120212

welding engineer at martifer metalic construction

  • România, Slobozia
  • România, Slobozia
  • Romania, Slobozia
  • Romania, Slobozia
Deblocheaza date contact
Traduceri ale CV-ului
30%
  • Ultima actualizare: 26.11.2014
  • Numar referinta: 120212

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Avansat
Romana
Nativ
80%
  • Last update: 26.11.2014
  • Reference number: 120212

Experience

  • February 2014 - Present

    welding engineer, martifer metalic construction

    • Slobozia, Romania
    • Full time
    • Work domain - Technicians: Construction

    Responsabilities :
    project requirements analysis, technical analysis of the project establishment and
    development of welding technology, welding technology testing and testing personnel qualifications for welding
    Evidence and control of welding equipment.
    Planning Welding activity: 
    analysis using welding procedures and instructions.
    preparing budgets for welding and NDT inspection.
    Design of welded joints: joints and choice of the optimal working procedure - to
    reduce manufacturing costs
    Achievements : 
    qualification of welding procedures according  AWS.D1.1. AWS D1.5, EN ISO 15614-1 for a different process: SMAW(111), GMAW(135) ,FCAW(136,138), SAW (121,123) GTAW(141)
               -Developed WPS according : EN 15609, AWS D1.1. ,  AWS D1.5.
    Certifying welders and welder operators according  international standards EN ISO
    287-1/SR EN ISO9606-1; AWSD.1.5 AWS D1.1.
               - Develop welding technology  for welding processes    FCAW  ( 136;138) ; SAW (121) for a ITER (International Thermonuclear Experimental Reactor ) project .
    
    Welding testing by various methods  depending on the type of defects sought:
               visual inspection according to EN 17637 / EN5817 for surface defects
               visual inspection whit magnetic  powders according to EN17638 / EN23278 for surface defects and shallow 3-4mm max.
            interpreting ultrasound control results according to EN11666
            Developed  repair technologies for eliminating defects rejected
             Analysis nonconformities arising from controls in non-destructive tests , determination of causes, establishing remediation technology for  removing the nonconformity, establishing the necessary measures to be taken to avoid repetition of their appearance
    preparing budgets for welding and NDT inspection.
    Design of welded joints: joints and choice of the optimal working procedure - to
    reduce manufacturing costs.
    
    Execution steel structures – overpass Mihai  Bravu Bucharest-Romania
    Execution of steel structures - Bridge Rail Coslariu-Sighisoara-section IV
    paneuropean rout- Romania
    

  • August 2013 - December 2013

    welding manager, galaxy engineerin &consulting

    • Slobozia, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    Responsabilities :
    project requirements analysis, technical analysis of the project establishment and
    development of welding technology, welding technology testing and testing
    personnel qualifications for welding
    Evidence and control of welding equipment.
    Planning Welding activity: 
    analysis using welding procedures and instructions.
    Preparing assembly and welding technologies for oil tanks installation,
    preparing budgets for welding and NDT inspection
            Developed  repair technologies for eliminating defects rejected
             Analysis nonconformities arising from controls in non-destructive tests , determination of causes, establishing remediation technology for  removing the nonconformity, establishing the necessary measures to be taken to avoid repetition of their appearance
    Welding testing by various methods  depending on the type of defects sought:
               visual inspection according to EN 17637 / EN5817 for surface defects
               visual inspection whit magnetic  powders according to EN17638 / EN23278 for surface defects and shallow 3-4mm max.
            interpreting ultrasound control results according to EN11666
          Achievements : 
    Developed PQR/WPAR according  EN15614-1, AWS D1.1 
    ASME IX, AWS 1.1. API 650  for a different process : GMAW(135), FCAW(136,138) , GTAW(141), SMAW(111) , SAW(121,123)
    Developed WPS  according EN 287-1, AWS D1.1 , ASME IX
    Certification of welders  according ASME IX; API650: AWS D1.1 for a different process GMAW(135), FCAW(136,138) , GTAW(141), SMAW(111) , SAW(121,123)
    
    
    Execution  oil tanks of various capacity 13000mc; 10000mc; 5000mc.-
    All Zubair OYL FIELDS - IRAQ
    

  • February 2003 - July 2013

    manager, IMW

    • Slobozia, Romania
    • Full time
    • Work domain - Technicians: Construction

