131500

lacatus pipefiter la sc saldimpiant srl

  • România, Tulcea
  • România, Tulcea
  • Romania, Tulcea
  • Romania, Tulcea
Deblocheaza date contact
Traduceri ale CV-ului
95%
  • Ultima actualizare: 21.05.2015
  • Numar referinta: 131500

Obiectiv profesional

un loc de munca in strainatate,

  • strainatate
  • Full time
  • Salariul dorit2200 €
  • Domeniile urmariteMuncitori Tehnicieni Naval, Servicii Transport / Logistica / Naval
  • Disponibilitate deplasare in interes de serviciuPana la 100% din program
  • Disponibilitate relocareNumai in strainatate

Experienta

  • martie 2014 - noiembrie 2014

    lacatus pipefiter, sc saldimpiant srl

    • guaruja, Brazilia
    • Part time
    • Domeniu - Muncitori Tehnicieni: Muncitori,Naval

    -Quality control, measurement of structural elements of modules prior to pre-assembling, measuring during pre-assembling and after installation. I would perform the measurements with measuring equipments, optical level, theodolite, laser. Among other responsibilities there were included preparing materials, transporting them to their workstations,  checking after isometric drawing of each piece of pipe and positioning each item in the construction,
                - in terms of operations and materials used,  “I” metallic structure profiles and the pipes were performed according to drawings. Determining  the size of the profile or the pipes by measuring them with the tape line after which we would  on to preparing the joint heads by removing the excess and modeling by the shape of drawing - then polishing to layer to metal shine layer, so that the heads had no bumps or burns resulted from cutting,  all profiles had to be cut according to exact standards of plus or minus 1-2 mm observing the angle of 90 degrees, after making parts for joining, leaving lufts of  4-5 mm for welding, regardless of position welding, Luft had to be observed,  after completion coupling  compounds would be handed over,  after which we would proceed to welding.
                 - Equipment used: overalls, helmet, boots with steel toecap, gloves (welders, locksmiths), goggles, welding masks, ear plugs, hammer, chisels, grinders, oxy-fuel cutting machine, plasma cutters, inverters , ESAB, for pipes bubble level, adjustable laser, goniometer, sheet supports for alignment and centering,  marking pin mapped, copiers, etc.
                 - For tubing operations:  tube length would be established according to isometric drawing ,cut to size, then chamfered at 45 degrees, then  polished to shine metal, then joining of tube with another tube or bends in varying sizes was performed, determining whether  according to drawing on the tube there were mounted flanges or devices, reducers,  tees,  referring to the thickness in millimeters.
                              -An example: if the tee was thicker than the pipe we would proceed to grinding, depending on the thickness of pipes (roughing) as not to be shaded out by welding film, stainless steel pipes,  paying attention not to have contact with iron to avoid contamination , preparation gas chambers before welding, covering works with tilt (when we worked outside and when it was windy) for the argon welder to avoid losing argon gas, steel pipes would be wrapped with plastic  until delivery,  pipes, elbows, tees, reducers, flanges, fittings, valves, screws, etc. all these were determined  by isometric technical drawings and parts catalogs, assembly of modules of pipe were made according to certain criteria to determine installation, elevation, north, south, east , west, marking the exact levels where the pipe module had to be installed,  after the module was mounted, upon completion an inspection  would be performed, assembling pipe modules would be using plastic straps, tri-blocks, small cranes, metal stands, etc. For a good activity we had to  ensure all materials and tools before and during work operations, establishing design mistakes before starting work

  • mai 2013 - februarie 2014

    lacatus, sc mayer werft

    • papenburg, Germania
    • Full time
    • Domeniu - Muncitori Tehnicieni: Naval

    Operations and Materials:
                        -Assembly, pre- assembly, oxy-fuel cutting.
                     Line assembly:
                -Fitting parts (brackets, reinforced ribs, rib profile sheets of different thicknesses, lengths, flanged brackets, brackets, pedestals, beams, “i:, “t” profiles, stiffening plates, etc.) would be traced on the sheet where structure elements had been mounted, then marking would be performed, thickness would be marked,  then the identification number of the part that would be installed on site, looking for pieces that had to match the drawing board and after that welding of points would be performed,  the grinding of edges, polishing remaining welding edges, taking into account the cross-cutting seams, trimming away the excess resulted from cutting taking into account the distance from welding to the center trimming, removing plates that remained during the assembly, the grind after removal, taking into account the distances to be exact, or in some cases within tolerances for welds before handing- over it would be taken into account that were are no burns from the electrodes on the sheet board, to be clean, with no table scraps, with no parts or sealing plate missing, with no too large deformations are, additional compounds, etc.
                       Pre-assembly line:
                   -upon the completion of panels or structure elements we would move to pre- assembly phase, where panels would be assembled together to form sections, would  be fully completed with all data components in the design of respective section,  taking into account alignments, unloading, angle of inclination, thickness, luft, penetration, the position of each piece then handing-over for inspection
                       The assembly line:
                   - upon the completion of sections, mounting in position would be performed, each section would be then transported with trailers to assembly site,  wire ropes (when the section was assembled turned we would overturn them), then we would mark the position where mounting section was to be assembled), then the section would to assembly site , fastened with the mechanical or hydraulic tie rods, then detecting measuring would be performed  in accordance with the technical design to check whether they came with extra sheet board and the excess would then be removed by oxy-gas or plasma cutting, where stainless steel was missing, then we would lower the section (sections were in place), after which we would pass to welding proper and final welding.

