22928

Senior Electrical Technician Commissioning Specialist la PETROFAC UAE

  • România, Onești
  • România, Onești
  • Romania, Onești
  • Romania, Onești
Deblocheaza date contact
Traduceri ale CV-ului
100%
  • Ultima actualizare: 27.06.2015
  • Numar referinta: 22928

Obiectiv profesional

New job!

  • Strainatate
  • Project based
  • Salariul dorit5000 €
  • Domeniile urmariteInginerie Electrica / Mecanica
  • Disponibilitate deplasare in interes de serviciuPana la 100% din program
  • Disponibilitate relocareIn tara si in strainatate

Experienta

  • februarie 2015 - Prezent

    Senior Electrical Technician Commissioning Specialist, PETROFAC UAE

    • Gdansk, Polonia
    • Project based
    • Domeniu - Inginerie: Calitate,Electrica / Mecanica

    Period:                       February 2015 – Present
    Position:                    Senior Electrical Technician Commissioning Specialist
    Company&Location: Petrofac- Greater Stella Platform-Gdansk/Poland
    Responsibilities:
    -Performed visual inspection & pre-commissioning for: motors, power cables, gas turbine motor, emergency generator, sea water pump, air compressors.
    -Performed inspection and pre-commissioning before energize the following electrical equipment such as: transformers, un-interruptible power supply (UPS), MCC (Motor Control Center), normal and emergency lighting, small power distribution board for completion ITR's type A to be sure all electrical equipments & systems are operated safely in compliance with safety standard and regulatory documents as per commissioning requirements and procedures.
    -Assist the Electrical & Instrument Manager for planning development and reporting liaise with construction/mechanical completion groups on a daily basis.
    -Perform visual inspection and punch list of all the remaining construction works that cannot be completed in the yard and to be included in the Hook-Up phase and carry over work packages.
    -Commissioning of switchgear functional test, testing of CT & VT.
    -Contact resistance test and interlock test.
    -Motor run test and verify protection according to motor data. 
    -Insulation Resistance Test for motors and L.V cables. Energization of distribution boards for lighting and socket outlet.
    -For power transformers:  Winding Resistance Measurement; Insulation Resistance Test; Ratio and Vector Group Test; Measurement of no load loss and current (Open circuit test); Tests on on-load tap-changer.
    -High Pot Test for High Voltage cables.
    -Reviewing commissioning procedures and implementing changes where required.
    -Final drafting of Mechanical Completion Dossier&Commissioning Dossier, coordinating punch lists & ensuring that all information was recorded for final handover to operations.

  • ianuarie 2013 - decembrie 2013

    QA/QC Electrical & Instrument Inspector, Eni-Saipem Italy

    • București, România
    • Project based
    • Domeniu - Inginerie: Calitate,Electrica / Mecanica,Energie / Industrii extractive,Industrii / Productie

    Period:                            January 2013 – December 2013
    Position:                         QA/QC - E&I Inspector
    Company & Location:    Eni-Saipem- UAE Shah Gas Development Package 5
    Responsibilities:
     QA/QC- supervision & Quality control during construction & Installation, responsible and familiarized with the job specifications, review all documentation associated with Electrical Installation, including Inspection &Test Plans (ITP), Procedures, Method Statements, Vendor Documentation, and Maintenance &Operations Manuals and to survey the work of Subcontractor is done as per standards and specifications.
    -Implementing coverage of proper installation, wiring and cable laying, cladding, termination, witnessing of insulation resistance test and hipot test.
    -Coordinate and assist construction to resolve any encountered problems related to inspection and testing activities to meet schedule and avoid any delay of activities.
    -Prepare internal punch list and coordinate with the construction prior for inspection.
    -Coordinate with the client for punch list closure and final acceptance.
    -Checking of single line diagram, engineering specification, material specification.
    -Inspection of power lighting fixtures, earthing cables, earthing bus-bar, junction box, lightning protection system.
    -Inspection of installation for pole lights, area lights, emergency and normal lights.
    -Inspection and testing (insulation and continuity) of LV; HV; Data and Fiber Optic cables.
    -Inspection of CCTV system, Access control system, Optical and sound warning system.
    -Test & draw out position, even incoming & Bus-tie circuit breakers shall be electrically interlocked.
    -Participate in Walk Down for the completed system.

