113113

Head of Power and Construction Department at HIGH CLASS CONSULTING

  • România, București
  • România, București
  • Romania, București
  • Romania, București
Deblocheaza date contact
Traduceri ale CV-ului
30%
  • Ultima actualizare: 21.06.2014
  • Numar referinta: 113113

Aptitudini

Permis de conducere
  • B
  • C

Limbi straine

Engleza
Avansat
Franceza
Mediu
Germana
Incepator
Romana
Nativ
80%
  • Last update: 21.06.2014
  • Reference number: 113113

Experience

  • June 2010 - June 2014

    Head of Power and Construction Department , HIGH CLASS CONSULTING

    • București, Romania
    • Full time
    • Work domain - Technicians: Construction

    Consultancy and Project Management for old architecture (historical and patrimony monuments) 
    Achievements 
    Electrical rehabilitations of old areas which are historical monuments (XIX-XX centuries) - Bucharest. 
    
     Join the civil works (roads, buildings) with electrical cabling and mounting systems
    Area lightening, CCTV monitoring, traffic lights, access control, burglary, standby power systems.   
    Firefighting systems
    Water drainages system supply 
    PLC implementation in technical & control rooms
    Elaboration of Working drawings documentation (block diagrams and details) & put in place for all electrical consumers of the facility 
    Feasibility study & implementation for the electric supply (400-600kVA/20/0.4kVA)
    Electrical power balances
    Single line, multiline diagrams & layouts
    Elaboration of the AS-BUILT documentation 
    Tracking changes to the project design and hand them over to the back office 
    Suppliers: HID, PELCO, CERBERUS, ABB, SCHNEIDER, etc

  • November 2007 - June 2010

    DIRECTOR – Department of ELECTRICAL Utilities & Relocations , Romanian National Company of Motorways and National Roads

    • București, Romania
    • Full time
    • Work domain - Technicians: Construction

    Responsibilities: 
    To achieve the objectives and to comply with the performance criteria established by the Head Manager and for this purpose he disposes of the following prerogatives:
    Coordinates the activities regarding the development of the works execution contracts and of the consultancy services for design and supervision of the works financed by the European Investment Bank (EIB) and the Romanian Government. 
    Supervises the execution of the works execution contracts and the services contracts in compliance with the contractual conditions and terms and in compliance with the specific provisions of the Loan Agreements and the legislation in force.
    Draws up and applies the strategies necessary for achieving the objectives  
    Proposes for selection, employment and dismissal the directly subordinated personnel 
    Together with the Head Manager, he represents the Department in the relations with third parties; 
    Together with the other persons and services appointed by the company’s management, he concludes legal documents on behalf of the Department;  
    Participates to meetings with the representatives of the International Financial Institutions, regarding the method to develop these loans. 
    Approves of the correspondence with the Contractors, Consultants, EIB and other institutions involved in the projects’ execution  
    Keeps the professional secrecy and the confidentiality of the operations and activities performed      
     Uses his entire working and professional capacity for the company’s interest, acting within his activity as a good professional 
    
    Achievements: 
    
    1. Algerian East – West Highway Costruction Project (399km) for Japonais Consortium COJAAL
    
    2. National Roads Rehabilitation (DN1; Brasov - Sibiu, DN 17; Cluj – Vatra      Dornei, Suceava, DN66; Petrosani – Simeria, DN 56A; Bucura – Simian - Maglavit)
    
    Works executed: Follows up the design (single & multiline diagrams, block diagrams, layouts, As build), track and report changes for power & lighting, main electrical distributions supporting switchgears, transfer switchers, transformers and standby power systems :
    10 Kv airline power supply
    Insert of new & relocated medium and low voltage cables
    Insert of new & relocated power stations 400kVA, 630kVA
    Public lighting
    Electric power balances 
    Replacing medium and low voltage cubicles
    Commissioning of medium & low voltage connected with the local control rooms and dispatches 
    Alternative power supply (ring, boucle)
    Contractors: 
    Schneider electric France & Germany
    ABB Sweden
    Siemens Germany
    Allocated budget : millions €	

