Experience

  • November 2010 - April 2012

    Piping supervisor, AREVA-France,Nuclear Power Plant,Olkiluoto,Finland

    • Pitești, Romania
    • Full time
    • Work domain - Technicians: Workers

    -monitoring and supervision piping installations,small bore and big bore,performed by pipe subcontractor(BHR-Germany);
    -cheching that the works are performed with the project and procedures reqirements and required quqlity level;
    -tracking resolve non conformities(NCR);
    -ttacking implementation of ''Field Change Requests''(FCR);
    -permanenent monitoring of subcontractors in respect of safety rules,walls protection,floors and equipments protection;
    -permanent monitoring of cleanliness in assigned buildings.

  • May 2009 - June 2010

    Piping supervisor, IMUC-SA Pitesti,Romania

    • Pitești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    -monitoring and supervison piping fabrication and piping supports fabrication;
    -elaboration of QC documents for the activities above specified;

  • April 2008 - March 2009

    Piping supervisor, Technip-Italy,YANSAB Olefins Plant in the Red Sea industrial zone of Yanbu(Saudi Arabia)

    • Pitești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    -interface between Technip and pipe subcontractor,IREM-Italy;
    -supervision installation of small bore and large bore lines above ground;
    -punch lists editing;
    -coordination reinstatement activities after hydraulic tests(29 people,including 2 piping foremans);
    -checking that the works are performed with the project requrements and required quality level.

  • July 2007 - February 2008

    Piping Supervisor, IGS-SICIM Italy,EPC Utility Project,Atyrau,Kazkhstan

    • Pitești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries,Industries / Production / Manufacturing

    Piping activities within ''Technical Departament:
    -spooling of isometric drawings and elaboration of cutting sheets for piping fabrication(above 10,000dwgs.);
    -elaboration bills of materials for piping fabrication and piping erection;
    -monitoring and supervision piping fabrication within workshop.

  • June 2005 - March 2006

    Piping supervisor, SK Engineering Company(South of Korea),Arpechim-SA Pitesti,Hydrotreating Vacuum Distilate Project

    • Pitești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    -interface between contractor and pipe subcontractor IMUC-SA Pitesti;
    -supervision piping installations,small bore and large bore;
    -punch lists editing;
    -supervision tracer installations;
    -supervison all piping hydrotests;
    -post-hydrotests packs follow-up;

  • September 2003 - June 2005

    Piping supervisor, ALJABER GRINAKER LTA,Ruwais,United Arab Emirates,Unleaded Gasoline/Low sulphur gas oil Project

    • Pitești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    -coordination piping activities of teams(foremans,pipe fitters,welders);
    -daily progress reporting on piping erection activities;
    -coordination test packs completion;
    -ensuring that the piping erection activities are carried out to the schedule and highest HSE standards.

  • June 2002 - September 2003

    Piping Supervisor, IMUC-SA Pitesti,Romania

    • Pitești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    -Coordination piping and piping supports fabrication carried out in the company worksop for various projects all over Romania.

  • October 2000 - May 2002

    Piping Foreman, Kharafi National and Mideast Constructors,Qatar-Gas,Sulphur Recovery Expansion Project

    • Pitești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    -coordination piping fabrication activities carried out in thework-shop;
    -coordination activities of teams(pipe fitters,welders)on piping erection activities;
    -daily progress reporting in respect of piping activities;
    -ensuring that the piping fabrication and installation activities are carried out to the schedule and highest HSE standards.

  • September 1999 - August 2000

    Piping Foreman, Kharafi National,Isooctane Plant,Dubai,UAE

    • Pitești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries

    -coordination activitie of teams(pipe fitters,welders) on pipiping fabrication activities;
    -coordination activities of teams on piping erection activities;
    -daily progress reporting;
    -providing daily tool-box meeting,ensuring that the piping activities are carried out to the HSE standards.

  • April 1999 - September 1999

    Piping Foreman, Kharafi National,Kuwait,''Sea water injection plant''Project

    • Pitești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    -coordination activities of teams on piping erection activities;
    -taking over installation of 3200 cubic meters tank with flotatingf roof;
    -providing daily tool-box meeting,ensuring that all activities are performed according HSE standards.