  • august 2012 - noiembrie 2012

    Electrical Technician, Tozzi Sud Spa

    • Onești, România
    • Project based
    • Domeniu - Inginerie: Industrii / Productie

    Period                           August 2012-November 2012
    Position:                        Electrical Technician
    Company& Location: Tozzi Sud Spa- Ravenna, Italy (West Franklin and             Elgin project)
    Responsibilities:
    
    Electrical connections in Technical Equipment Room:
    -Connecting power cables in HVAC heaters panel.
    -Connecting instrumentation cables in F&G marshalling cabinets.
    -Connecting cables in field electrical and instrumentation JB.
    -Electrical connections for local control stations.
    -Connecting speakers for PA-GA system.
    -Connecting ESD push buttons.
    - Pulling dressing and tagging cables.
    -Installing Roxtec penetrations in panels and walls penetrations.
    -Glanding cables (Hawke glands).
    Electrical connections for field instruments such as:
    -Temperature transmitters.
    - Pressure transmitters.
    - Actuators.
    - Electrovalves.
    -Electrical connections for LV electrical engines (including heaters and thermistors).
    -Installations of Thermon trace heating system.

  • august 2010 - octombrie 2011

    Electrical Supervisor, Techint Cimi_Montubi Nigeria Ltd

    • București, România
    • Project based
    • Domeniu - Inginerie: Industrii / Productie

    1 August 2010- 31 October 2011- CONSTRUCTION-GTL PROJECT (Gas to Liquid) - Electrical Supervisor - Electrical Construction:
    
    I have  worked in Nigeria, client Chevron- U.S.A. and Southern Gas Company Nigeria, contractor Techint Cimi_Montubi Nigeria Ltd as Electrical Supervisor specialist in the execution of electrical installations.
      Here I have led 3 teams with 6-10 local workers each with which we have executed: 
    Team 1 worked - for cable trays; electrical circuits for normal lighting and emergency ; installing, connection and checking smoke detectors by stations and substation; erection and installing device for high mast lighting pole.
     Team 2 worked :performed 3M joints for cable terminals ; Installing and connection batteries in battery room; installing infrared device for medium and high voltage panels; installing and connection junction box; installing, connection and checking electrical equipment's by station (panels, drawers, switches) ; different cables glands  for the stations and substations.
    Team 3 worked: Installing power transformers, installing Bus-duct ; connection bus bar inside of Bus-duct ;grounding; installing and connections for over 25 cathodic protection transformers ; realization of grid for cathodes protections around and inside the area; pulling cables.

  • ianuarie 2009 - octombrie 2009

    QA/QC E&I Inspector, IREM Italy

    • Onești, România
    • Project based
    • Domeniu - Inginerie: Calitate,Electrica / Mecanica

    ADRIATIC LNG project- IREM- Italy platform- January-October 2009- QA/QC-E&I Inspector:
    
    QA/QC- supervision & Quality control during construction & Installation, responsibility to Electrical Inspection for ITP (Inspection and Test Plan), 
    Single line diagram, engineering specification, material specification.
    -All electrical components (cables, fuses, terminals, contactors, push buttons, relays, etc) must be clearly identified, and all component such as switchgear, protection relays, shall be marked with their main. 
    -Junction Boxes, earthing system, LV cables, cable ladder/trays, miscellaneous electrical equipment, switchgear mechanical interlocking ; integral facility of the switchgear to inhibit incorrect operation of the circuit breaker, padlock facilities for maintenance safety shall be provided with mechanical key interlock.
    - Earthing connectors to incomers, bus bar & feeder circuits, interlock, lockable, bus-bar shutters shall be provided prevent incorrect or unsafe operation & prevent to access to live parts, & all withdrawble lock parts shall be lockable in the plug-in.
    - Test & draw out position, even incoming & Bus-tie circuit breakers shall be electrically interlocked.
    - Anti-vibration, fiber optic cables, performed/verified, installation and inspections as per P&ID, instrument data sheet & layout, schematic diagram.
    -Inspection at: JB termination, cables schedule, function Test, pressure safety valves, UPS-System, Fire & Gas devices, fusible Plug loop Leak Test, Emergency Shutdown System.