  • June 2003 - September 2007

    ELECTRICAL SENIOR PROJECT MANAGER , UTI SYSTEMS S.A GROUP (part of the – USA Group)

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Responsibilities:
    Coordination of activities regarding: the Feasibility Study (FS), the Technical Project (TP), the Tender Book (TB).
    Supervises the elaboration of the documentation for Working Drawings  and authorized approval. 
    Based on the Technical project (TP) and on the Tender Book (TB) he draws up the Invitation to Tender for appointing the General Contractor.   
    Works with the project documents (deliverables). Deliverables examples: 
    Project initiation document  
    Communication plan   
    Risks plan  
    Activities plan  
    Resources plan 
    Procurement plan 
    Cash flow
    Income and expenditure budget  
    Change order 
    Exception report 
    Progress report 
    Closure report 
    Meeting minutes 
    Sole problems list 
    Draws up and proposes to be approved by the Beneficiary the Working Procedure (SOW – Statement of Work)
    Surveys the elaboration of the Quality plan, on works stages. 
    Draws up the PM deliverables and presents them to his Superior Hierarchic Chief upon the periods of time established in SOW or anytime necessary, so that this one is permanently informed on the compliance with the periods of time established, with the budgets allotted by means of Business Plan (BP) in keeping with the Quality Plan. 
    Follows up the execution in time, with the participation of all the parties involved of the project determined phases. 
    Verification of the actually performed works situations and their reimbursement. 
    Participates to on site inspections, to receptions on works and design phases, to receptions at the end of works and to the final reception.  
    Draws up the works execution contracts with each subcontractor. 
    Verifies the works execution contract submitted to be signed by the Beneficiary (General Contractor). 
    Achievements: COMPLEX TURNKEY PROJECTS 
    	Beneficiaries: DEPARTMENT OF DEFENCE, DACIA Factories (car builder), ROMANIAN ELECTRICAL COMPANY, Tg. Mures &Sibiu AIRPORTS, CITY HALL of Tg. Mures.
    	Works executed:
    DEPARTMENT OF DEFENCE
    Design (feasibility, technical, working drawings) for Electrical & Civil Works for (military roads, general electric supply, electric power cables and feeble-current cables lying, perimeter and safety lighting, CCTV, firefighting, technical & control rooms).
    City Hall of Tg. Mures (Integrated Emergency Dispatch service 112)
    	Electric design &  works (general electric supply – 400 kVA, electric power cables and feeble-current cables laying, perimeter and safety lighting, security equipments assembling; e.g. video cameras, TGD, UPS, motor-generator set, Technical Chamber).
    Fibre Optic Air Laying and ground cabling on national roads (L=10 km, concrete poles mounting, fibre optic laying, electrical joints, junction boxes, distribution panels, in the Technical Chamber)
    INTERNATIONAL AIRPORT OF SIBIU (Runway Light Marking)
    	Beneficiary: Sibiu County Council 
    	General Contractor: MAX BOEGL GMBH
    	Consultant: DORNIER CONSULTING GMBH
    Electrical & Civil Works ( runway civil works,  runway special lighting, general electric supply, electric power cables and feeble-current cables laying, perimeter and safety lighting, security equipments assembling; e.g. video cameras).
    NOTE:
    At the International Airport of Sibiu, the contract between the General Contractor and the Contractor was made in compliance with the FIDIC rules in buildings. 

