21660

Project Manager at SC ROMSTRADE SRL

  • România, București
  • România, București
  • Romania, București
  • Romania, București
Deblocheaza date contact
Traduceri ale CV-ului
25%
  • Ultima actualizare: 20.02.2012
  • Numar referinta: 21660

Aptitudini

Permis de conducere
  • A
  • B

Limbi straine

Engleza
Avansat
Franceza
Incepator
Italiana
Incepator
Romana
Nativ
75%
  • Last update: 20.02.2012
  • Reference number: 21660

Experience

  • November 2011 - January 2012

    Project Manager, SC ROMSTRADE SRL

    • București, Romania
    • Full time
    • Work domain - Technicians: Construction

    Management of Design and Build Contracts, responsible for:
    -	Elaboration of Management Plans
    -	Contract maintenance and change control
    -	Charges and cost monitoring
    -	Design team coordination 
    -	Work progress control
    -	Updating of Work Program and Cash Flow 
    

  • May 2008 - April 2011

    DIRECTOR , CNADNR

    • București, Romania
    • Full time
    • Work domain - Office jobs: Administrative

    Responsible for administration of contracts reached for  implementation of motorway projects financed by International Financial Institutes (BEI, BERD), European Union (Cohesion Funds) and Romanian Government, as following: 
    a)	Design and Build Contract (Yellow FIDIC):
    1.	Constanta Bypass - Contract in amount of 437 mil RON (equivalent of 121 mil EUR) with 36 months (2008 – 2011), consisting in design and execution of 22 km length of motorway with 2X2 carriageway, 26 structures and 5 interchanges. 
    2.	Cernavoda – Medgidia Motorway Contract in amount of 634 mil RON (equivalent of 176 mil EUR), 24 months  consisting in design and execution of 20 km length of motorway with 2X2 carriageway and 12 structures. 
    3.	Medgidia – Constanta Motorway Contract in amount of 596 mil RON (equivalent of 165 mil EUR) consisting in design and execution of 31 km length of motorway with 2X2 carriageway, 7 structures and 1 interchange.
    4.	Arad Bypass Contract in amount of 428 mil RON (equivalent of 120 mil EUR), consisting 12 km length of motorway with 2X2 carriageway, 6 main structures and 3 interchanges.
    b)	Work Contract (Red FIDIC):
    5.	Arad – Timisoara Motorway in amount of 482 mil RON (equivalent of 135 mil EUR), representing by execution of 32 km length of motorway with 2X2 carriageway and 25 structures.
    c)	Consultancy Contract:
    6.	Constanta Bypass, contract in amount of 6.6 mil EUR, with activities of design, procurement and supervision.
    7.	Arad – Timisoara – Lugoj Motorway, contract in amount of 10.2 mil EUR with activities of design, procurement and supervision.
    Main activities:
    -	Contract maintenance and change control 
    -	Managing the relationship between parties
    -	Charges and cost monitoring
    -	Statement verification and interim payment certificate analyses 
    -	Budget control 
    -	Design scrutiny
    -	Works control
    -	Consultancy activities control 
    -	Contractor claims and variation orders analyses and defense responses
    -	Client claim groundwork 
    -	Daily correspondence under the contracts provisions
    -	Management reporting
    

  • November 2007 - April 2008

    DIRECTOR , HILL INTERNATIONAL

    • București, Romania
    • Full time
    • Work domain - Finance: Management

    Responsible for administration of Consultancy contract for “Rehabilitation of national road DN15 - between Reghin - Toplita and national road DN12 between Toplita – Chichis” signed with Romanian National Company of Motorways and National Roads. The Contract involves the rehabilitation and upgrading of 227 km of national roads and comprises feasibility and environmental studies, design, land acquisition, construction, works supervision and commissioning. 
    The main activities was the coordination of design activities and sound engineering judgment in the area of road and infrastructure design, such as: the design of paving works, extension of drainage infrastructure and other necessary works such as retaining walls, ditches, drains, earthworks, rehabilitation of access roads, traffic calming and for rehabilitation of bridges was undertaken varying from minor repairs to full replacement.. 
    In particular the main activity was to prepare feasibility studies and environmental studies, preliminary designs including geotechnical and topographical surveys.]
    

