2646

Mechanical Engineer at Daewoo Mangalia Heavy Industries

  • România, Mangalia
  • România, Mangalia
  • Romania, Mangalia
  • Romania, Mangalia
Deblocheaza date contact
Traduceri ale CV-ului
30%
  • Ultima actualizare: 24.06.2011
  • Numar referinta: 2646

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Avansat
Romana
Nativ
80%
  • Last update: 24.06.2011
  • Reference number: 2646

Experience

  • June 2007 - Present

    Mechanical Engineer, Daewoo Mangalia Heavy Industries

    • Mangalia, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    03 November 2008 - present 
    Engineer (Quality Control Inspector) - Quality Control Hull Section – Quality Management Division
    - Inspected works are promoted on production to required quality level;
    - Continuous improvement of inspection activity through knowledge of Class/Owner requirements and shipbuilding practice;
    - Ensure information circulation related to inspection results inside of Quality Management Division and to the Production;
    - Know and follow Quality Management System documents ( Quality Manual, system procedures and administrative procedures transmitted to Quality Control Section );
    - Know, follow-up and development Quality Management System;
    - Identification of nonconformities as early as possible through patrol inspection and through study of drawings;
    - Establish of control items: study of technical documentation/contract specification, review of documentation for ship just build, proposal for inspection plan;
    - Review of drawings: to be correct, complete, easy to read and correlated, valid revisions, keeping place;
    - Random checking during inspection, welders name for that work and send information to Welding Engineering Section;
    - Checking of foreman self-inspection.
    Daewoo Mangalia Heavy Industries 
    Mangalia, Romania, 
    Shipyard - New Constructions
    
    
    
    
    16 February 2008 - 01 November 2008 
    Engineer - Operational & Innovation Department, New Shipbuilding Outdoor Division
    - Receive the technical documentation, recording them in accordance with the procedures in force, operation on previous reviews and their distribution to the senior foreman;
    - Study received technical documentation and make the sorting schedule properly;
    - Ensuring links between departments and other divisions to resolve problems appeared in the production process;
    - Following schedule of works and inform superiors about the failure to START and FINISH date;
    - Verification and correction of non-conformity reports made up by subcontractors;
    - Participation in meetings organized by hierarchical superiors;
    - Propose sanction for the foreman of the departments when established acts of indiscipline;
    - Check the progress of work and inform superiors of any schedule delay.
    Daewoo Mangalia Heavy Industries 
    Mangalia, Romania, 
    Shipyard - New Constructions
    
    
    16 November 2007 - 15 February 2008 
    Engineer - Erection Department, New Shipbuilding Outdoor Division
    - Daily monitoring and keeping records on the computer of the assembled sections which leave the Indoor Division and Painting Division;
    - Tracking daily progress of works on site, in order to draw up a monthly schedule of preerection / assembly;
    - Tracking daily and weekly progress of projects in progress;
    - Daily tracking results of inspections QA / QC, class, client;
    - Tracking the progress of works during the assembly and painting;
    - Prepare monthly schedule pre-erection and assembly;
    - Knowledge, compliance and enforcement requirements of the Management System of Quality ISO 9001/2000;
    Daewoo Mangalia Heavy Industries 
    Mangalia, Romania, 
    Shipyard - New Constructions
    
    
    11 July 2007 - 15 November 2007 
    Engineer - Ship Repair Division
    - Inspections, tests and surveys; 
    - Service plans, sequence and methods; 
    - Work standards ;
    - Deliveries and service from suppliers and sub-contractors; 
    - Shop floor drawings, project documentation and as-built drawings; 
    - Assignment of work to foremen/teams, including contract specification, drawings, scope of work, work instructions, specifications and codes as agreed in the contract;
    
    - Approval and assistance in preparation of bill of material requisitions, tools, equipment and machinery requirements for mobilization;
    - Provide technical advice to repair teams; 
    - Develop and implement engineering details like process planning sheets, drawings, etc.; 
    - Completion and submission of all required documentation to support the repair activities including damage reports, repair procedures, quality tests and results, completion reports, additional work reports etc.;
    - Interpretation of contracts/class rules/international standards for the department; 
    - Cooperation with other departments within the Company to resolve operational and/or administrative problem;
    
    Daewoo Mangalia Heavy Industries 
    Mangalia, Romania, 
    Shipyard - New Constructions
    New Buildings:
    •	Hull No. 1045 – “IAN M” – for Taskos Shipping Trading SA;
    •	Hull No. 1046 – “STELLA” – for Taskos Shipping Trading SA;
    •	Hull No. 1052 – “CPO AMERICA” – for Claus-Peter Offen Shipping;
    •	Hull No. 4082 – “CPO ALICANTE” – for Claus-Peter Offen Shipping;
    •	Hull No. 4083 – “CPO BARCELONA” – for Claus-Peter Offen Shipping;
    •	Hull No. 4084 – “CPO BILBAO” – for Claus-Peter Offen Shipping;
    •	Hull No. 4085 – “CPO CADIZ” – for Claus-Peter Offen Shipping;
    •	Hull No. 4086 – “CPO VALENCIA” – for Claus-Peter Offen Shipping;
    •	Hull No. 4087 – “CPO VIGO” – for Claus-Peter Offen Shipping;
    •	Hull No. 4075 – “APL QATAR” – for NSB Niederelbe Schiffahrtsgesellschaft mbH & Co. KG;
    •	Hull No. 4073 – “APL OMAN” – for NSB Niederelbe Schiffahrtsgesellschaft mbH & Co. KG;
    •	Hull No. 4071 – “RIO MEDEIRA” – for Hamburg Sudamerikanische Dampfschiffahrts Gesellschaft KG;
    •	Hull No. 4070 – “RIO BRAVO” – for Hamburg Sudamerikanische Dampfschiffahrts Gesellschaft KG;
    •	Hull No. 4069 – “RIO BLANCO” – for Hamburg Sudamerikanische Dampfschiffahrts Gesellschaft KG;
    •	Hull No. 4066 – “MONTE AZUL” – for Hamburg Sudamerikanische Dampfschiffahrts Gesellschaft KG;
    •	Hull No. 4065 – “MSC NURIA” – for Mediterranean Shipping Company;
    •	Hull No. 4064 – “MSC CARMEN” – for Mediterranean Shipping Company;
    •	Hull No. 4063 – “MSC CORDOBA” – for  Mediterranean Shipping Company.
    
     Shiprepairs:
    •	“HEADWIG OLDENDORFF” – Bulk carrier;
    •	“TEBESSA” – RO-RO;
    •	“BIO BIO” – Bulk carrier;
    •	“GENMAR ALEXANDRA” – Tanker;
    •	“GENMAR CONSTANTINE” – Tanker;
    •	“SICILIA BREEZE” – Bulk carrier.
    

Education

  • 2002 - 2007

    Bachelor's degree, Ovidius University

    • Constanța, Romania

Skills

Driving license
  • B

Foreign languages

English
Advanced
Romanian
Native