13445

Fitter at 3 C Metal Middle East

  • România, Onești
  • România, Onești
  • Romania, Onești
  • Romania, Onești
Deblocheaza date contact
Traduceri ale CV-ului
100%
  • Ultima actualizare: 3 apr.
  • Numar referinta: 13445

Obiectiv profesional

Vreau sa lucrez intr-un proiect de durata, in domeniile; petrol si gaze, energetic, naval, constructii

  • All States
  • Full time
  • Salariul dorit2000 €
  • Domeniile urmariteInginerie Electrica / Mecanica, Inginerie Industrii / Productie, Muncitori Tehnicieni Naval
  • Disponibilitate deplasare in interes de serviciuPana la 100% din program
  • Disponibilitate relocareNumai in strainatate

Experienta

  • mai 2015 - iulie 2015

    Lacatus mecanic, VCS Montazh LLC, Rusia

    • Sankt Petersburg, Rusia
    • Full time
    • Domeniu - Inginerie: Constructii

    Domeniu: Inginerie/Proiectare Activități/Sarcini: Sankt Petersburg Western High Speed Diameter project, Functia;  Calderero Constructia de poduri si autostrazi suspendate. Am realizat centrarea axiala a grinzilor, alinierea coastelor si a bulbilor, ajustarea tablelor de imbinat folosind aparate oxi-gaz si arc-aer, punctarea reperelor prin sudura cu electrod sau CO2, conform desenelor de executie.

  • martie 2015 - mai 2015

    Lacatis confectii metalice, SC LamPa Lavorationi Metaliche

    • Constanța, România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Naval

    Domeniu: Industria navală Activități/Sarcini: Atelierul Naval Constanta, Calderero Am facut confectii de structuri metalice, suporti teava, pasarele, podete, conform desenelor de executie

  • ianuarie 2015 - martie 2015

    Lacatus tevar, Rhors AG Soltau Germania

    • Amsterdam, Olanda
    • Full time
    • Domeniu - Inginerie: Industrii / Productie

    Domeniu: Industria metalurgică Activități/Sarcini: Revizie la otelaria Tata Steel, Velsen Noord Olanda. Am efectuat revizia a doua cazane de inalta presiune prin schimbarea conductelor corodate precum si constructia si montarea unei conducte de 6 inch conform desenelor izometrice

  • august 2014 - noiembrie 2014

    Plumber, SC Petroconsult Romania for UTC India

    • Doha, Qatar
    • Full time
    • Domeniu - Muncitori Tehnicieni: Instalatii / Amenajari

    I performed works construction and assembly pipe lines and fittings from ½” to 1.1/2 inch for air conditioning, then perform hydraulic pressure tests.
    I mounted washbasins, bidets, toilets and batteries related connections.

  • aprilie 2014 - iunie 2014

    Pipefitter, SC Comoserv Srl

    • Ploiești, România
    • Full time
    • Domeniu - Inginerie: Industrii / Productie

    Revision in PETROBRAZI OMV  Refinery, Ploiesti, Romania	
    Construction and mounting locksmith, pipefitter	
    In Catalytic Cracking Plant
    -	Encased pillars to the structure of resistance of the reactor, to substitute the cover( cover by five cyclones instead of four cyclones)
    -	In chamfer cutting with grinder, metal plate thicknesses of 30 and 50 mm, lifting and centering of the metals plate on pillars and preparation for welding.
    In Catalytic Reforming 2 Plant, hydro-pressure testing of the pipe routes.
      I made pickling works and replacement heat insulation of basalt wool mattresses or polystyrene shells.