  • September 2003 - October 2007

    DIRECTOR/DIRECTOR Adj, CNADNR

    • București, Romania
    • Full time
    • Work domain - Office jobs: Administrative

    A)	Responsible for administration of Consultancy contract for: 
    -	Arad – Timisoara – Lugoj (Feasability Study, Environmental Impact Study and Preliminary Design during the years of 2006 - 2007)
    -	Cernavoda – Constanta Motorway (Feasibility Study and Environmental Impact Study on 2005 year) 
    -	Bypass Constanta (Feasibility Study and Environmental Impact Study on 2005 year)
    B)	Support for negociation of financial contracts with European Investment Bank and European Bank for Reconstruction and Development for implementation of Cernavoda – Constanta Motorway Project and Bypass Constanta Project on 2005 year.
    C)	Member of Technical Comitee for negociation of PPP Contracts for Bucharest – Ploiesti Motorway, Comarnic – Brasov Motorway and Bucharest Ring Road (motorway cross section) (on 2004 year)
    D)	Responsible for contract administration of :
    -	Bucharest – Drajna Motorway with the length of  97 km, project divided on 3 sections (during the years of 2000 – 2004), with 3 works contracts (Red FIDIC) and 3 consultancy contracts (design, procurement and supervision)
    -	Bypass Pitesti with 15 km length (2004 – 2007) implemented through work contract (Red FIDIC)
    
    Main activities:
    -	contract maintenance and change control,
    -	charges and cost monitoring, 
    -	ordering and payment under the contracts provisions, 
    -	statement verification, 
    -	management reporting, 
    -	work progress control assessing through the initial Work Program and the updated Work Program and Cash Flow , 
    -	reviews of business continuity plan, 
    -	managing claims and disputes,
    -	managing the relationship between parties (client, consultant, contractor, bank and govern representatives),
    -	sound engineering judgment in the area of road and infrastructure design and execution, 
    -	coordination of infrastructure design work ensuring that the projects and design are completed on time and on budget, compliance with the appropriate technical standards and QA, EMS and OH&S requirements.
    

  • July 1999 - September 2003

    Sef Serviciu / Inginer, CNADNR

    • București, Romania
    • Full time
    • Work domain - Office jobs: Administrative

    Main activities:
    -	contract maintenance and change control,
    -	charges and cost monitoring, 
    -	ordering and payment under the contracts provisions, 
    -	statement verification, 
    -	management reporting, 
    -	work progress control assessing through the initial Work Program and the updated Work Program and Cash Flow , 
    -	reviews of business continuity plan, 
    -	managing claims and disputes,
    -	managing the relationship between parties (client, consultant, contractor, bank and govern representatives),
    -	sound engineering judgment in the area of road and infrastructure design and execution, 
    -	coordination of infrastructure design work ensuring that the projects and design are completed on time and on budget, compliance with the appropriate technical standards and QA, EMS and OH&S requirements.
    

Education

  • 2011 - 2011

    Postdoctorate, Romanian Ministry of Labour, Family and Social Protection Romanian Ministry of Education, Research and Youth European Project Consulting

    • București, Romania
  • 2009 - 2009

    Postdoctorate, Ministry of Transport, Public Works and Water Management - The Nederland’s Royal Haskoning Ministry of Transport, Public Ministry of Transport, Public Works and Water Management - The Nederland’s Royal Haskoning

    • «Alt oraș», Romania
  • 1989 - 2004

    Bachelor's degree, Universitatea de Constructii Bucuresti

    • București, Romania
  • 2002 - 2002

    Postdoctorate, WS Atkins International

    • Roman, Romania

Skills

Driving license
  • A
  • B

Foreign languages

English
Advanced
French
Beginner
Italian
Beginner
Romanian
Native