28504

electrician tehnician at tozzi kazakhstan

  • România, Cernavoda
  • România, Cernavoda
  • Romania, Cernavoda
  • Romania, Cernavoda
Deblocheaza date contact
Traduceri ale CV-ului
30%
  • Ultima actualizare: 24.06.2014
  • Numar referinta: 28504

Limbi straine

Engleza
Mediu
Franceza
Mediu
Italiana
Mediu
Romana
Nativ
80%
  • Last update: 24.06.2014
  • Reference number: 28504

Experience

  • January 2012 - Present

    electrician tehnician, tozzi kazakhstan

    • Cernavoda, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    conexiuni tablouri .normal rom,hvac rom,transformator rom,instrument rom.pua.

  • April 2013 - July 2013

    INSPECTOR QA/QC INSTRUMENTATION, SC.ACTIVE RESURSE COMPANY -SC.FASE ITALY

    • Cernavoda, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Engineering E&I, Procurement Service and Commissioning.
    Assistance o the West Franklin & Elginb Project.
    - Inspection and testing of the instrumentation cables, electrical and instrumentation
    inspection and testing cable insulation, continuity testing using the low test low
    voltage test equipment prior to MEGGER test.
    - Check cable as specified in the cable project schedule;
    - Check if the relevant documents are at their latest revision;
    - Check if the cable is routed in accordance with the cable layout drawings;
    - Check the cable for ant physical damage;
    - Check if the cable is adequately supported and correctly fixed, according to the
    project specification.
    - Check if the bending radius is within the specified limits;
    - Check if the cable is correctly loomed and isolated in accordance with the
    specification;
    - Check if the cable labelling is in accordance with the specification;
    - Check if the glands, shrouds, MCTU and earthing are in accordance with the
    specification;
    - Check if the gland plate for single core cable is non ferrous.

  • June 2012 - November 2012

    RIG ELECTRICIAN, CASPIAN MARINE SERVICES

    • Cernavoda, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Rig-up and Commissioning of the drilling Rig 5947 and associated systems on the
    EPC04 Artificial Island of the Kashagan filed in the Caspian Sea Kazakhstan.
    Pulling instrumentation and power cables, connection of the junction boxes mounted
    and connected power panels and equipment: lighting ring, gas sensors H2S, CH4,
    speakers, flame detectors, cameras, telephones, motors and pumps, alarm button inside and outside

  • January 2012 - May 2012

    E&I Technician, TOZZI Kazakhstan

    • Cernavoda, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Fire detection and gas detection circuits
    Mounting and connections for the distribution of the panels for the WI-FI systems
    Wiring of the electrical panel terminations for the power cable;
    Electrical equipments construction, electrical automation panel, connections socket
    and lighting circuits
    Modification of AC-DC-UPS RELAY
    Modification of power cable instrument room, HVAC room, normal room,
    transformer room, equipment earthing connection cabinets, connecting electrical box

  • January 2009 - January 2011

    Electrician, ANB CONSULTING GEMMO SPA Italy

    • Cernavoda, Romania
    • Full time
    • Work domain - Technicians: Construction

    Connection of the electrical panels, interior and exterior lighting systems
    - Installation and connection of sockets, switches, coil, ambient sound and monophase
    motors, fire detectors, fire alarms.
    - Installation and repair instrumentation system and devices;
    - Executing the main cable tray routes and installing power and control cable
    tray from the link field instruments to the junction boxes to process interface
    building.
    - Pulling laying and dressing secondary and main cables for instruments and fire
    and gas detectors
    - Grounding, termination and connection for fields instruments and control
    panels;
    - Installing cables for electrical substation (to the substation and into the
    substation basements) medium voltage cable connection sections 30mm-300mm

  • March 2007 - January 2009

    Electrician, ANB Consulting

    • Cernavoda, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    WANZE Refinery plant; exterior lighting- mounted lamps, 24V transformers,
    cable trays, pulling cables, 230 V – 380 V motors connected.
    - Alarm sirens- mounted devices, plugging electrical panels.
    - Heating and auxiliaries’ equipment of heating installation.
    - Grounding using HAWKE cables glands for the electrical and instrumentation
    cables.
    - Performing of the cable connection in electrical and instrumentation panels.
    - Performing of the cable termination for the instrumentation and low voltage
    electrical cables (230V-400V -6000V).
    - Installing of lighting circuits including junction boxes lighting fixtures .Execution of cable trays for cable puling cables.

Education

  • 1990 - 1992

    Highschool, grup scolar electroenergetic cernavoda

    • Cernavoda, Romania

Foreign languages

English
Intermediate
French
Intermediate
Italian
Intermediate
Romanian
Native