15262

PIPEFITTER at ERSAI, kAZACKSTAN

  • România, Fetești
  • România, Fetești
  • Romania, Fetești
  • Romania, Fetești
Deblocheaza date contact
Traduceri ale CV-ului
25%
  • Ultima actualizare: 06.10.2011
  • Numar referinta: 15262

Limbi straine

Engleza
Incepator
Italiana
Mediu
Rusa
Mediu
Romana
Nativ
75%
  • Last update: 06.10.2011
  • Reference number: 15262

Experience

  • October 2013 - October 2014

    PIPEFITTER, ERSAI, kAZACKSTAN

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries,Industries / Production / Manufacturing

    : -pipe preparing duties like cutting, blunting the edges for welding, the pipe support system construction,installing the valves, and other monitoring and control equipment. Most of the assembly was made by welding and/or flanges (I was responsible with the the flanges assembly).The maximum diameters of the pipes that I worked with were 1200mm (48 inches),and varying thickness
    -Pipe Lines, Pipe Supports, Seal Plates, Valves, Pumps, Instrumentations
    

  • November 2012 - April 2013

    Pipefitter, PICCINI ITALY

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    :- Select type and sizes of pipe and other related materials and equipments;
    - Actual measuring, pipe cutting beveling and fit-up of pipe spool and fittings;
    - Layout, assembles, install, erect pipe spool and maintain pipe system and pipe supports;
    - Applying knowledge of system operation and following design plan;
    - Isometric analysis, location determination of spools for installing, erection and fit-up;
    - Threads pipe using pipe threading machine, bends pipe using bending machine;
    - line checking to determine the incomplete fittings and supports;
    - Plan installations to avoid obstructions and interferring the activities of other workers;
    - Follow HSE safety rules and company regulations;
    - Performs other duties as assigned.
    

  • March 2012 - August 2012

    Pipefitter, Caspian Marine Services

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    - carbon steel pipes systems installation - 2-16", pipes supports;
    -pipe preparing duties like cutting, blunting the edges for welding, the pipe support system construction,installing the valves, and other monitoring and control equipment. Most of the assembly was made by welding and/or flanges (I was responsible with the the flanges assembly).The maximum diameters of the pipes that I worked with were 1200mm (48 inches),and varying thickness.
    

  • June 2010 - February 2012

    Pipefitter, IREM

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    Preparing and installing the oil and gas transport lines according to the technical diagram.
    By preparing I mean: pipe preparing duties like cutting, blunting the edges for welding,
    the pipe support system construction, installing the valves, and other monitoring and
    control equipment some of them electronically controlled and adjusted . Most of the assembly was made by welding and/or flanges (i was responsible with the the flanges assembly).
    

  • April 2009 - May 2010

    Pipefitter, Nuclearmontaj

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    -Pipe Lines, Pipe Supports, Seal Plates, Valves, Pumps, Instrumentations
     -Heat Exchangers (Heaters, Coolers, Vaporizers, Condensers), Pressurizers, Pressure Vessels, Tanks, Separators
    

  • August 2008 - October 2008

    Pipefitter, SICMI SRL

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    -Pipe Lines, Pipe Supports, Seal Plates, Valves, Pumps, Instrumentations

  • January 2006 - May 2008

    Pipefitter, SICIM

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Preparing and installing the oil and gas transport lines according to the technical diagram.
    By preparing I mean: pipe preparing duties like cutting, blunting the edges for welding,
    the pipe support system construction, installing the valves, and other monitoring and
    control equipment some of them electronically controlled and adjusted . 
    Most of the assembly was made by welding and/or flanges (i was responsible with the 
    the flanges assembly).
    The maximum diameters of the pipes that I worked with were 100 inches, and varying
    thickness.
    

  • January 1983 - January 2006

    Pipefitter, Nuclearmontaj

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Preparing and installing the oil and gas transport lines according to the technical diagram.
    By preparing I mean: pipe preparing duties like cutting, blunting the edges for welding,
    the pipe support system construction, installing the valves, and other monitoring and
    control equipment some of them electronically controlled and adjusted . Most of the assembly was made by welding and/or flanges (i was responsible with the the flanges assembly).
    

  • January 2004 - November 2005

    Pipefitter, Nuclearmontaj

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    - carbon steel pipes systems installation - 2-24" + tick wall tube + alloyed and high-alloy steel, stainless steel pipes systems installation - 1/2-10", pipes supports, boiler components installation;

  • November 1998 - April 1999

    Pipefitter, SOIMI ABB

    • Fetești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    - carbon steel pipes systems installation - 2-16", pipes supports;
    -pipe preparing duties like cutting, blunting the edges for welding, the pipe support system construction,installing the valves, and other monitoring and control equipment. Most of the assembly was made by welding and/or flanges (I was responsible with the the flanges assembly).The maximum diameters of the pipes that I worked with were 1200mm (48 inches),and varying thickness.
    

Education

  • 1974 - 1978

    Highschool, Liceul Industrial nr. 1

    • Medgidia, Romania

Foreign languages

English
Beginner
Italian
Intermediate
Russian
Intermediate
Romanian
Native