  • februarie 2007 - decembrie 2008

    Electrical Technician Specialist Gas Turbine, Petrochemical Plant Borzesti/Romania

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Electrica / Mecanica,Industrii / Productie

    Period:       January 2007- January 2009
    Position:    Electrical Technician- Operating and Maintenance- Gas turbine 
    Company&Location:  Petrochemical Plant –Borzesti- Romania
     Responsibilities:
    
    - Erection, start up and maintenance for Cogeneration Power Plant:
    -Installation of power and control cables (MV/LV), cable tray, Raychem glands and terminals.
    -Cable connections in switchboards, junction boxes and electrical engines terminal boxes.
    -Completing current and voltage loops between MV cubicles.
    -Installation of MV and LV Merlin Gerin cubicles.
    -Installations of trace heating, junction boxes and terminals for Raychem trace heating system.
    -installation of lighting circuits (normal, Ex and emergency) and small power outlets
    -Testing the continuity and insulation resistance of MV/LV cables,    bus bars, electrical engines and transformers.
    Operating a 9MVA Taurus T70 CED-Solonox Caterpillar Solar Turbine USA turbo-generator set-Maintenance and operation of electrical equipment such as:
    -Taurus 70 gas turbine- Solar Turbines;
    -Gas compressor (screw type) 136kw- Enerproject;
    -2 Air compressors (screw type) 7kw- Atlas Copco;
    -Three-phase synchronous electric generator, LSA BMBL13 type, 9000KVA/6300v;
    -HV step-up transformer TTUS-FS (OFAF) 40MVA 110/6 KV;
    -MV step-down transformer TTU-ONAN 1000KVA 6/0,4 KV;
    -Three-phase oil immersed transformer (France-Schneider) 800 KVA,6/0,4 KV;
    -HV oil circuit breakers with oleo-pneumatical release (110 KV);
    -MV switchgears 17, 5 KV (MC Set- Merlin Gerin);
    -6KV withdrawable circuit breakers (SF6 type) – Merlin Gerin;
    -6KV withdrawable circuit breakers (vacuum type) – ABB;
    -Maintaining and monitoring the operational efficiency of all electrical equipments to ensure optimum performance and carrying out remedial works.
    -Shutdown operations whenever necessary for periodical maintenance.
    -Recording parameters data.

  • februarie 2000 - ianuarie 2007

    Electrical Techncian Power Transformer Station 110KV/6KV, Petrochemical Plant Borzesti/Romania

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Electrica / Mecanica,Industrii / Productie

    2000-2007- Petrochemical Plant-Borzesti-Romania: Electrical Technician- Operating and Maintenance- High Voltage equipments 6 and 110 KV (day and night shift):
     Works of operating high voltage electrical equipment in an electrical power transformer station 110kv/6kv-SRA1 Petrochemical Plant Borzesti; perform maneuvers with electrical 110kv high voltage, power transformers 40MVA and 63MVA, switches 110KV with MOP devices (oleo-pneumatic mechanism), line separators on air 110kv power lines, related rigging equipment with electric medium voltage  withdrawable circuits breakers 6KV on departures from sections bar, on electrical transformer station 110KV/6KV-SRA1 Petrochemical Plant-Borzesti-Romania.

  • mai 1988 - ianuarie 2000

    Electrical Technician Low Voltage Station 0.4KV, Petrochemical Plant Borzesti/Romania

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Electrica / Mecanica,Industrii / Productie

    1988-2000- Petrochemical Plant Borzesti-Romania: Electrical Technician- Operating and Maintenance-Low Voltage equipments (day and night shift) :
    
    - Within this period l have worked in many plants within this company such as Soda M, Mercury electrolysis plant, Liquid Chlorine, Hydrochloric acid.
    - My duty was to perform the following services:
    -repairs, maintenance and operation of electrical motors of low and high voltage and HVAC equipments. 
    - Maintenance of roads lightning inside and outside the company location.
    - Due to the fact that the operation of the company takes place in a corrosive environment, I have also replaced the cable trays. 
    - I have performed erection and installation of switchboards for different types of electrical motors. 
    - I have worked in different plants with three – phase sockets and 220V sockets, switches, different types of lightning fixtures, transformers and welding machines.
    - being a chemical plant I have worked a lot in explosive medium with anti – ex equipment ,ventilation systems ,acoustic and optic warning devices for detection of gases within respective area.
    - Maintenance of low voltage stations and of main switchboards.
    - I was involved in major overhauling on each of the plants, consisting on: checking the sealing of motors, bearings clearance, bearings greasing, push buttons force and triggering cables, painting motors.
    -I have performed installation of switchboards for motors remote control with thermal relays, contactors, star-delta motor starters.

