14497

Site manager-Mechanical engineer la SC ELECTROALFA INTERNATINAL SRL

  • România
  • România
  • Romania
  • Romania
Deblocheaza date contact
Traduceri ale CV-ului
80%
  • Ultima actualizare: 21 iul.
  • Numar referinta: 14497

Experienta

  • decembrie 2014 - Prezent

    Site manager-Mechanical engineer, SC ELECTROALFA INTERNATINAL SRL

    • Botoșani, România
    • Full time
    • Domeniu - Inginerie: Constructii

    Reponsabilities:
    ▪	Check the documentation, setting priorities 
    ▪	Preparing the necessary materials and manpower
    ▪	Preparing work plans, graphics production
    ▪	Drawing execution procedures
    ▪	Analyzing the  offers and establishing  the subcontractors
    ▪	Supervision contracts and suppliers
    ▪	Ensures that Contractor carries out his work according to the contract
    ▪	Ensures that Contractor carries out his work according to the contract
    ▪	Coordinating all the subcontractor activity ( plumbing, HVAC, electrical, heating, sewage works)
    ▪	On site management of quality, H&S, sub-contractors and direct staff
    ▪	Directing and issuing instructions to Assistants / Foreman
    ▪	Tracking works on site
    ▪	Establish procedures for solve  non-conformities
    ▪	Training of subordinate staff
    ▪	Teaching on time and with minimum costs of the works
    ▪	Quality assurance work
    ▪	Compliance with work safety and environmental protection

  • iunie 2011 - aprilie 2012

    Sef Santier, SARL FERMOBOIS Chaniers

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    - Conceptia si elaborarea  proiecte 
    - Stabilirea necesarului de materiale si forta de munca
    - Planificarea lucrarilor 
    -Organizarea santierului, deplasarea fortei de munca, asigurarea conditiilor de cazare 
    -Coordonarea tehnica si organizatorica a muncitorilor 
    - Comunicarea intre beneficiar, patronat si muncitori
    - Rezolvarea problemelor si situatiilor conflictuale aparute 
    - Incadrarea in planul de timp si costuri

  • martie 2003 - mai 2011

    Sef Baza Productie, SC ROMCONSTRUCT SA

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    Responsabilitati:
    - Stabilirea si omologarea procedeelor de sudare
    - Pregatirea si autorizarea ISCIR a sudorilor
    -Supravegherea si supervizarea bunei executii
    -Stabilirea solutiilor tehnice si tehnologiilor de lucru si modificarea acestora in cazul in care se impune
    -Respectarea normelor si standelor de executie, asigurarea calitatii.
    -Intocmirea necesarului de materiale si forta de munca. Intocmirea curbelor de progres si a evolutie fortei de munca. Stabilitea fazelor si subfazelor lucrarii, intocmirea graficelor Gantt si estimarea investitiei.
    -Corelarea activitatilor in vederea stabilirii masurilor necesare incadrarii proiectelor in bugetele alocate si in termenele de executie stabilite;
    -Selectarea, analiza si negocierea ofertelor pentru contractele de furnizare servicii (subantreprenori) si materiale pentru proiectul de constructie si urmarirea acestora pe toata perioada de derulare a lucrarilor ;
    -Implicarea directa in problemele ce pot aparea in relatia cu beneficiarul si propune solutii de rezolvare a acestora.
    Realizari:
    Am realizat o sala de sport cu 150 locuri , cu 7 lacatusi si trei sudori in 4 luni, 105 tone confectie metalica. Am facut economii de 10% din bugetul alocat.
    Structura metalica, instalatii termice si climatizare Depozit valori Peles, Sala sport Peris
    Istalatia alimentare cu apa cupor sticla ISOVER
    Instalatia tehnologica racire utilaje si cuptor sticla Isover inclusiv statia de pompare si schimbatoarele de caldura, instalatie aer 6 bar
    

  • iunie 1998 - februarie 2003

    Sef Santier Instalatii, SC ROMCONSTRUCT SA

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    Responsabilitati:Participarea la licitatii, intocmirea documentatii licitatii, urmarirea productie, organizarea si programarea lucrarilor de instalatii.
    Coordonarea maistrilor si sefilor de echipa. Responsabil tehnic cu sudura, pregatirea si autorizarea sudorilor. Intocmirea graficelor de urmarire a lucrarilor si incadrarea in bugetele alocate.
    Realizari:Lucrari noi: Sediul Comisariatului Militar Prahova, Sediul Parchetului Ploiesti, Sediul Petrom Ploiesti, Depozit Petrotrans Buzau, Vile pe Vale Prahovei si in Jud. Prahova , posta Campina.
    Lucrari de restaurare monumente istorice: Colegiul National  I.L. Caragiale Ploiesti, Colegiul National  Mihai Viteazu  Ploiesti, Casa  Angela Georgescu  Targoviste, Casa Camarasiei Slanic Prahova
    Lucrari reabilitare: spitalul Urlati, spitalul Baicoi, turnul de televiziune Costila, Liceul Comarnic, Sediul Romtelecom Ploiesti, posta Predeal, posta Gaiesti
    

