working with Non conformance reports, quality observation reports, Site dispositions, Design Change notice.
     - Coordinated installation of Main Power transformers 110 /10 /6 kV, 24/10/6 Kv, and overhead high voltage lines 110 Kv, 400kV – disconnect switch, surge arresters, load break switch, current transformers, connection of clamps type Cariboni - torques, installation of Aluminium steel core stranded conductor, connections of metallic supports to the main grounding.
     - Coordinated installation of 6,10 Kv ABB substation, bus – duct 6, 10 Kv type Electroputere Romania – performed torques for flexible joints, drainage for umidity, and bus-ducts supports.
                -    Working with INTEC program,checking the routing of cables and connection  
                      sheets for field implementation.
    -	Using INTEC program for location of the electrical equipments and identification on the 
    GA drawings.
    -	Follow the routing of cables and connection to the terminals, respected the 
    INTEC sheets and Romanian standard PE107 for minimum distance accepted between the level voltage.I had a good communication with INTEC department in order to solve the field routing modifications.  
    -	Coordinated installation of power cables type Nexans, terminals and splice type Raychem and 3M, also performed installation of cable trays respect the technical requirements Standards procedure - minimal distance between the cable trays and hot pipes and between the voltage levels.
    -	Short circuit calculation on the high voltage bus-bar.
    -	Coordinated installation of 0,4 Kv Power Center and MCC panels type ABB, included the 0.4 kV bus-duct installation, torques and connection of cables.
    -	Coordinated electrical tests included insulation test for power cables, insulation tests for 6,10, 24 kV bus – duct, high-pot test for 6,10,24 Kv bus –ducts, contact resistance, grounding continuity test.

  • April 2001 - July 2003

    Electrical and Instrumentation Enmgineer, SC ICPET SA Bucharest

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Project :Rehabilitation of  Group 4 – VT100 MW – special measurements Bentley Nevada
    Coordinated installation  of special measurements Bentley Nevada for steam turbine and electrical generator at CET SUD Bucharest for grup 4 - VT 100 MW. This installation included vibration transducers, relative expansion transducers, thermocouples for bearings, cassings and flanges, speed transducers in the front pedestal, stop valve thermocouples, absolute expansion transducers, junction boxes, cable glands, also performed connection of signal cables and proximity sensors. Made control board for vibration transducers 25 µm, for rotor axial displacement according with technical specifications of Bentley Nevada. Installed steam valve for steam turbine circuits, and impulse valve  for oil circuits to the  front pedestal of steam turbine.
    Coordinated the installation of overhead highvoltage line 110 kV, power transformers 110/10/6 Kv, 10/0.4 kV

  • January 2000 - July 2000

    Electrical Construction Engineer, SC ELCO SA Bucharest

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Rehabilitation of Water Pumps Substations Pipera and Sud Drumul Taberei
    Performed electrical installation 6 Kv and 10 Kv substation type Merlin Gerin and ABB, cable trays and power cables, lighting installation included all fittings, installation for power transformers, and 0.4 Kv panels.
    -Grounding installations
    -Power transformers type Brown Boveri
    -Power cables underhead high voltage lines

  • July 1999 - January 2000

    Electrical Construction Engineer, SC CONELECTRO SERVICE S.R.L.

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Coordinated the installation of 6,10 Kv substations type abb, Merlin Gerin, power supply for big buildings.  
    -	Installation of  lighting panels, lighting fixtures including all the fittings.
    -	Installation of power cables, splice type 3M and Raychem, terminals for cables.
                -    Installation of junction boxes included cable glands terminal blocks and cable connections.
    -	Installation of power transformers 6 / 0.4 Kv, 10/0.4 type ABB and Electroputere Craiova
    -	Installation of over head high – voltage line 110 kV, 110/10/6 kV power transformers
    -Installation of grounding system
    -Installation of house lightning for surge arresters.

  • September 1990 - October 1991

    High voltage 110 Kv substation exploitation, Thermo electrical power plant CET Grozavesti

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Performed exploitation for 110 Kv substation, disconnect and connect the high voltage lines, performed verification for annual revision for all high voltage equipments including breakers, disconnect switch, load break switch, power transformers.
    Performed insulation test for power cables, for the motors, and for 6,10 kV bus-duct


  • 1994 - 1999

    Bachelor's degree, Energetics University - Within Polytehnic Institute Bucharest

    • București, Romania


Driving license
  • B

Foreign languages