  • aprilie 1985 - mai 1988

    Electrician, Petrochemical Plant Borzesti/Romania

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Electrica / Mecanica,Industrii / Productie

    1985-1986: Petrochemical Plant Borzesti-Romania-works of electrical maintenance and repairs on high-voltage (110 KV) equipment’s in: 
    -Refinery- RAFO S.A.BORZESTI- Romania.
    -Rubber Plant- CAROM S.A.BORZESTI- Romania.
    -Petrochemical Plant- CHIMCOMPLEX S.A. BORZESTI- Romania.

Educatie

  • 1987 - 1990

    Colegiu / studii postliceale, High School

    • Electrotehnica
    • Bacău, România
  • 1983 - 1985

    Liceu / scoala profesionala, High School

    • Electrotehnica
    • Bacău, România

Aptitudini

Permis de conducere
  • B
  • Capacitate de a munci in echipa
  • Adaptare rapida la un grup nou

Bun specialist

Limbi straine

Engleza
Avansat
Franceza
Mediu
Romana
Nativ
90%
  • Last update: 27.06.2015
  • Reference number: 22928

Career goals


                            

  • Strainatate
  • Project based
  • Salary wanted5000 €
  • Wanted work domainsEngineering Electrical / Mechanical
  • Availability for work related travelUp to 100% of the schedule
  • Willing to relocateIn the country and abroad

Experience

  • January 2013 - December 2013

    QA/QC -Electrical Inspector, Eni-Saipem-Italy

    • București, Romania
    • Project based
    • Work domain - Engineering: QA (Quality Assurance),Electrical / Mechanical,Energy / Extractive Industries,Industries / Production / Manufacturing

    •Period: 	       January 2013 – December 2013
    Position: 	       QA/QC - E&I  Inspector
    Company & Location:      Eni-Saipem- UAE Shah Gas Package 5
    Responsibilities: QA/QC- supervision & Quality control during construction & Installation, responsible and familiarized with the job specifications, review all documentation associated with Electrical Installation , including Inspection &Test Plans(ITP), Procedures, Method Statements, Vendor Documentation , Maintenance &Operations Manuals and to survey the work of Subcontractor is done as per standards and specifications.
    -Implementing coverage of proper installation, wiring and cable laying, cladding, termination, witnessing of insulation resistance test and hipot test.
    -Coordinate and assist construction to resolve any encountered problems related to inspection and testing activities to meet schedule and avoid any delay of activities.
    -Prepare internal punch list and coordinate with the construction prior for inspection.
    -Coordinate with the client for punch list closure and final acceptance.
    -Checking of single line diagram, engineering specification, material specification.
    -Inspection of power lighting fixtures, earthing cables, earthing bus-bar, junction box, lightning protection system.
    -Inspection of installation for pole lights, area lights, emergency and normal lights.
    -Inspection and testing (insulation and continuity) of LV, Data and Fiber Optic cables.
    -Inspection of CCTV system, Access control system, Optical and sound warning system.
    -Test & draw out position, even incoming & Bus-tie circuit breakers shall be electrically interlocked.
    -Participate in Walk Down for the completed system.

  • August 2012 - November 2012

    Electrical Technician, Tozzi Sud Spa-Ravenna-Italy

    • Onești, Romania
    • Project based
    • Work domain - Engineering: Industries / Production / Manufacturing

    •Period: 	  August 2012 – November 2012
    Position: 	  Electrical Technician
    Company&Location: West Franklin project,Tozzi Sud -Ravenna
    Responsibilities: 
    -  Electrical connections in Technical Equipment Room.
     -  Connecting power cables in HVAC heaters panel.
    - Connecting instrumentation cables in ABB-F&G marshaling cabinets.
    -  Connecting cables in field electrical and instrumentation JB.
    -  Electrical connections for local control stations.
    -  Connecting speakers for PA-GA systems.
    -  Connecting ESD push buttons.
    -  Pulling dressing and tagging cables .
    -  Installing Roxtec penetrations in panels and walls   penetrations.
    -  Gliding cables with Hawke glands.