  • septembrie 2012 - martie 2013

    lacatus,tubulator, sc b metal srl

    • tortoly sardinia, Italia
    • Full time
    • Domeniu - Muncitori Tehnicieni: Muncitori,Naval

    - Steel structures and piping for oil refineries
                                   Responsibilities:
                   -Quality control, measurement of structural elements of modules prior to pre-assembling, measuring during pre-assembling and after installation. I would perform the measurements with measuring equipments, optical level, theodolite, laser. Among other responsibilities there were included preparing materials, transporting them to their workstations, handing over materials to workers, organizing prepared materials for the next stage per each module, checking after isometric drawing of each piece of pipe and positioning each item in the constructi0n.
                - in terms of operations and materials used,  “I” metallic structure profiles and the pipes were performed according to drawings. Determining  the size of the profile or the pipes by measuring them with the tape line after which we would  on to preparing the joint heads by removing the excess and modeling by the shape of drawing - then polishing to layer to metal shine layer, so that the heads had no bumps or burns resulted from cutting,  all profiles had to be cut according to exact standards of plus or minus 1-2 mm observing the angle of 90 degrees, after making parts for joining, leaving lufts of  4-5 mm for welding, regardless of position welding, Luft had to be observed,  after completion coupling  compounds would be handed over,  after which we would proceed to welding.
                 - Equipment used: overalls, helmet, boots with steel toecap, gloves (welders, locksmiths), goggles, welding masks, ear plugs, hammer, chisels, grinders, oxy-fuel cutting machine, plasma cutters, inverters , ESAB, for pipes bubble level, adjustable laser, goniometer, sheet supports for alignment and centering,  marking pin mapped, copiers, etc.
                 - For tubing operations:  tube length would be established according to isometric drawing ,cut to size, then chamfered at 45 degrees, then  polished to shine metal, then joining of tube with another tube or bends in varying sizes was performed, determining whether  according to drawing on the tube there were mounted flanges or devices, reducers,  tees,  referring to the thickness in millimiters.

Educatie

  • 1993 - 1997

    Liceu / scoala profesionala, grup scolar industrial constructii de masini tulcea

    • Constructii De Masini
    • Tulcea, România

Aptitudini

Permis de conducere
  • B
  • Capacitate de a munci in echipa
  • Putere de organizare si disciplina
  • Flexibilitate si adaptabilitate

desen tehnic .pictura,arta.

Limbi straine

Engleza
Avansat
Italiana
Avansat
Spaniola
Mediu
Romana
Nativ

Distinctii

Hobby
pictura, grafica

Pre-interviu

Cum ti-ai descrie personalitatea?

inventiv,creativ,modest,

Care sunt telurile tale in viata?

familia ,realizarea

Descrie jobul ideal pentru tine.

de preferinta sa fie un loc de munca stabil

Care sunt scopurile pe care ti le-ai stabilit in cariera ta?

evolutie in domeniul munci si obtinerea unui salariu motivat

Esti mai motivat lucrand in echipa sau in mod individual?

ambele

Ce job ti-ar place sa ai peste 5 ani?

inginer,tehnician in industria oil-gas

La actualul sau fostul loc de munca, care au fost/sunt cele mai importante 5 realizari?

mai multa experienta,performanta in comunicare indiferite limbi straine.adaptare la un nou mod de viata

Ce fel de salariu meriti?

atractiv

Poti lucra dupa termene limita, sub presiune, etc?

da

Care a fost ultima carte pe care ai citit-o?

un roman' baltagul'

35%
  • Last update: 21.05.2015
  • Reference number: 131500

Career goals


                            

  • strainatate
  • Full time
  • Salary wanted2200 €
  • Wanted work domainsTechnicians Naval, Services Transport / Logistics / Naval
  • Availability for work related travelUp to 100% of the schedule
  • Willing to relocateOnly abroad

Skills

Driving license
  • B
  • Ability to work in team
  • Organization skills
  • Flexibility and adaptability

Foreign languages

English
Advanced
Italian
Advanced
Spanish
Intermediate
Romanian
Native