558

Hydrogeologist / Geologist Technician Supervisor - Drilling Department la GAMA POWER SYSTEMS ENGINEERING AND CONTRACTING, INC

  • România, București
  • România, București
  • Romania, București
  • Romania, București
Deblocheaza date contact
Traduceri ale CV-ului
65%
  • Ultima actualizare: 12 oct.
  • Numar referinta: 558

Obiectiv profesional

Sunt disponibil pentru orice oportunitate

  • Romania, Strainatate, Strainatate
  • Full time
  • Domeniile urmariteInginerie Energie / Industrii extractive, Inginerie Industrii / Productie, Muncitori Tehnicieni Soferi
  • Disponibilitate deplasare in interes de serviciuPana la 100% din program
  • Disponibilitate relocareIn tara si in strainatate

Experienta

  • octombrie 2013 - Prezent

    Hydrogeologist / Geologist Technician Supervisor - Drilling Department, GAMA POWER SYSTEMS ENGINEERING AND CONTRACTING, INC

    • Amman, Iordania
    • Project based
    • Domeniu - Inginerie: Industrii / Productie

    	Urmarirea procesului de foraj a sondelor de apa si a litologiei pentru stabilirea pozitiei filtrelor.
    	Analiza granulometriei margaritarului pentru realizarea filtrului artificial
    	Tubarea, Impachetarea si dezvoltarea sondei in vederea testelor finale. 
    	Executarea testelor hidrogeologice in vederea stabilirii parametrilor finali de exploatare.

  • septembrie 1983 - august 2012

    geologist technician, SC Foraj SA Braila

    • București, România
    • Full time
    • Domeniu - Inginerie: Industrii / Productie

    ROMANIA
    Alexandru Obregia street 36, 
    Bl. R14, Apt. 72
      cod 041743
    Bucharest
    Phone: +40 21 6841377
    Mobile: +40 746128486
    E-mail: aurelfaur@yahoo.com
    
    
    Aurel FAUR
    
    
    
    2011 – 2012 HAJJAN DRILLING EST - Kingdom of Saudi Arabia
    Well Site Geologist 
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings)
    Daily Lithology description sheet and MasterLog updating
      Development and water well hydro geological tests (air lift & submersible pump).
    Preparing and submitting Daily Drilling Report to the owner.
    Preparing and submitting the Final “Technical Well Report” to the owner. 
    
    2009 – 2011 MIDROM TRADING Co. – TIMISOARA
    “GREAT MAN-MADE RIVER PROJECT” LIBYA;
    CONTRACTOR - LICAN, LIBYAN CANADIAN DRILLING COMPANY LTD
    Ghadames Water Well field Site Hydro geologist
    Monitoring the water wells’ drilling progress
    Monitoring the formations’ lithology & development methodology
    Water wells development & hydro tests (air lift & submersible pump).
    
    2006	– 2009 S.C. CIPROM Bucuresti Branch S.A. 
                 Technical villages gas net department
    
    2005 – 2006 S.C.FORAJ SONDE BRAILA S.A. 
    Well Site Geologist 
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings)
    Chemical analysis for gas and oil
    Deviation survey, final projection
    Preparing and submitting the Final “Technical Well Report” to the owner. 
    Preparing technical documentation for “PETROM OMV GROUP” biddings 
    Multichannel analyser “Georomservice” equipment drilling parameters supervisor 
    
        2003 - 2005 “MIVAN KIER” WATER SUPLAY ROMANIAN VILLAGES - S.C.FORADEX     S.A. BUCURESTI 
    Hydrogeology technician & Drilling and Development Service Rig Manager
    Monitoring the water wells’ drilling process
    Monitoring the formations’ lithology & development methodology
    Hydro tests water wells.
    
    2002 – 2003 “SINA OASIS COMPANY” – AMMAN, JORDAN
    Geologist technician & Camp Administrator
    Monitoring the formations’ lithology for oil wells at South Rumaila Oilfield, Iraqi National Oil     	Company.
    	Chemical analysis for gas and oil.
    	Deviation survey, final projection
    	Final Master log documentation for the owner.
    
    2000 – 2002 “PETROM R.A.” – “Braila - Subsidiary Drilling Company”
    Geologist technician
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings)
    Chemical analysis for gas and oil
    Deviation survey, final projection
    Preparing and submitting the Final “Technical Well Report” to the owner.
    
    1997 – 2000 Er-petro Ltd. Hungary consulting & engineering
    “GREAT MAN-MADE RIVER PROJECT” LIBYA; “GENERAL WATER AUTHORITY”
    Hydrogeology – Tazerbo Well field Site Supervisor
    Monitoring the water wells’ drilling progress
    Monitoring the formations’ lithology & development methodology
    Water wells development & hydro tests (air lift & submersible pump).
    
    1996 – 1997 “PETROM R.A.” – “Braila - Subsidiary Drilling Company”
    Geologist technician
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings)
    Chemical analysis for gas and oil
    Deviation survey, final projection
    Preparing and submitting the Final “Technical Well Report” to the owner.
    
    
    1995 – 1996 “FORADEX INTERNATIONAL” 
    “GREAT MAN-MADE RIVER PROJECT” LIBYA; 
    Hydrogeology & Development Service Rig Manager
    Monitoring the water wells’ drilling process
    Monitoring the formations’ lithology & development methodology
    Hydro tests water wells.
    
