18

Welding Engineer/Supervisor at ENI GROUP - SAIPEM SpA

  • România, Arad
  • România, Arad
  • Romania, Arad
  • Romania, Arad
Deblocheaza date contact
Traduceri ale CV-ului
25%
  • Ultima actualizare: 15.03.2011
  • Numar referinta: 18

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Avansat
Franceza
Mediu
Italiana
Mediu
Romana
Nativ
75%
  • Last update: 15.03.2011
  • Reference number: 18

Experience

  • March 2004 - Present

    Welding Engineer/Supervisor, ENI GROUP - SAIPEM SpA

    • Arad, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries,Industries / Production / Manufacturing

    2010
    Position: Welding Engineer/Supervisor
    Site Offshore: Pipe laying vessel Saibos FDS – J Lay  
    Projects: GEP BLK17 – Total Angola – pipe laying of 16’’ 20,8mm thickness - SWS Automatic GMAW (2G & 6Gposition) and SWS Automatic GMAW + Presto Automatic GMAW (5G position)
    
    
    2009-2010
    Position: Welding Engineer/Supervisor
    Site Offshore: Pipe laying vessel Saibos FDS – J Lay  
    Projects: Urugua Project – Petrobras – pipe laying of 18’’ (19,1 22,2 and 25,4mm thickness) SWS Automatic GMAW (2G position) and SWS Automatic GMAW + Presto Automatic GMAW (5G position)
    
    2008-2009  
    Position: Welding Engineer/Supervisor
    Site Offshore: Pipe laying vessel Saibos FDS – J Lay  
    Projects:
    -	AKPO Field Development Project Nigeria – TOTAL – pipe laying of 10” and 12” (24.7 and 25 mm), riser carbon steel welding (STT+Presto Automatic GMAW+ SAW in 1G position and STT+Presto Aut GMAW in 2G position) and riser clad welding (STT+Presto Automatic GMAW in 1G position  and Automatic TIG in 2G position)
    
    2007  
    Position: Welding Engineer/Supervisor
    Site Offshore: Pipe laying vessel Saibos FDS – J Lay  
    Projects: 
    -	BURULLUS Egypt – TOTAL – pipe laying of 10.75” (12,7mm thickness)  - Presto  automatic GMAW welding  (2G+5G) plus SMAW + FCAW processes as repair procedures and tie-ins ( 5G and 2G positions).
    -	GGP Angola – TOTAL Angola – pipe laying of 12.5” (16,3mm thickness)  - Presto  automatic GMAW welding  plus SMAW + FCAW processes as repair procedures and tie-ins ( 5G and 2G positions).
    -	MARIMBA North Tieback EPC3 Project – Esso Exploration Angola – pipe laying of 10” (14.3mm thickness) and pipe in pipe 10”+16” (17.5mm thickness) - Presto  automatic GMAW welding (5G – fire line and 2G J lay tower)  plus SMAW + FCAW processes as repair procedures ( 5G and 2G positions).
    -	AKPO Gas Export (Phase 2) – TOTAL Nigeria – pipe laying of 16” (14.2, 16.6, 17.5 and 19.1 mm thickness) - Presto  automatic GMAW welding (5G, 6G and 2G positions)  plus SMAW + FCAW processes as repair procedures ( 5G position).
    Site Onshore: Saipem ONNE Port Harcourt
    Project:
    -	 AKPO UFR – TOTAL Nigeria – double joint welding, various diameter, various thickness, various materials, clad pipes.)
    In charge of: All welding activities from welders’ qualification to production welding.
    
    2006
    Position: Welding Engineer/Supervisor
    Site Offshore: Pipe laying vessels Saibos FDS – J Lay  & Saibos Barge S355 - S Lay
    Projects: 
    -	AKPO Gas Export (Phase 1) – TOTAL Nigeria – pipe laying of 16” (14.6, 16.1 and 19.1 mm thickness) - Vermaat  automatic GMAW welding (5G position) plus SMAW + FCAW processes as repair procedures ( 5G positions) and riser installation.  
    -	ROSA LIRIO – TOTAL Angola – laying of 8.3”(pipe in pipe) - Vermaat  automatic GMAW welding (5G position) and PRESTO automatic GMAW welding (2G position) plus SMAW + FCAW processes as repair procedures (2G and 5G positions).
    In charge of: Responsible of all activities related to welding on-board.
    
    2005   
    Position: Welding Engineer/Supervisor
    Site Offshore: Pipe laying vessel Saibos S 355 – S Lay
    Project: 
    -	WEST ESPOIR – Ivory Coast – CNR International – qualifications: Croatia Rijeka  +  S Lay S 355, 6”, 10”, 12” pipe diameter - Vermaat  automatic GMAW system and SMAW + GMAW processes as repair procedures. Anodes Installation, pin brazing.
    In charge of: Responsible of all activities related to welding in lab and on-board.
    
    2004
    Position: Welding Engineer/Supervisor
    Site Offshore: Pipe laying vessel Saibos S 355 – S Lay
    Project: 
    -	EAST AREA EPC2 – Exxon Mobil Nigeria – qualifications: Cortemaggiore Italy – S Lay S 355, 4”, 18”, 20” and 36” pipe by using the SMAW process and Vermaat automatic GMAW system and  riser installation of all these diameters (SMAW + FCAW). Piggyback 4”/36”	
    In charge of: Responsible of all activities related to welding in laboratory and on-board.
    
    Site Onshore: Cortemaggiore Italy - Saipem Welding Laboratory
    Project: 
    -	BP RHUM - North Sea – qualifications: Cortemaggiore Italy – S Lay – Presto automatic welding)
    -	Training with Presto automatic GMAW system
    

  • March 2003 - March 2004

    Quality Assurance Engineer, SC FECNE SA Bucuresti

    • Arad, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    In charge of: 
    	- Internal and external AUDIT
    	- Quality plan review
    	- Control and Work Procedures review 
    	- Route sheet review
    - Generation of the files for factory authorization from: ISCIR, ASME, TUV, ISO 9001, CNCAN (Romanian Commission for the Control of Nuclear Activities) etc
    - Formulation and revision of Quality Assurance Manuals according to NRAC AQ-04 (Republican 	Norm for Quality Assurance in the nuclear field on Romania’s territory), ASME Code(Sect I and VIII 	Div 1), ISO 9001:2000
    - Review of the execution drawings and technical documents from a quality assurance standpoint.
    

  • August 2001 - March 2003

    Welding Engineer Technologist, SC KVAERNER FECNE SA

    • Arad, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    In charge of: 
    	- PQR qualification
    	- Welders qualification
    	- Technical documentation realization (WPS, PQR, Working Technical Instruction, Welding 	procedures) for different products
    	- Production plan
    	During this period I’ve worked with:
    - a diversity of execution codes used in manufacturing progress (ISCIR - Romanian Inspection for the 	Control of for Boilers and Under Pressure vessels, ASME, EN, Germanischer LLoyd, Werkstoffblat),
    	- material diversity (carbon steel, stainless steel, duplex etc.),
    	-  welding process diversity (SMAW, GMAW, GTAW, G-FCAW, SAW),
    - a diversity of manufactured products including pressure vessels, nuclear power plant equipment and different types of welding structures
    

Education

  • 1996 - 2001

    Bachelor's degree, Universitatea Politehnica Bucuresti

    • București, Romania

Skills

Driving license
  • B

Foreign languages

English
Advanced
French
Intermediate
Italian
Intermediate
Romanian
Native