  • mai 1992 - mai 1998

    Director tehnic, SC PACT SRL IASI

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    Responsabilitati: Coordonarea si urmarirea urmatoarelor tiputi de lucrari:
    Executie luvrari instalatii interioare,
    Executie retele de apa, gaz, produse petroliere, aer comprinat din teava de cupru si inox
    Montaj utilaje centrale termice, statii pompare apa, statii epurare apa, statii de benzina.
    Realizari: Reabilitarea Leaganului de copii nr 1 Botosani, reabilitarea Casie de copii nr. 1 Botosani, Reabilitarea Casei de copii nr 1 Iasi, Atelier prelucrari mecanice-lucrare noua, IAS Albesti , jud Botosani, Instalatii termice, electrice, sanitare blocuri de locuinta Constanta.
    Reabilitarea Sc, gen nr 8 Vaslui, Sediul Directiei de Drumuri Judetene Vaslui-lucrare noua, Instalatii de iluminat exterior Republica Bucuresti.
    Beneficii:Masina
    

Educatie

  • 1978 - 1983

    Master / studii postuniversitare, Universitatea Tehnica " GH ASACHI "

    • Filiași, România

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Mediu
Franceza
Mediu
Romana
Nativ
80%
  • Last update: 21 iul.
  • Reference number: 14497

Experience

  • December 2013 - April 2014

    Maintenance engineer, PAKEEZA DAIRIES Ltd , Rochdale UK

    • «Alt oraș», Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Reponsabilities:
     Supporting day to day maintenance.
     Working on conveyors, tanks, ovens, packaging equipment
     Maintenance, breakdown and repairs.
     Boiler work, replacing steam traps and valves 
     heating and hot water bundles, pumps, motors 
     Fault finding on mechanical systems including HVAC 
     1st line repairs of plant including changing filters, pumps, belts, motors etc.
     Planned Preventative Maintenance of all building services plant and dealing with breakdowns reactively
    

  • February 2013 - November 2013

    Technical engineer, SC ROMCONSTRUCT GROUP SRL

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

    Reponsabilities:
    Planning execution: graphics and schedules, materials bids, manpower quantity
    Editing reports for: status of the project, offset evidence, consuming evidence
    Evaluation of neccesary manpower and materials
    Price calculation
    Prepare documentation for tenderings

  • June 2012 - February 2013

    Self employed , Hatfield UK

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

     Domestic Gas, Commercial Catering Gas, Domestic Electrical, Commercial and Industrial Electrical, Fire Detection and Alarm Systems
    Reponsabilities:
    - On site management of quality, H&S, sub-contractors and direct staff
    - Directing and issuing instructions to Assistants / Foreman
    - Short-term programmes
    - Material call offs
    - Chairing client progress meetings
    

  • June 2011 - April 2012

    Site manager, SARL FERMOBOIS CHANIERS

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

    - Design and preparation of the project
    - Establishing the necessary manpower and materials
    - Planing 
    -Management of Site Team
    -Coordination of Site Team activities
    -Coordinates, where required, contractor’s site activities
    -Ensures that Contractor carries out his work according to the contract
    -Ensures safety and quality of work carried out
    -Ensures Contractor remains within the time schedule and contract cost
    -Concentrates his actions exclusively on site and site related activities
    

  • March 2003 - May 2011

    Supervisor engineer, SC ROMCONSTRUCT SA PLOIESTI

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

      Reponsabilities:
    - Steel structures execution, execution metal confections, assembling metal structures.
    - Piping supervizor
    - Establishment and approval of welding procedures
    - Preparation and approval of welders ISCIR (Romanian Authority for welders authorization)
    -Monitoring and supervising the proper execution, including welding
    - Execution of technological plant such as stations glass oven cooling plant, air compression glass  plant,  treatment oven cooling mineral wool plant.
    - Execution of oil and petroleum products pipeline, gas pipeline, water pipeline
    - Defines and follows up the project schedule respecting the budget, Preparing the necessary materials and labor. Drawing curves and evolutionary progress of labor. Defines project’s tasks and  subtasks, Gantt charts and estimating the investment.
    - Formalises the technical notes and commercial propositions in reply to the calls for tender to be treated, eventually supported by a team which he(she) has expressly formed for this purpose,
    - Establishes the original estimate detailed budget concerning the utilisation of the means and material required to accomplish the project, updates and follows up this budget on a monthly basis,
    - Is responsible for the selection of any sub-contractors that he(she) may need to call on, in the respect of the established procedures,
    - Is in charge of both the internal (cost control department) and external (client interface) aspects of the budgetary control of the project.
    - Edited reports for: status of work. Results obtained, profit obtained
    -Technical issues solving
    -Reassuring  that reglemantation and standards are appropriately applied.
    