  • februarie 2014 - aprilie 2014

    Mecanic, SC Comoserv Srl

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Industrii / Productie

    Domeniu: Industrie – Producție Activități/Sarcini: Proiect in Holzindustrie Swhweighofer Comanesti, Bacau pentru Biele Group Spain, Montator - Am construit si montat tubulatura de aer conditionat, liniile de apa si incendiu. - Am realizat alinierea si centrarea meselor de presa pentru panouri si furnire - Am construit si montat traseele de cablaj pentru aparatura si reteaua electrica

  • martie 2008 - aprilie 2012

    Lacatus constructii si montaj, Tecnologia y Montaje, SA., Naron/LaCoruna, Spania

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Energie / Industrii extractive,Industrii / Productie

     Rafinaria Petronor din Muskiz/ Bizkaya.
      Am participat la revizii in instalatiile ACD-3 si RB-4; Am introdus discuri pentru izolarea echipamentelor statice( coloane, reactoare, schimbatoare de caldura, racitoare ventilatoare de aer, cuptoare, cazane de abur si apa calda, rezervoare, linii tehnologice) si am efectuat probe de presiune cu pompe hidraulice si cu aer. 
    Am dezechipat  coloanele de talere, gratare si filtre pentru verificare si inlocuirea celor necomforme, am demontat si inlocuit patru baterii racitoare cu aer, am demontat, construit si inlocuit traseele de teava uzate folosind tirfore, palane manuale cu brat si cu lant, elevatoare( nacela – lift), automacarale.
    Am participat la constructia a doua sectii noi; Cocsare si Congenerare unde am confectionat si montat structuri metalice pentru toate tipurile de echipamente statice si dinamice, precum si trasee tehnologie, armaturi, podete, platforme, scari de acces. Am participat la montarea unei imense macarale fixe de 1200 tone, cu ajutorul careia am pozitionat si montat doua camere de cocs si multe elemente de sustinere si deservire ale acestora. Am montat hala compresoare de gaz; structurile metalice, peretii si acoperisul din tabla cutata, jgheaburi, cale de rulare pentru macara pod mobil, legaturi teava si armaturi aferente.
     Am efectuat revizie in Terminalul Maritim( Santurtzi/ Bizkaya) ce deserveste rafinaria; am taiat , confectionat si inlocuit traseele de teva compromise, am confectionat si inlocuit suportii de teva, pasarele si platforme.
    Toate activitatile au fost desfasurate conform planurilor si schitelor de executie si montaj.
       Santierul Naval Constructiones Navales del Norte din Sestao/ Bizkaya.
    Lucrari efectuate; confectionare blocsectii de nava( pregatirea si imbinarea de repere, pereti si coaste prin punctare cu sudura cuCO2). Am efectuat lucrari pentru alinierea longitudinala si transversala a blocurilor de nava( sudare de opritori si intinzatori, fixarea cricurilor hidraulice) prin metoda de asamblare din blocsectii( sectii de dublufund si punti de comanda.
    Am efectuat lucrari de curatare a sudurilor( cu polizoare unghiulare si drepte) in vederea inspectarii sudurilor, montaj de gratare, suporti, treceri pentru cablaje electrice.
       Rafinaria Repsol LaCoruna -  revizii in instalatiile Sulf  si Cocsare; am demontat trasee de teava si armaturile aferente pentru repararea sau inlocuirea acastora, am inlocuit tubulatura compromisa din cuptoare( teava P9 si P11, prin taierea cu arc-aer si refacerea sanfrenelor), am demontat si verificat arzatoarele de gaz, am demontat si reechipat coloane cu talere, gratare, filtre.
    Am montat un reactor mare; pozitionat si centrat( strangere cu cheia dinamométrica), montaj structura metalica de platforme si echipamentele necesare functionarii, echilibrare si strangere capac cu chei hidraulice.
       Rafinaria de bioetanol din Babilafuente/ Salamanca.
    Am participat la dezmembrarea, constructia si montarea a trei tancuri de depozitare in regim de urgenta( sa lucrat 14 – 16 ore zilnic, timp de 52 de zile). Am construit cele trei rezervoare( cu diametre de 6, 8, si 12m, din tabla verolata de 4mm si sudare cu CO2), apoi le-am pozitionat cu doua automacarale si am refacut traseele de teava si structurile necesare deservirii acestora.
       Atelierul firmei Tecnologia y Montaje din Naron, LaCoruna.
    Am lucrat primele doua luni de zile si am pregatit structuri, tubulaturi, echipamente pentru montaj in rafinarii, santiere navale si alte puncte de lucru.
    Am lucrat cu polizoare unghiulare si biaxuri, aparate oxigaz, sudura cu electrod si CO2, fierastrau mecanic cu banda, masini de indoit tevi si profile, valturi roluit tabla, macarale poduri mobile, tirfore, macarale de mana cu lant si cu brat.
    Referinte: Inginer Antonio Riveira, Tel. +34676480659.
    