  • August 2010 - October 2011

    Electrical Supervisor- Specialist-Electrical Construction, TECHINT CIMI_MONTUBI \NIGERIA Ltd

    • București, Romania
    • Project based
    • Work domain - Engineering: Industries / Production / Manufacturing

    •1 August 2010- 31 October 2011- CONSTRUCTION-GTL PROJECT (Gas to Liquid) - Electrical Supervisor & Electrical Technician - Electrical Construction:
    I have  worked in Nigeria, client Chevron- U.S.A. and Southern Gas Company Nigeria, contractor Techint Cimi_Montubi Nigeria Ltd as  Electrical Technician &Electrical Supervisor specialist in the execution of electrical installations.
      Here I have led 3 teams with 6-10 local workers each with which we have executed: 
    Team 1 worked - for cable trays; electrical circuits for normal lighting and emergency ; installing, connection and checking smoke detectors by stations and substation; erection and installing device for high mast lighting pole.
     Team 2 worked :performed 3M joints for cable terminals ; Installing and connection batteries in battery room; installing infrared device for medium and high voltage panels; installing and connection junction box; installing, connection and checking electrical equipment's by station (panels, drawers, switches) ; different cables glands  for the stations and substations.
    Team 3 worked: Installing power transformers, installing Bus-duct ; connection bus bar inside of Bus-duct ;grounding; installing and connections for over 25 cathodic protection transformers ; realization of grid for cathodes protections around and inside the area; pulling cables.

  • January 2009 - October 2009

    QA/QC Electrical Inspector, AKER Solutions

    • Onești, Romania
    • Project based
    • Work domain - Engineering: QA (Quality Assurance),Electrical / Mechanical

    •ADRIATIC LNG project- AKER Solutions Italy platform-January-October 2009-QA/QC-E&I Inspector:
    QA/QC- supervision & Quality control during construction & Installation, responsibility to Electrical Inspection for ITP(Inspection and Test Plan), 
    Single line diagram, engineering specification, material specification.
    -All electrical component (cables, fuses, terminals, contactors, push buttons, relays, etc) must be clearly identified, and all component such as switchgear, protection relays, shall be marked with their main. 
    -Junction Boxes, earthing system, LV cables, cable ladder/trays, miscellaneous electrical equipment, switchgear mechanical interlocking ; integral facility of the switchgear to inhibit incorrect operation of the circuit breaker, padlock facilities for maintenance safety shall be provided with mechanical key interlock.
    - Earthing connectors to incomers, bus bar & feeder circuits, interlock, lockable, bus-bar shutters shall be provided prevent incorrect or unsafe operation & prevent to access to live parts, & all withdrawble lock parts shall be lockable in the plug-in.
    - Test & draw out position, even incoming & Bus-tie circuit breakers shall be electrically interlocked.
    - Anti-vibration, fiber optic cables, performed/verified, installation and inspections as per P&ID, instrument data sheet & layout, schematic diagram.
    -Inspection at:JB termination, cables schedule, function Test, pressure safety valves, UPS-System, Fire & Gas devices, fusible Plug loop Leak Test, Emergency Shut Down System.

  • February 2007 - December 2008

    Electrical Technician Specialist-Gas Turbine T70CED-Solonox, S.C. CHIMCOMPLEX S.A. BORZESTI

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Electrical / Mechanical,Industries / Production / Manufacturing

    •2007-2008-CHIMCOMPLEX S.A. BORZESTI :Electrical Technician - Operating Gas Turbine-Turbo Mach(day and night shift)  - after upgrading work station processing 110KV/6KV-SRA1 CHIMCOMPLEX SA Borzesti, I was chosen to work electrical technician on a new plant to produce electricity(active energy-8MWh and reactive energy-4MVARh ) and steam(12 to 25 tones per hour) in the cogeneration system with gas turbine on TURBOMACHENERGYSYSTEMS(Switzerland) with turbine type Taurus T 70-CED-SOLONOX-CATERPILLAR SOLAR TURBINES  U.S.A.
              The whole process of producing electricity and steam , also the operating system that controls the startup of gas turbine and maneuvers performed with the electrical equipment of medium voltage 6 KV- Schneider Electrical and Merlin Gerrine Electrical is controlled by computer with operating program SCADA.
    Here I work on shift- maintenance with new electrical equipments:
    -MV-Switchgears 17,5KV(MC-SET- Schneider).
    -6KV-Withrawable circuit  breakers(SF6-sulphurhexafluoride)-Merlin Gerrine.
    -6KV-Withrawable circuit  breakers(vacuum)-ABB.
    -Sepam 40 control relays- Schneider.
    -ABB REF 542 plus-control relays.
    - Gas compressor 136 KW-Enerproject.
    - 2 air compressors 7KW- Atlas Corps.
    -Power Logic 800-Network analyzer - Merlin Gerrine.
    -PLC- Siemens Simatic S7.
    -Profibus nods- Beckhoff Automation AG.
    -Power Flex 40 Static frequency converter for AC motors-Allen Bradley.
    -Flex Pak 3000 Static converter for DC motors-Reliance Electric.
    -UPS system:-PSS 18-110V and PSS 30-24 V for battery chargers.
    -PSS 327-110V for Rectifier.
               Before this, I’m working with Turbo Mach technicians at : erection, precommissioning,  commissioning and start-up for this gas turbine:
    -I  installed power and control cables, low and medium voltage.
    -I  installed cables trays.
    -I performed Raychem joints and terminals.
    -I   connected  the cables in: switchboards, junction boxes and in electrical engines terminals boxes.
    -I installed LV and MV Merlin Gerrine cubicles.
    -I installed heating-trace and I connected  those in junction boxes and terminals for Raychem heating-trace system.
    - I installed and I connected lighting circuits(normal,EX, and emergency).
    -I performed tests of continuity and insulation resistance for: low and medium voltage cable,busbars, electrical engines, motors , transformers.