  • April 2001 - February 2003

    ELECTRO-MECHANICAL ENGINEER, S.C. SERACOM ENGINEERING

    • București, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Achievements: 
    a. April 2001 - November 2001 – ELECTRICAL SITE ENGINEER (detached) at “FORTUM ENGINEERING COMPANY”-FINLAND for the Modernization and putting into service of Group I of the Chiscani – Braila Steam Power Plant 
    		BENEFICIARY: TERMOELECTRICA
    GENERAL CONTRACTOR: FORTUM ENGINEER FINLAND, ALSTOM GMBH
    CONTRACTORS: Energomontaj, IEA, Eurosic
    CONSULTANT: LAHMAYER CONSULTING GMBH
    Responsibilities: ELECTRICAL CONSULTANT for FORTUM ENGINEERING
    Drawing up and submission for approval of the weekly working permissions to the General Contractor. 
    Verification by periodical inspections of the works stages  
    Verification of the actually executed works situations and their approval / rejection to payment. 
    Correlation of the international contractual conditions  with the Romanian legislation in the field and the FIDIC regulations 
    Participation to weekly meetings with the Beneficiary 
    Idem with the Contractors  
    Verification and approval / rejection to payment of the Additional Works (NCS)     
    Verification of the contractors’ compliance with the established periods and the allotted budgets, on works stages  
    Participation to on site inspections, to receptions on works phases, to receptions at the end of works and to the final reception 
     	Works executed:	
    Implementation of the Electrical works (next to the civil works) and tracking changes of the design (working drawings and As build):
    	-    Firefighting system
    	-    Hazardous area 
    	-    General lightening system
    	-    Waste water drainage
    Identification, zoning and marking of the electric power users routes 
    Programming the 6 KVca cells and the 240Vca cells 
    Verification of synchronism to bars 
    Verification of secondary circuits (protections)
    Study of protections and ventilation to the 240MVA transformer 
    Study of the 220kV/1600A master switch and of the current transformer and the potential transformer & erection plans  
    Verification of the execution & documentation for the 24VDC and 220VDC substations 
    Explosion risk zoning 
    Connections to the Automation & Control room
    Commissioning
    b. November 2001 - August 2002 ; ELECTRICAL ENGINEER for the modernization of touristic facilities (10 km roads, parking & perimmetral lightning, sea water drainage, hydrofors, CCTV surveillance, traffic lights, control room, 144 rooms, 4 restaurants, 4 kitchens, general AC system)  in Eforie Nord, Constanta – 600kVA
    Responsibilities: 
    Supervises the elaboration of the documentation for Working Drawings and special approvals.
    Approves of the tender books on specialities for appointing the speciality Contractor 
    Initiates the project documents (deliverables) 
    Draws up and proposes to be approved by the Beneficiary the Working Procedure (SOW – Statement of Work)   
    Surveys the elaboration of the Quality plan, on works stages.  
    Draws up the PM deliverables and presents them to his Superior Hierarchic Chief upon the periods of time established in SOW or anytime necessary, so that this one is permanently informed on the compliance with the periods of time established, with the budgets allotted by means of Business Plan (BP) in keeping with the Quality Plan.  
    Follows up the execution in time, with the participation of all the parties involved of the project determined phases. 
    Verification of the actually performed works situations and their reimbursement. 
    Participates to on site inspections, to receptions on works phases, to receptions at the end of works and to the final reception.  
    Draws up the works execution contracts with each subcontractor. 
    Verifies the works execution contract submitted to be signed by the Beneficiary (General Contractor).
    	Works executed:
    Electrical works (next to civil works)
    Elaboration of Working drawings documentation (block diagrams and details) & put in place for all electrical consumers of the facility 
    Feasibility study & implementation for the electric supply (2x600kVA/20/0.4kV)
    Implementation of AAR equipment – low voltage for choosing alternative electrical supply.
    Elaboration of the instructions for operation and maintenance 
    Elaboration of the AS-BUILT documentation 
    Implementation and commissioning for a 100kVA  AC system

Education

  • 1977 - 1983

    Bachelor's degree, POLYTECHNIC INSTITUTE OF BUCHAREST

    • București, Romania

Skills

Driving license
  • B
  • C

Foreign languages

English
Advanced
French
Intermediate
German
Beginner
Romanian
Native