    

  • ianuarie 2004 - martie 2008

    Mecanic intretinere si reparatii, SC RAFO S.A., Onesti

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Industrii / Productie

      Mecanic intretinere si reparatii la Atelierul Mecanic Central.
    Am efectuat intretinere si reparatii echipamente statice in toate sectiile rafinariei; coloane( demontari si echipari cu talere, gratare, filtre), schimbatoare de caldura( demontare si inlocuire dupa caz, probe de presiune in tevi si in manta), reactoare, cuptoare, racitoare cu aer, cazane de abur si apa calda, reparatii rezervoare de toate tipurile si marimile, podete, pasarele, confectii metalice pentru structuri de sustinere si trasee tehnologice( in special OL si mai rar inox, cupru si P-uri), lucrari cazangerie( debitari table, mandrinari teava la schimbatoare de caldura, pregatiri trasee teava dupa plan).
    

  • iulie 1994 - ianuarie 2001

    Mecanic intretinere si reparatii, SC Rafomet Srl., Onesti

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Industrii / Productie

      Mecanic intretinere si reparatii instalatie de reciclare namoluri.
     Am efectuat lucrari de reparatii la rezervoare depozite si cisterne de transport folosind aparate oxiacetilena si suduri cu electrod. Reparatii si inlocuiri de pompe transversale( schimbari bucse, axuri descentrate, rulmenti, etansari cu snur de azbest si carbune, rotoare), inlocuire serpentine din teava la cazanele de abur si apa firbinte, confectii metalice si diverse structuri metalice pentru hale de productie( piloni, grinzi, suporti).
    

  • august 1989 - iunie 1994

    lacatus confectii metalice si montaj, SC Trotusul S.A., Onesti

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Energie / Industrii extractive

      Executii lucrari confectii metalice si tinichigerie pentru izolatii trasee industriale, diferite depozite industriale, tubulaturi ventilatoare de aer; am efectuat lucrari de vopsitorie echipamente si instalatii industriale; am lucrat la statie betoane, precum si turnarea de boltari de beton si zgura, deasemenea am efectuat lucrari de constructii civile(zidarie, vopsitorie, amenajari interioare si exterioare, lucrari de instalatii sanitare).

Educatie

  • 1985 - 1989

    Liceu / scoala profesionala, Liceul Energetic

    • Energetica
    • Onești, România

Aptitudini

Permis de conducere
  • B
  • Spirit practic
  • Atitudine pozitiva si optimism
  • Flexibilitate si adaptabilitate

Am spirit de echipa, o buna capacitate de comunicare, adaptare la lucruri noi, organizat si disciplinat, bun sportiv, bune abilitati de lucru cu PC,

Limbi straine

Engleza
Mediu
Spaniola
Avansat
Romana
Nativ
100%
  • Last update: 3 apr.
  • Reference number: 13445

Career goals

I wish to work in projects duration the field oil&gas, energy, shipbuilding, constructions.

  • All States
  • Full time
  • Salary wanted2000 €
  • Wanted work domainsEngineering Electrical / Mechanical, Engineering Industries / Production / Manufacturing, Technicians Naval
  • Availability for work related travelUp to 100% of the schedule
  • Willing to relocateOnly abroad

Experience

  • November 2015 - December 2015

    Fitter, 3 C Metal Middle East

    • Offshore - Rig Apollo, Congo
    • Full time
    • Work domain - Technicians: Naval

    Project Apollo; Replacement of pipe routes/LWRP Structure and Flat Pack Platforms.

  • May 2015 - July 2015

    Locksmith, VCS Montazh LLC, Russian

    • Sankt Petersburg, Russia
    • Full time
    • Work domain - Engineering: Construction

    Sankt Petersburg Western High Speed Diameter Project
    Metal Construction Locksmith
    The construction of 620 meter and580 meter suspension bridges, a168 meter sea-canal bridge. In particular, installation of the structures will be carried out using the Launching Method. This is how the installation of superstructures in the final position by moving then along the bridge axis is called.
     I realized centering axial girders by aligning the ribs and the bulbs in according to drawings, the adjustment the plates using oxy-gas and arc-air cutting.
     I built pedestals and brackets for supports and guide the girders.