    Responsabilities :
    Construction Elaboration , negociation offers , technological preparation for the realization the works
    identification of the establishment and contracting of suppliers off materials,
    establish to amount of labour for the execution on the works
    Monitoring execution of the works of different stages
    Coordination of drawing documentation to the stage of execution
    Achievements : 
                  Steel Structure for Gym Hall  - Dinamo Sport Club – BUCHAREST- ROMANIA
    	Steel Structure for  Gym Hall-  Calarasi – ROMANIA
    	Steel Structure for Olympic Hotel – Izvorani- ROMANIA
    	Stainless Steel Pipe Line for – EWK- Kaiserslautern – GERMANY 
    	Many self supporting steel structures-warenhouse , gym hall for school and colleges
    
    

  • February 2000 - December 2003

    manager production office, TMUCB

    • Slobozia, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    Responsabilities :
    Manufacture and installation of metal structures, industrial,
    manufacture and installation of technological piping systems , manufacturing and
    assembling vertical and horizontal metallic tank
    Responsabilities :
    Elaboration, negociation offers, technological preparation and
    production launch
    identify, establish and contracting of suppliers
    determination of the amount of labour of works
    monitoring of the execution of works on different stages
    coordination of drawing documentation of quality in relation to the stages of execution
    monitoring and establishing cash flow
    
    

  • August 1992 - January 2000

    construction site manager, TMUCB

    • Slobozia, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    Responsabilities :
    coordination and monitoring of the worksite preparation drawing up requirement
    material, equipment and human resources ,monthly reporting production
    coordination of the activity together with the designer and client requirements 
    project requirements analysis, technical analysis of the project establishment and
    development of welding technology, welding technology testing and testing personnel qualifications for welding
    Evidence and control of welding equipment.
    Planning Welding activity: 
    analysis using welding procedures and instructions.
    Preparing assembly and welding technologies for oil tanks installation,
    preparing budgets for welding and NDT inspection
    Achievements : 
    repairing technological systems pipes(catalitic cracking; reforming catalytic ) for ROMPETROL  Refinery-CONSTANTA -ROMANIA
    development of welding technologies WPS PQR in according with CR7;CR9 – ISCIR codes, ASME IX for different process  : GTAW(141) , SMAW(111)
    repairing technological systems pipes (catalitic cracking; reforming catalytic ) for PETROM -Brazi Refinery-ROMANIA  development of welding technologies WPS; PQR in according with CR7;CR9 – ISCIR codes  ,ASME IX, for different process  : GTAW(141) , SMAW(111)
    repairing technological systems pipes (catalitic cracking; reforming catalytic ) for PETROTEL  Refinery-TELEAJAN -ROMANIA ,development of welding technologies WPS; PQR in according with CR7;CR9 – ISCIR codes ,ASME IX for different process  : GTAW(141) , SMAW(111)
    Technological pipes systems for - IZVORUL RECE  brewery – SLOBOZIA – ROMANIA  development of welding technologies WPS ;PQR in according with CR7;CR9 – ISCIR codes ,ASME IX for different process  : GTAW(141) , SMAW(111)
    Repairing KELLOG installation - AMONIL SA –SLOBOZIA - ROMANIA development of welding  technologies WPS ;PQR in according with CR7;CR9 – ISCIR codes ,ASME IX for different process  : GTAW(141) , SMAW(111) 
    Metallic nitrogen Tank 22000mc for SC AMONIL SA SLOBOZIA-ROMANIA development of welding technologies WPS ;PQR in according with CR7;CR9;C4 – ISCIR codes , ASME IX for different process  : GTAW(141) , SMAW(111), SAW(121),GMAW(135),FCAW(136,138)
    Metallic diesel and gasoline fuel tank 5000mc si 2500mc SC PETROTRANS SA-PLOIESTI –ROMANIA  development of welding technologies WPS PQR in according with CR7;CR9 – ISCIR codes ,ASME IX for different process  : GTAW(141) , SMAW(111), GMAW(135), FCAW(136,138),SAW(121)
    Inert gas supply installations in steelmaking for TENARIS SA –CALARASI – ROMANIA 
    development of welding technologies WPS PQR in accordance with CR7;CR9 – ISCIR codes, ASME IX for different process  : GTAW(141) , SMAW(111)
    

Education

  • 1987 - 1992

    Master's degree, Polytechnic Institute of Bucharest

    • București, Romania

Skills

Driving license
  • B

Foreign languages

English
Advanced
Romanian
Native