  • February 2000 - January 2007

    Electrical Technician-Power Transformer Station 110 KV/6KV, S.C. CHIMCOMPLEX S.A. BORZESTI

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Electrical / Mechanical,Industries / Production / Manufacturing

    •2000-2008-CHIMCOMPLEX S.A. BORZESTI : Electrical Technician-maintenance (day and night shift) - works of operating high voltage electrical equipment in an electrical power transformer station 110kv/6kv-SRA1 CHIMCOMPLEX S.A BORZESTI; perform maneuvers with electrical 110kv high voltage, power transformers 40MVA and 63MVA, switches 110KV with MOP devices (oleo-pneumatic mechanism), line separators on air 110kv power lines, related rigging equipment with electric medium voltage  withdrawable circuits breakers 6KV on departures from sections bar,on electrical transformer station 110KV/6KV-SRA1 CHIMCOMPLEX S.A. BORZESTI.

  • May 1988 - January 2000

    Electrical Technician Low Voltage Station, S.C. CHIMCOMPLEX S.A. BORZESTI

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Electrical / Mechanical,Industries / Production / Manufacturing

    •1988-2000-CHIMCOMPLEX S.A. BORZESTI :Electrical Technician- Operating Low Voltage equipments(day and night shift) :
    - within this period l have worked in many plants within this company such as : Soda M , Mercury electrolysis plant , day and night shifts ;
    - my duty was to perform the following services :
    -repairs , maintenance and operation of electrical motors of low and high voltage and HVAC equipments. 
    - maintenance of roads lightning Inside and outside the company location.
    - due to the fact that the operation of the company take place in a corrosive environment , I have also replaced the cable trays. 
    - I have performed erection and installation of switchboards for different types of electrical motors. 
    - I have worked in different plants with three – phase sockets and 220V sockets , switches, different types of lightning fixtures ,transformers and welding machines .
    - being a chemical plant I have worked a lot in explosive medium with anti – ex equipment ,ventilation systems ,acoustic and optic warning devices for detection of gases within respective area.
    - maintenance of low voltage stations and of main switchboards.
    - I was involved in major overhauling on each of the plants , consisting on : checking the sealing of motors , bearings clearance , bearings greasing , push buttons force and triggering cables , painting motors.
    -I have performed installation of switchboards for motors remote control with thermal relays, contactors, star-delta motor starters.

  • April 1985 - May 1988

    Electrical Technician, S.C. CHIMCOMPLEX S.A. BORZESTI

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Electrical / Mechanical,Industries / Production / Manufacturing

    •1985-1888:  Romania- works of maintenance and repairs on high-voltage(110 KV) equipment in RAFO S.A. BORZESTI , CAROM S.A. BORZESTI , CHIMCOMPLEX S.A. BORZESTI.

Education

  • 1987 - 1990

    College, High School Petru Poni

    • Electrical
    • Bacău, Romania
  • 1983 - 1985

    Highschool, High School Petru Poni

    • Electrical
    • Bacău, Romania

Skills

Driving license
  • B
  • Communication skills
  • Ability to work in team
  • Interpersonal skills

Foreign languages

English
Advanced
French
Intermediate
Romanian
Native