  • March 2015 - May 2015

    Construction Locksmith, SC LAM PA Lavorationi Metaliche

    • Constanța, Romania
    • Full time
    • Work domain - Technicians: Naval

    Workshop Constanta Shipyard
    Metal Construction Locksmith, Pipefitter
    Confections of metallic structures, pipe support, carbon and carbon pipe constructions spools with size between from ¾ to 24 inch.

  • January 2015 - March 2015

    Pipefitter, Rhors AG Soltau Germany

    • Amsterdam, Netherlands
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Revision in to a steel mill TATA STEEL, VELSEN-NOORD/ Nederland
    Pipefitter
    I made the constructions and replacement of carbon pipe routes from 1,1/4 to 8 inch as isometric drawings.

  • August 2014 - November 2014

    Plumber, Petroconsult Romania for UTC India

    • Doha, Qatar
    • Full time
    • Work domain - Technicians: Installations / Decorations

    PETROCONSULT Romania for URBACON Trading & Contracting
    Sheraton Doha Qatar  Resort & Convention Hotel
    Plumber
    I performed works construction and assembly pipe lines and fittings from ½” to 1.1/2 inch for air conditioning, then perform hydraulic pressure tests.
    I mounted washbasins, bidets, toilets and batteries related connections.

  • April 2014 - June 2014

    Pipefitter, SC Cmoserv

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Revision in PETROBRAZI OMV  Refinery, Ploiesti, Romania	
    Construction and mounting locksmith, pipefitter	
    In Catalytic Cracking Plant
    -	Encased pillars to the structure of resistance of the reactor, to substitute the cover( cover by five cyclones instead of four cyclones)
    -	In chamfer cutting with grinder, metal plate thicknesses of 30 and 50 mm, lifting and centering of the metals plate on pillars and preparation for welding.
    In Catalytic Reforming 2 Plant, hydro-pressure testing of the pipe routes.
      I made pickling works and replacement heat insulation of basalt wool mattresses or polystyrene shells.

  • February 2014 - April 2014

    Mechanic, SC INTERSERV Romania for BIELE Group Espania

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Mounting and balancing production line for the manufacture of wood panels, wiring harness and electrical connections.

  • March 2008 - April 2012

    Construction and mounting locksmith, Tecnologia y Montaje,SA.,Naron/LaCoruna, Spania

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries,Industries / Production / Manufacturing

    • Dates 	September  2012 -  November 2012	
    • Name and address of employer	 TECNYMO SA, NARON/LACORUNA, SPAIN	
    • Activity Field
    	Revision in PETRONOR Refinery, Bilbao, Spain 	
    • Occupation or position held	Mechanical Technician	
    • Main activities and responsibilities	Revision in RB4 Plant 
    -	participation in the performing  of works in order to begin revision of: static                                    equipment (columns/vessels, reactors, heat exchangers, air coolers); rotating equipment (centrifugal pumps, compressors, blowers, fans);
     -       execution of technological pipelines as per the flow diagram;
           Mounted elbows of pipes, flanges and valves related to the crane load; 
    Regarding the pipe works: beveling, threading, pipe bending, pipe routes and assembly.
    Participation in the work with fire or without fire, the digging work, working at heights / closed vessels that run in the area of operation
    
    
     	
    • Dates 		February   2012 -  June 2012
    • Name and address of employer		TECNYMO SA, NARON/LACORUNA,  SPAIN
    • Activity Field
    		 Revision Refinery PETRONOR, Bilbao, Spain
    • Occupation or position held		Mechanical Technician
    • Main activities and responsibilities		Revision in HD3 Plant
             -    I attended the revisions in HD4 plants participating in the insertion of disks to isolate static equipment(columns, reactors, heat exchangers, cooling air fans, production lines) and conducted pressure tests(hydraulic pumps and pneumatic). I also uninstalled columns grills and filters for verification, removed the pipe routes and fittings for verification and replacement of worn, using winch, manual chain hoists and arm and nacelle elevator.
    -cleaning and washing activities for  refineries and industrial equipment  using  high pressure jet pumps URACA and special accessories such as guns, long and short    flexible rods, blasting system;
     -mounted elbows of pipes, flanges and valves related to the crane load; 
    Regarding the pipe works: beveling, threading, pipe bending, pipe routes and assembly.
    Participation in the work with fire or without fire, the digging work, working at heights / closed vessels that run in the area of operation.
    
