125557

Asphalt and paving engineer at S.C. STRABAG ROMANIA S.R.L.

  • România, Filiași
  • România, Filiași
  • Romania, Filiași
  • Romania, Filiași
Deblocheaza date contact
Traduceri ale CV-ului
30%
  • Ultima actualizare: 23.01.2015
  • Numar referinta: 125557

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Avansat
Franceza
Mediu
Italiana
Incepator
Spaniola
Incepator
Romana
Nativ
80%
  • Last update: 23.01.2015
  • Reference number: 125557

Experience

  • July 2012 - August 2014

    Asphalt and paving engineer, S.C. STRABAG ROMANIA S.R.L.

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Junction of the A9 with A8 highway , Lomazzo site, Italy 
        - Paving base layer, binder, drainage course, splittmastix wearing course (SMA) 
    
    Rehabilitation of national road DN14
    -	Organizing, supervising and checking the work preceding paving layer of asphalt mixture.
    -	Ensure proper support layer before paving asphalt mixtures.
    -	Monitoring and checking the execution of works, in terms of quality and quantity.
    -	Collaborate with the technical and survey department, the asphalt plant
    -	Elaboration of daily reports.
    -	Paving AB 2, BADm 25 and MASF 16
    

  • November 2011 - July 2012

    Site Manager, S.C. EKY-SAM S.R.L.

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Streets in Iasi city – Vitejilor street
    -	Execution , supervision and coordination of construction works according to plans.
    -	Collaborate and liaise with representatives of the beneficiary and the State Construction Inspectorate.
    -	Provision of site with materials and equipment needed, requirements in preparation of materials.
    -	Preparation of the technical records.
    -	Overseeing the work performed by subcontractors.
    -	Coordination and supervision of construction works according to plans and their quality according to specifications
    
     Asphalt in Madarjac village  -   7 km of secondary roads
    
     Maintenance of roads in winter
    
    -	Coordinate equipment (4 autofreze, 6 trucks 6x4 with RSP, 5 graders) and personnel responsible for snow removal.
    -	Develop daily reports and statements of work
    -	Collaborate and liaise with representatives DJADP Iasi and subcontractor companies 
    -	The supply of salt and anti-slip
    

  • February 2008 - November 2011

    Site Manager, S.C. EUROCONSTRUCT GROUP S.R.L.

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Road reconstruction and flank reinforcement on national road DN 15 km 247+900, 259+200 - 259+600, 268+800 (with Benotto pillars and retaining walls)
    -	Execution of two networks of pillars to a depth of -22 m, 86 pillars at km 247+900 and 182 at km 259 +200 – 259+600, reinforced with concrete beams.
    -	Lowering the groundwater at km 259 200-259 600 with a network of 72 drainage sump.
    -	Reconsolidation of a retaining wall at km 268 +800 to protect the roadway from a landslide. Executing a surface drainage system arranged in herringbone on the landslide.
    -	Execution of a new retaining wall at km 247 +900 to protect the road from a landslide and a surface drainage system arranged in herringbone on the landslide.
    -	Road reconstruction at these two positions, execution of drainage ditches and two culverts.
    -	Collaborate and liaise with the consultant Search Corporation and State Inspectorate in Construction
    -	Supply the site with materials and equipment necessary
    
    Streets in Iasi city - Str. Arcu, Hatman Sendrea, Ciurchi, B-dul Socola, Moara de Vant, Fagului, Frederick, Aviatiei, Lt. Negel
    -	Execution , supervision and coordination of construction works according to plans.
    -	Collaborate and liaise with representatives of the beneficiary and the State Construction Inspectorate.
    -	Provision of site with materials and equipment needed, requirements in preparation of materials.
    -	Preparation of the technical records.
    -	Coordination and supervision of construction works according to plans and their quality according to specifications
    
    Upgrading DJ 282, 282C, 282B, Iasi - Botosani (38 km of secondary roads with 2 new bridges and 5 to reinforce)
    -	Execution in the proportion of 30% of the 38 km of county roads, two new bridges, five bridges consolidated
    -	Milling of degraded asphalt by Wirtgen W 2000 (190.000 sqm)
    -	Execution of 20 km from the contract with ballast optimal mix layer and reception on a legth of 10 km of crushed stone layer (35.000 to).
    -	8 km of road with BAD 25 and 7 km with BA8 asphalt layers
    
     Upgrading DC 26 Cogeasca – F.E.A.D.R. – 4km new road sistem
    
     Maintenance of roads in winter
    
    -	Coordinate equipment (2 autofreze, 7 trucks 6x4 with RSP, 4 graders) and personnel responsible for snow removal.
    -	Develop daily reports and statements of work
    -	Collaborate and liaise with representatives DJADP Iasi
    -	The supply of salt and anti-slip
    

  • January 2007 - February 2008

    Road Engineer, S.C. Constructii Feroviare Iasi - Grup COLAS S.A.

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Contract 4R12, Reabilitare DN17 (E 576)
    -	Organizing, supervising and checking the work preceding paving layer of asphalt mixture.
    -	Ensure proper support layer before paving asphalt mixtures.
    -	Monitoring and checking the execution of works, in terms of quality and quantity.
    -	Collaborate with the technical and topo department for any inconsistencies with the project.
    -	Elaboration of daily reports.
    -	Preparation of PVLA and PVRC
    -	Paving AB 2, BAD 25
    
    Asphalt layer on by-pass Vatra Dornei
    -	Organizing, supervising and checking the work preceding paving layer of asphalt mixture.
    -	Ensure proper support layer before paving asphalt mixtures.
    -	Monitoring and checking the execution of works, in terms of quality and quantity.
    -	Paving BA 16
    
    Paving streets in Suceava city
    -	Organizing, supervising and checking the work preceding paving layer of asphalt mixture.
    -	Ensure proper support layer before paving asphalt mixtures.
    -	Monitoring and checking the execution of works, in terms of quality and quantity.
    -	Paving AB2, BADPC 25, BA 16

  • March 2004 - April 2006

    Site Manager, S.C. Antrepriza de Lucrari Drumuri si Poduri Iasi S.A, Iasi

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Upgrading road system DN 24 , Iasi  - 1 km
    Asphalt layers on DJ 280 Strunga – Oteleni - 4km
    Upgrading DC 78A Dagita-Poienari - 12 km new road system
    Upgrading DC 55 Comarna – 5 km new road system
    Asphalt layer on DJ 244 Podu Hagiului – Cozmesti 2 km
    Asphalt layers on Moldova Mall parking – 15.000 sqm
    Upgrading DJ Podu Iloaiei- Ierbiceni – 1 km
    Enlargement Iulius Mall parking place
    Coordinate equipment and personnel responsible for snow removal
    

Education

  • 2010 - 2010

    Postdoctorate, -

    • Filiași, Romania
  • 1998 - 2003

    Bachelor's degree, Technical University “Gh Asachi” Iasi Construction College

    • Filiași, Romania
  • 1994 - 1998

    Highschool, Theoretical Highschool “Gh. Vranceanu” Bacau

    • Bacău, Romania

Skills

Driving license
  • B

Foreign languages

English
Advanced
French
Intermediate
Italian
Beginner
Spanish
Beginner
Romanian
Native