159190

- at Looking new opportunity

  • România, Medgidia
  • România, Medgidia
  • Romania, Medgidia
  • Romania, Medgidia
Deblocheaza date contact
Traduceri ale CV-ului
35%
  • Ultima actualizare: 30 mai.
  • Numar referinta: 159190

Obiectiv profesional


                            

  • Abroad
  • Full time
  • Domeniile urmariteInginerie Constructii, Inginerie Electrica / Mecanica, Inginerie Industrii / Productie
  • Disponibilitate deplasare in interes de serviciuPana la 100% din program
  • Disponibilitate relocareIn tara si in strainatate

Aptitudini

Permis de conducere
  • B
  • Capacitate de a munci in echipa
  • Spirit practic
  • Putere de organizare si disciplina

Limbi straine

Romana
Avansat
Rusa
Mediu
95%
  • Last update: 30 mai.
  • Reference number: 159190

Career goals

To get a job

  • Abroad
  • Full time
  • Wanted work domainsEngineering Construction, Engineering Electrical / Mechanical, Engineering Industries / Production / Manufacturing
  • Availability for work related travelUp to 100% of the schedule
  • Willing to relocateIn the country and abroad

Experience

  • January 2016 - May 2016

    -, Looking new opportunity

    • Any, England
    • Full time
    • Work domain - Engineering: Research and development,Construction,Electrical / Mechanical,Energy / Extractive Industries,Industries / Production / Manufacturing

  • September 2013 - July 2015

    Senior Instrument Engineer, ENERECO-Qatar

    • Doha, Qatar
    • Full time
    • Work domain - Engineering: Research and development,Electrical / Mechanical

    Activities:  FEED and Detailed design for Miscellaneous Company 
                     Projects:
    Projects Involved:
    •    Engineering Design Services for the for Erbil Refinery, KAR V 
            (new gasoline plant), Kurdistan, Northern Iraq; New Control 
             System(DCS,ESD) – Emerson Delta V
    •   FEED and detailed design for Miscellaneous PCR (Plant Change
            Request ) within Mesaieed field, Qatar, (QP Refinery and Gas
             Plant), and issuing EPIC and SOW package for Tender.
    •   FEED and Detailed design for  NJABA Oil Field Process Facilities 
           for AMAZON ENERGY LIMITED Nigeria
    •   Detailed design for  PHOENIX – Park 18 and associated oil wells
          for PETROM Oil Company
    •   FEED and detailed design for  Miscellaneous PCR (Plant Change
           Request) and SOR (Statement of Requirement)  within Dukhan
           fields (Recycling Gas Plants) for Qatar Petroleum and issuing
           EPIC and SOW package for Tender.   
    •   Detailed Design for Crude Oil Pipelines, Gas Pipelines and Crude
           Oil Pumping Station for the Erbil Refinery (40,000 b/d) in 
           Northern Iraq.
    •   Engineering Design Services for the Offsite Engineering Works for
          Erbil Refinery, 40,000 B/D Expansion Project (Oil Tanks Farm),
          Northern Iraq.
    •   Engineering Design Services for the for Erbil Refinery, 40,000 B/D
          Expansion Project, Northern Iraq; Addendum II Additional 
          Activities: Design of LPG Storage Facilities, Interconnecting Pipe 
           rack, interfacing with power plant, pumping operation philosophy, 
           new control building, fire-fighting system (foam), medium voltage 
           power distribution

  • February 2011 - April 2012

    Senior Instrument Engineer, TECHINT CORPORATION

    • Escravos Island, Nigeria
    • Full time
    • Work domain - Engineering: QA (Quality Assurance),Construction,Electrical / Mechanical,Industries / Production / Manufacturing

    Project – EGTL1 – (Escravos Gas To Liquids) - ESCRAVOS ISLAND - NIGERIA                           
     Activities:  All related site engineering activities including:
            - Site design modification as per process requirements and to 
               support Construction and QA/QC teams in handover to client. 
            - Crosscheck between vendor documentation and plant design
               and solving discrepancy.
            - Updating logic diagrams and adding new signals according 
               with new process requirements.            
            - Providing technical assistance to other disciplines as required
            - Carrying all assigned work are in compliance with agreed 
               budget, schedule and applicable standards.

  • March 2009 - December 2010

    Senior Instr. Eng and E&IC Turnover Engineer E, TECHINT CORPORATION

    • Damietta, Egypt
    • Full time
    • Work domain - Engineering: QA (Quality Assurance),Construction,Electrical / Mechanical,Energy / Extractive Industries,Industries / Production / Manufacturing

    Project – EMETHANEX DAMIETTA 1 – Methanol Plant Damietta - EGYPT                          
             Position – Instrument engineer & E&I Turnover systems Engineer. 
                  Activities: - All related site engineering activities including: 
                      - Site design modification as per process requirements.
                      - Issuing Quality Control Document Index (TOSTR-).
                      -  Defining Turnover Systems and issuing P&ID with systems mark-up.
                      - Follow-up E&I loops (DCS, SIS, ESD, PMS, F&G) and as per status, issuing corrective actions
                        if necessary (changes of loop diagrams, I/O schedule, cause and effect diagrams) to handover
                        to client as per contract schedule.
                      - Crosscheck between vendor documentation and plant design and solving discrepancy.
                      - Updating logic diagrams and adding new signals according with new process requirements .
                      - Participating in HAZID and HAZOP meetings and solving issues.
                      - Providing technical assistance to other disciplines as required
                     - Generation of Cause & Effect Diagrams, Control Philosophies in liaison with Process and 
                        Safety Discipline engineers
                     - Resolve technical queries and ensure the resolution is satisfactory and ensure that all design changes
                         are captured by the change control process
                       - Providing input to project planning as part of the project team for achieving the target and
                       completion within the budget and schedule; ensuring that all engineering work is carried out in 
                       accordance with priorities and schedules as set out in the project plan.
                     - Plan, budget and coordinate resources, contribute to the development of plans, schedules and 
                       estimates for the individual work scopes. Preparation of engineering and construction scope for
                       both man-hours and equipment estimates where necessary. 
                     - Review and report job progress and cost reports regarding engineering activities

Education

  • 1985 - 1991

    Bachelor's degree, Polytechnic Institute Bucharest

    • Electronics
    • București, Romania

Skills

Driving license
  • B
  • Ability to work in team
  • Practical spirit
  • Organization skills

Foreign languages

Romanian
Advanced
Russian
Intermediate