    
    
     
    
    • Dates 		 September  2009 -  December  2011
    • Name and address of employer		TECNIMO SA, NARON/LACORUNA, SPAIN
    • Activity Field
    		The construction of the Coking Plant and the Cogeneration Plant  in
    PETRONOR  Refinery of BILBAO, SPAIN
    
    • Occupation or position held		Mechanical Technician
    • Main activities and responsibilities		I participated in the construction, pre-commissioning and commissioning of two new plants: Coking and Cogeneration installations – built and installed support structures for pipe routes, construction and mounting the pipe lines  and  fittings related in according to flow diagram, hydraulic and pneumatic testing, access platforms and stairs. I attended the installation of a fixed crane of 1200 tons and the positioning and installation of two large reactors (I balanced and tightened lids reactor with hydraulic keys,  I mounted pipe and fittings routes related).
    I mounted compressor hall, the walls on roof plate, gutters and running path bridge crane.
    - Pre-alignments and alignments of rotating equipment: compressors of gas, centrifugal pumps.
    Participation in the work with fire or without fire, the digging work, working at heights / closed vessels that run in the area of operation
    
    I also participated in these works:
    Steel structures for scaffolds, their routes and assembling technology;
    Assembling of pipes elbows, flanges and valves related to the crane load;
    -I participated in the commissioning of the Cogeneration Plant and I am assured maintenance.
    - I performed revision in Maritime Terminal PETRONOR REFINERY: I cut and replaced damaged pipe routes and fittings (pipe using by 6 until 24 inches) and also made and replaced pipe supports, walkways, platforms and access stairs in according   to isometric sketch.
    
     
     Dates 		September 2008-  September 2009
    • Name and address of employer		TECNYMO SA, NARON/LACORUNA, SPAIN
    • Activity Field		SHEIPHARD CONSTRUCTIONS OF NORTH, SESTAO/BIZKAIA
    
    • Occupation or position held		Construction and mounting locksmith
    • Main activities and responsibilities		Field of activity: manufacture of ship block section, welding point out landmarks, ribs and walls with MIG/MAG/CO2 and electrode welding after sketch. I conducted longitudinal and transverse alignment works for blocks of ship( welding to stop and stretch, fixing hydraulic jacks, method of assembly of block section( sections double bottom and navigating bridge), work cleaning welds mode with angular grinder and grinder straight for inspection of welds, mounting brackets, grills and electrical wiring crossings.
    
    
    • Dates 		August 2008 – September 2008
    • Name and address of employer		TECNYMO SA, NARON/LACORUNA, SPAIN
    • Activity Field		Revision in REPSOL Refinery LACORUNA, Spain
    
    • Occupation or position held		Mechanical Technician
    • Main activities and responsibilities		I made revisions of Sulfur and Coking Plants; I removed pipe routes and fittings for the modification or replacement of the damaged ones, I replaced the furnace duct compromised ( special pipes- P9 and P11) by air arc cutting and chamfering recovery, I removed, inspected and replaced gas burners, I disassembled and retrofitted columns with plates, grills and filters, I positioned and installed two new heat exchangers (mounting, pressure tests in pipes and mantle, assembly pipe connections and fittings) and was involved in the  execution of technological pipelines as per the process flow diagram(PFD).
    
