32470

Plumber plumbing and gas at S.C. ANDO INTERIM S.R.L.

  • România, Onești
  • România, Onești
  • Romania, Onești
  • Romania, Onești
Deblocheaza date contact
Traduceri ale CV-ului
30%
  • Ultima actualizare: 11.07.2014
  • Numar referinta: 32470

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Incepator
Franceza
Incepator
Germana
Incepator
Romana
Nativ
80%
  • Last update: 11.07.2014
  • Reference number: 32470

Experience

  • August 2012 - June 2014

    Plumber plumbing and gas, S.C. ANDO INTERIM S.R.L.

    • Onești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Of 8 Oct.2012 till 20th Dec.2013 I learned the craft of plumber in France where I executed the following works:
    -I mounted columns drain (waste water, storm), drinking water columns, heat supply columns,     horizontally and vertically according to plan.
    -I used materials: PVC, HTA, HDPE, PEXAL, copper, PUR, black and galvanized pipe. PVC (ø32 ÷ ø350) cold solder, HDPE and HTA (ø32 ÷ ø250) cold solder; PXAL (ø16 ÷ ø50) crimping, copper (ø16 ÷ ø50) by soldering and crimping, PUR (ø16÷ ø28) crimping.
    -I mounted and connected boilers: horizontal suspended, suspended vertically on stand.
    -I mounted sanitary ware: toilet (normal, suspended, for disabled) various designs sinks, kitchen sinks, bidets, urinals, clorifere.
    -I mounted on the ceiling and wall fan coil units.
    -I installed piping for ventilation as planned (from ø125 to ø500).
    -I mounted the base unit.
    

  • January 2004 - August 2011

    Maintenance mechanic, Termoelectrica S.A. Borzesti

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    I performed repair and maintenance work at auxiliary boilers, inspections and adjustments, replacement pipe, leak checking and removing the air and flue gas ducts, gas circuits, water steam circuits, water pump overhaul, air and flue gas fans
    Instrument tubing installation; repaired and maintenance controllers and transducers
    

  • January 1999 - January 2004

    Main steam boilers Operator (Boiler type Pk-47-3 640t / h) , Termoelectrica S.A. Borzesti

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Control and monitoring of boiler operational parameters; (air and flue gas fans, cooling water pumps, feed water pumps), adjusting set points for automation loops according to steam/power demands.

  • September 1990 - January 1999

    Pipe fitter and Steel erector, Termoelectrica S.A. Borzesti

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

      I took part at different work repairing and work keeping  at the boilers and the instalations of the boilers where i made the following   workings:  
     I replaced the steel alloy steel CrMoV Dn28;32;36;38;45;76mm in the tubular system of the boiler,alloy pipe CrMoV Dn 108;194;245;273;325;377;426 mm the link between the different areas of the boiler.
     I checked the valves, safety valves, controller from Dn 10 till Dn500 on the air, water,steam,gase,muzat,oil,H2,CO2 circuits.
     I participated at different projects where i aligned the pipe according to the elevation on the ground and on the scaffold.
    I worked with pipe which is used at high pressure , extra thick and thin pipe , pipe P1,P5,P9 low alloy steel.
    I prepaired the weldings for checking by gamma radiation .
    I worked with pipe threaded and pipe clamp.
    According with the plan i marked the pipe, cut the pipe with the polydisc , i made the bevel according with the scheme 37,5º or 47,5º( extra thick pipe).
    I made the bevel at 47,5º extra thick pipe in two stages  : first stage ¾ i made the bevel at 37,5º, in the second stage i made the bevel at 10º.
    I cleaned with the biaxial the inside and the ouside of th pipe( about 100mm).
    I worked with stainless pipe Dn8;10mm used for impulses of temperature and pressure( water, steam, H2) on the different areas of the boiler and the tunk. 
    I choose according on the plan the flange neck, flange screwed,flange ring,pipe three way, concentric and eccentirc crossover,bend pipe 45º and 90º. 
    According to the plan i made and rigged  up the pils.
    I participated at the project ― AIR CIRCUIT― from the compressor station to the turbines and boilers instalation the stage 2x210MW .
    The layout has a length of 400m and it was built on the ground and on the scaffold at the elevation of 1000;4000;6000;8000;12000mm.This line has Dn100 and represents a collector in which are connected many pipes Dn16, for which can be used in different areas of the boiler or turbine where is needed air pressure. 
    I took part at the project ― CIRCUIT FOR COOLING WATER FOR THE ROTATIVE AGGREGATE BEARING ― made of pipe DN100 with a length of1200m. This line represents a collector where are icluded bend pipes 45º,90º,flanges,valves,filtters. 
    In this line are connected pipes Dn40 which climb at different levels 1000;6000;8000;12000mm, where are the rotative aggregates. .
    I participated at the project ― CIRCUIT FOR  SUPPLYING WITH  MAZUT THE BOILERS PK 47-3 SECTION 2x210MW ― made according to the plan made by pipe Dn130 on a length of 1500m built at the level 1000;4000;15000mm. This is made of three indentical : two tour lines for mazut and a return line for mazut.
    It was used insulated pipe ,valves,safety valves,filtters,measuring and control instalation (pressure and flow).
    I took part at the project ― CIRCUIT FOR SUPPLYING WITH GAS NATURAL THERMIC CENTRAL TURNNING ON THE STEAM BOILER 20t/h. It was used pipe Dn100 , valves,regulator,safety valves ,filtters,measure and control instalation
     ( preassure and flow). The layout has a length of 200 m and it was built at the level 1000;4000mm.
    I used the following tools : polydisc 115,125,180,230mm, biaxial,flanges,needle for marking,marker,level tubular,line sounding,hammer,chisel,welding electric device.
    
    
    STEEL ERECTOR
    I made workings specific to this job:preparation, measuring,marking,cutting,drriling,abrasion,assembling different profiles,metal pieces .
    I took part at the workings for replacing the comb box  for the air preheater , where i made different types of boxes of tin 6mm filled with rolled tin 1,2mm and 0,7mm accoring to the plan.
     I rolled the tin 0,7 mm and 1,2mm  at  the machine shell  (about 125 tones acccording to the plan ).    
     I took part at the metalic workings for the building ―THE THERMIC CENTRAL  for turnnig on the steam boiler 20t, i fixed on the piles made of profiles I200,I270,I300 , link profiles  type U50,U100 braces made of profiles L30;L50;L80;L100 according to the plan .
     I participated at the assembling of the sandwich panels on the walls and the ceilling.
    I built scaffolds at the level 1000;2000;4000; for water pipes, ateam pipes,demineralized water, natural gas,electric lines according to the plan.
    I measured and verified the aligniment of  metal structure on the horizontal and vertical using the level,and the lead sounding and the tape measuring.
    I made all kind of holders for impulse pipes .These were made of profiles L30,L50; ladders for the high levels ( made of plate check 6mm);protection rails made of profiles L30 and concrete reinforced Dn15;Dn20 acorrding to the plan.
    I cut with polydisc and autogenous device  all the mechanic profile  types . 
     I used the following tools : polydisc 115,125,180,230mm, biaxial,flanges,needle for marking,marker,level tubular,line sounding,hammer,chisel,welding electric device.
    I participated at the staining using an air gun or the painting brush.
    
    

Education

  • 2011 - 2012

    Highschool, S.C. RENTCARTRIP S.R.L.

    • Onești, Romania
  • 1986 - 1990

    Highschool, No. 1 Industrial Energetic High School

    • Onești, Romania

Skills

Driving license
  • B

Foreign languages

English
Beginner
French
Beginner
German
Beginner
Romanian
Native