113722

FOREMAN at Realtec-NL B.V. /Holland –Zealand Refinery

  • România, Hunedoara
  • România, Hunedoara
  • Romania, Hunedoara
  • Romania, Hunedoara
Deblocheaza date contact
Traduceri ale CV-ului
25%
  • Ultima actualizare: 15.09.2014
  • Numar referinta: 113722

Limbi straine

Engleza
Mediu
Franceza
Mediu
Italiana
Avansat
Spaniola
Mediu
Maghiara
Incepator
Rusa
Incepator
Greaca
Incepator
Turca
Incepator
Romana
Nativ
75%
  • Last update: 15.09.2014
  • Reference number: 113722

Experience

  • April 2014 - June 2014

    FOREMAN, Realtec-NL B.V. /Holland –Zealand Refinery

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries,Industries / Production / Manufacturing

     I’ve organized and coordinate the entire process of the shut down for the gas filtration column in the Zealand Refinery;
     I was in charge with dismounting, removing and replacing down comers, trays and dispensers.
    

  • November 2013 - April 2014

    FOREMAN, Romon-Group ,Germany

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

     I’ve coordinate the activity of Romon-Group for the construction of the bio-diesel refinery from Lamperanta Finland.

  • July 2013 - November 2013

    FOREMAN, Romon-Group ,Germany

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    I’ve participate of the process of shut down for the Feizin Refinery having as main responsibilities the replacement of  pipe lines and heat exchangers.

  • March 2013 - July 2013

    FOREMAN, BELMONT S.R.L. ITALY

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

      I manufactured pipe elements and joints of different diameters according to the isometric drawings, I transported and mounted them; I manufactured and mounted the pipe supports; I performed the pressure tests

  • January 2013 - March 2013

    PIPE FITTER, STORENGY SAINT ILLIER FRANCE

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    I manufactured pipe elements and joints of different diameters according to the isometric drawings, I transported and mounted them; I manufactured and mounted the pipe supports; I performed the pressure tests.

  • October 2012 - December 2012

    PIPE FITTER, SECTION EUROPEAN DU TRAVAIL INDUSTRIEL

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    In this period I’ve worked in France, city Le Havre for Raffinerie de Normandie.I manufactured pipe elements and joints of different diameters according to the isometric drawings, I transported and mounted them; I manufactured and mounted the pipe supports; I performed the pressure tests

  • May 2012 - July 2012

    PIPE FITTER, TERNA-BIOTEK GRECE

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    In this periods I worked in Greece for Hellenic Petroleum Elefsis Refinery were I  participated with Terna- Biotek company for commissioning activities.

  • August 2011 - May 2012

    PIPE FITTER LOCSMITH, CONTE VIANI S.R.L. ITALY

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    The company I’ve worked for, participated in the expansion of the concrete plant “Calce S. Pellegrino s.p.a.” Here, I mounted steel structures, pipe spools of different diameters; I manufactured and installed pipe supports; I plated the steel structure and the roof with panels.

  • January 2010 - May 2011

    PIPE FITTER LOCSMITH, SICILIANA ENERGIA AMBIENTE,ITALY

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    The company I’ve worked for, built the TGV power plant of 420 MW in Charleroi, Belgium. I manufactured pipe elements and joints of different diameters according to the isometric drawings, I transported and mounted them; I manufactured and mounted the pipe supports; I performed the pressure tests. All these works were done in the boiler room, machinery spaces and on the stockade; I manufactured and mounted the entire installation for the auxiliary boiler, I performed the pressure tests, assisted to the putting into service and the rendering to the beneficiary.
    The used materials are characteristic to this type of installation: A105; A333; P11; P22; P91; stainless steel, steel sheet and carbon steel of different widths.  
    

  • February 2009 - December 2009

    PIPE FITTER, SICILIANA ENERGIA AMBIENTE,ITALY

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    The company I’ve worked for, installed the 2 boilers and the flue-gas stacks at the power plant Bahia de Algerias, in Spain. My tasks were similar to those performed in Belgium.

  • July 2008 - February 2009

    PIPE FITTER, SICILIANA ENERGIA AMBIENTE,ITALY

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    The company I’ve worked for, installed the 2 boilers and the flue-gas stacks at the power plant Irshing, Germany, a project of the Siemens company.
    I worked in the upper and lower dead room, were I manufactured and mounted the lower pipe installation.
    I lined the rooms with carbon steel and stainless steel sheet.
    I took part in the manufacture, mounting and coupling of the two flue-gas stacks.
    

  • May 2007 - July 2008

    PIPE FITTER, BALCKE DURR ITALIANA S.R.L. ITALY

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    The company I’ve worked for, has realised the conversion of the power plant Torrevaldaliga Nord from Civitavecchia. I manufactured pipe elements and joints of different diameters according to the isometric drawings, I transported and mounted them; I manufactured and mounted the pipe supports; I performed the pressure tests

  • April 2005 - May 2007

    PIPE FITTER WORKER FABRIKATOR, AGENCY OF TRADING & SERVICES, DOHA QATAR

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    I took part in various on-shore and off-shore shut-downs for different companies: Qatargas, Rasgas, Qchem, Qopco, Qfoc, Dunkhan, Petrofac, N.G.L. where I carried out activities that are specific to refineries and petrochemical plants: manufacturing pipe spools, pipe supports, access stairs and platforms, mounting works, pressure and hydro tests, pigging operations.
    I am licence to perform such works and I have successfully completed the H.U.E.T.& SEA survival training.   
    I also worked on projects involving metallic structures: The Khalifa Stadium, New Airport, Sport City Center, Qatar Navigation, ship repairs
    

  • September 2003 - April 2005

    PIPE FITTER WORKER FABRIKATOR, GÁS és ACÉLJZS KFT, BUDAPEST - HUNGARY

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    -	pipe spools works
    -	pipe fitting works by means of flanges, adapters, elbows, couplings and other fittings made in the workshop and mounted in the plant;
    -	refinery maintenance works, namely replacing packings, covers, screws, taps, valves, pipe spools and hydro tests.
    -	Metallic structures works.
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    

  • April 2002 - August 2003

    PIPE FITTER, J.Ray Mc. Dermott Middle Inc. Jebel Ali free zone Dubai – E.A.U.

    • Hunedoara, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Two major projects: MURPHY MEDUSA and FRONT RUNNER outside and inside works (I possess a Confined space permit).
    -	reading the general ensemble blueprints;
    -	drawing out the dimensions and drawing up work sketches for laying out, preparing and assembling structural components;
    -	using metal working tools and cutting torches to cut steel, drill or punch holes and roll, bend or press steel in the desired shapes.
    -	Assembling, fitting and connecting  metal sections and plates to form complete units;
    Fastening components (by mechanical means or tack welding).
    

Education

  • 1985 - 1989

    Highschool, Matematich and Physics High School

    • Hunedoara, Romania

Foreign languages

English
Intermediate
French
Intermediate
Italian
Advanced
Spanish
Intermediate
Hungarian
Beginner
Russian
Beginner
Greek
Beginner
Turkish
Beginner
Romanian
Native