    
    • Dates 		June 2008 – August 2008
    • Name and address of employer		TECNYMO SA, NARON/LACORUNA, SPAIN
    • Activity Field		Revision in BABILAFUENTE/SALAMANCA Biodiesel Refinery, Spain
    
    • Occupation or position held		Mechanical Technician
    • Main activities and responsibilities		I participated in the dismantling and construction of three storage tanks with fixed roof, the built of the three small tank( with diameter to eight meters and four rows of sheet metal with MIG/MAG/CO2 and electrode welding), then placed with two cranes and I rebuilt pipes routes and structures their service.
    Materials: galvanized sheet by 4 mm in thickness, installation process starting with the top and fixed cover then mount the last sheet down and bottom reservoirs. I used for mounting; winch,  the elevators, chain hoists and arm hoists .
    
    		
    • Dates 		April 2008 – June 2008
    • Name and address of employer		TECNYMO SA., Avda. Condesa CAVALCANTI, 5- NARON/LACORUNA, SPAIN
     Reference: ENGINEER  Antonio Ribeiro, Tel. (0034)676480659
    
    • Activity Field		The Workshop TECNYMO SA,
    • Occupation or position held		 Mechanical Locksmith
    • Main activities and responsibilities		I worked two months, were I prepared structures, piping, equipment installation for refineries and shipyards in according to construction plans.
    I also worked with angle grinders, straight grinder, pipe and profile bending machine, plate rolling rollers, crane- drawbridges, oxy device, welding electrode and CO2.
    
    
    
    
    

  • January 2004 - March 2008

    Maintenance mechanical, SC RAFO S.A.,Onesti

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    January 2004- March 2008
    SC RAFO SA ONESTI 
    Industriilor Str., No.3 ONESTI-BACAU
    to Central Mechanical Workshop of Refinery 
    
    Mechanical Technician Maintenance
    I made static equipment maintenance and repairs in all plants of the refinery; columns (dismantling and fitting of plates, grills, filters), heat exchangers( removal and replacement if necessary, pressure tests on pipe and mantle), reactors(damaged pipe replacement, pressure tests, change catalyst), furnaces( inspection and replacement of burners damaged pipe- special pipe P 9 and P 11), steam and hot water boilers, repair or replacement of serpentines, repairs tankers with fixed or floating covers(replacements defects boards from tanker bottoms and walls, replacement of heating serpentines and the floating table covers who had defects). I made repairs or reconstructions to walkways, bridges, pipe lines and fittings works carried out for lubrication – cooling , involving welding jobs, grinding, rigging, heat treatment, hydraulic or pneumatic tests, access stairs, metal support structures and path for technological, work cutting boards, mandrel pipe to the heat exchangers( especially OL and isolated stainless, copper and P).
    
    
    

  • July 1994 - January 2001

    Construction and mounthing locksmith, SC Rafomet Srl., Onesti

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

     November 1995–  January 2004
    SC RAFOMET SRL of  RAFO SA ONESTI 
    No.3 Industriilor Street, ONESTI-BACAU
    Sludge Recycling Plant of RAFO- ONESTI
    
    Mechanical Technician
    I worked in sludge recycling plant.
      I made repairs to storage tanks and rail tanks using oxy device, welding electrode and blackboard with thickness up to 20 mm. Repairs and replacement transversal pumps (change the bushings, sealing asbestos or coal, decentered shafts, spent bearings, rotors).
    I replaced serpentines pipe to steam boilers and hot water, metal and various structures for production halls (pillars, beams and supports).
    
    

  • August 1989 - June 1994

    Locksmith steel confection, SC Trotusul S.A., Onesti

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

     Work performed:   I made metal fabrication of various types of materials; UPN, IPN, H profiles, square and rectangular pipe for various support structures and construction of Chemical Plant of Borzesti.
    I made tinsmith work with galvanized sheet with thicknesses up to 0,8 mm for: insulation technological lines, tankers, fan housings and tubing for air and industrial equipment paint works.
    I worked at the concrete station where I poured various forms of concrete and the slag. I have done civil work( brickwork, painting, interior and exterior of arranging workings, plumbing).
    
    

Education

  • 1985 - 1989

    Highschool, Energy High School

    • Energetics
    • Onești, Romania

Skills

Driving license
  • B
  • Practical spirit
  • Positive attitude and optimism
  • Flexibility and adaptability

I am team spirit, synthesis capacity, management capacity more of 
 the same time, capacity of decision, good communication skills.

Foreign languages

English
Intermediate
Spanish
Advanced
Romanian
Native