    
    Accomplishments:
    -Increase the profit of the company monthly.
    -Leading a team of 42 people.
    -I participated in large projects like gasoline distribution station PETROTRANS, cooling and cullet pipeline IZOVER Romania,  the rebilitation of the interior metal joinery and steel structure for Odeon theater in Bucharest, assembling the interior and exterior steel structure for the sports hall with 250 seats, Paltinoasa county Suceava, execution of metal structure for Peles Castle, Sinaia. 
    

  • November 2003 - September 2006

    Comercial Manager, SC ROMCONSTRUCT SA , Ploiesti

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

    Reponsabilities:
    - Managing the Aquisition, Marketig and Secondary production departments.
    - Negociation and signing the contracts with company suppliers.
    - Prepare the documentation for FARE financing –construction equipments.
    - Supervision contracts and suppliers
    Accomplishments:
    Modernisation of Joinery workshop for slaty wood.
    

  • February 2003 - October 2003

    Head of Technical Burreau – instalatio, SC ROMCONSTRUCT SA , Ploiesti

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

    Reponsabilities:
    Designed execution graphics and schedules
    Editing reports for: status of the project, offset evidence, consuming evidence
    Evaluation of neccesary manpower and materials
    Price calculation
    

  • June 1998 - February 2003

    Site Manager , SC ROMCONSTRUCT SA , Ploiesti

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

    Reponsabilities:
    Manages and coordinates Site Team activities efficiently so as to reach above described objectives.
    Maintains relations with the Contractor so that interactions between Owner's Site Team and Contractor's site teams function smoothly .
    Coordinates and stays informed regarding contractor’s site activities
    Keeps himself informed on all safety aspects including Romconstruct Group Safety policies and cleanliness on site (housekeeping)
    Anticipates problems and actions of the contractor
    Resolves conflicts
    Heads internal Site Team meetings
    Lead meetings with the contractors site team (construction and safety)
    Keeps himself and his team informed with regards to arrival of equipment and interrelates with Resident Engineer regarding this aspect
    Keeps the Project Manager informed
    Supervising installation process
    Edited reports for: status of work. Results obtained, profit obtained
    Technical issues solving
    Reassuring  that reglemantation and standards are appropriately applied.
    Accomplishments:
    Petrom headquarters - Implementation of the new protection against fire system according to European norms
    Rehabilitation of Romtelecom Ploiesti Office
    Stirom Bucharest - Automatization of the heating system of the no. 3 oven, process assisted by a computer
    National College “Mihai Viteazul” -  Execution of new electrical, thermal and sanitary installations 
    Rehabilitation of National College “IL Caragiale”, Ploiesti
    Rehabilitation of Comarnic High School
    Office of Court of Appeals Ploiesti - Mounting thermal central 1 Gcal
    Rehabilitation of the County Council Office in Prahova - Assembling a Electrogen Group of 110 kVA, Execution of electrical, thermal and sanitary installations.
    

  • May 1992 - May 1998

    Technical Manager, SC PACT S.R.L., Iasi

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

    Reponsabilities:
    Oversee the production process, cheking the work progress
    Designed execution graphics
    Coordonated the activity of team leaders
    Solving technical and designed problems
    Qulity control and Reassuring  that reglemantation and standards are appropriately applied.
    Preparing the technical documentation
    Coordination tracking and executions following types of works:
    Execute interior installations
    Execution of oil pipeline
    Execution of water pipeline
    Execution gas pipeline
    Heating equipment installation
    Water pump stations
    
    Accomplishments:
    Rehabilitation oh 2 orphanages
    Execution of electrical, thermal and sanitary installations for 7 new blocks of flats
    

  • April 1986 - April 1992

    Scientific Researcher –Project designer, CCSITUCD-MITECO SA, Iasi

    • «Alt oraș», Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Reponsabilities:
    Elaboration all the documentation for designing the prototype and series production for:
    Accomplishments:
    Compacting machine shaker for escarpment 7 TF. It was the first machinery of this kind
    designed and manufactured in Romania.
    Compacting machine shaker for escarpment 2.5 TF
    Compacting machine shaker with wheels 8 T
    

  • August 1983 - September 1986

    Manufactoring engineer, SC FORTUS SA, Iasi

    • «Alt oraș», Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Reponsabilities:
    Responsible for tracking and achieving component parts and assemblies produced
    Responsible for assembling technology
    Change mounting technology, devices and design tools
    Accomplishments:
    Construction equipment, metallurgical equipment
    Turbines power plants
    Electric centrifugal pumps
    Execution autogenous mills and ball diameter of 8000 mm
    Execution mud pumps oil industry
    

Education

  • 1978 - 1983

    Master's degree, Technical University “Gh Asaki” , Mechanics

    • Filiași, Romania

Skills

Driving license
  • B

Foreign languages

English
Intermediate
French
Intermediate
Romanian
Native