    1992 – 1995 “PETROM R.A.” – “Braila - Subsidiary Drilling Company”
    Geologist technician
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings)
    Chemical analysis for gas and oil
    Deviation survey, final projection
    Preparing and submitting the Final “Technical Well Report” to the owner.
    
    1991 – 1992 “ROMPETROL OF LIBYA” – “GOFS & Co”.
    Geologist technician
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings)
    Chemical analysis for gas and oil
    Gas-Chromatograph unit operator
    Final “Well Master log”
    
    
    1983 – 1991 “PETROM R.A.” – “Braila - Subsidiary Drilling Company”
    Geologist technician
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings)
    Chemical analysis for gas and oil
    Deviation survey, final projection
    Preparing and submitting the Final “Technical Well Report” to the owner.
    
    1981 – 1983 “PETROM R.A.” – “Videle – Subsidiary Production & Drilling Company”
    Geologist technician
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings)
    Chemical analysis for water, gas and oil
    
    
    
    
    I HAVE SUCCESSFULLY COMPLETED
    8 years of primary school.
    5 years of “Mines, Oil & Geology of Industrial High School”.
    1 month on “Cementing & Drilling Fluids” training.
    Type of Diploma – Geological Technician operator
    Present occupation – Geological & Hydro geological Technician.
    Personal Data
    Born on December 07, 1961 Ivesti, Galati district, Romania.
    Good communication and writing in English.
    Good skill in computers 
    Driving licence class B.
    Health: good.
    Passport issued in Romania in 2011
    

  • mai 2009 - martie 2011

    Hydrogeologist, LICAN, LIBYAN CANADIAN DRILLING COMPANY LTD

    • București, România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Muncitori

    2009 – 2011  MIDROM TRADING. Co. – TIMISOARA
    “GREAT MAN-MADE RIVER PROJECT” LIBYA;
    CONTRACTOR - LICAN, LIBYAN CANADIAN DRILLING COMPANY LTD
    Ghadames Water Wellfield Site Hydrogeologist
    Monitoring the water wells’ drilling progress.
    Monitoring the formations’ lithology & development methodology.
    Water wells development & hydrotests (air lift & submersible pump).
    
    2006 – 2009 S.C. CIPROM Bucuresti Branch S.A. 
    	Technical villages gas net department
    
    2005 – 2006 S.C.FORAJ SONDE BRAILA S.A. 
    Well Site Geologist 
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Deviation survey, final projection.
    	Preparing and submitting the Final “Technical Well Report” to the owner. 
    	Preparing tehnical documentation for “PETROM OMV GROUP” biddings. 
    	Multichannel analyser “Georomservice” equipment drilling parameters supervisor. 
    
        2003 - 2005 “MIVAN KIER” WATER SUPLAY ROMANIAN VILLAGES - S.C.FORADEX     S.A. BUCURESTI 
    Hydrogeolog technician & Drilling and Development Service Rig Manager
    Monitoring the water wells’ drilling process.
    Monitoring the formations’ lithology & development methodology.
     Hydrotests water wells.
    
    2002 – 2003 “SINA OASIS COMPANY” – AMMAN, JORDAN
    Geologist technician & Camp Administrator
    Monitoring the formations’ lithology for oil wells at South Rumaila Oilfield, Iraqi National Oil     	Company.
    Chemical analysis for gas and oil.
    	Deviation survey, final projection.
    	Final Masterlog documentation for the owner.
    
    2000 – 2002 “PETROM R.A.” – “Braila - Subsidiary Drilling Company”
    Geologist technician
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Deviation survey, final projection.
    Preparing and submitting the Final “Technical Well Report” to the owner.
    
    1997 – 2000 Er-petro Ltd. Hungary consulting & engineering
    “GREAT MAN-MADE RIVER PROJECT” LIBYA; “GENERAL WATER AUTHORITY”
    Hydrogeolog – Tazerbo Wellfield Site Supervisor
    Monitoring the water wells’ drilling progress.
    Monitoring the formations’ lithology & development methodology.
    Water wells development & hydrotests (air lift & submersible pump).
    
    1996 – 1997 “PETROM R.A.” – “Braila - Subsidiary Drilling Company”
    Geologist technician
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Deviation survey, final projection.
    Preparing and submitting the Final “Technical Well Report” to the owner.
    
    
    1995 – 1996 “FORADEX INTERNATIONAL” 
    “GREAT MAN-MADE RIVER PROJECT” LIBYA; 
    Hydrogeolog & Development Service Rig Manager
    Monitoring the water wells’ drilling process.
    Monitoring the formations’ lithology & development methodology.
    Hydrotests water wells.
    
    1992 – 1995 “PETROM R.A.” – “Braila - Subsidiary Drilling Company”
    Geologist technician
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Deviation survey, final projection.
    Preparing and submitting the Final “Technical Well Report” to the owner.
    
    1991 – 1992 “ROMPETROL OF LIBYA” – “GOFS & Co”.
    Geologist technician
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Gas-Chromatograph unit operator.
    Final “Well Masterlog”.
    
    
    1983 – 1991 “PETROM R.A.” – “Braila - Subsidiary Drilling Company”
    Geologist technician
    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Deviation survey, final projection.
    Preparing and submitting the Final “Technical Well Report” to the owner.
    
    1981 – 1983 “PETROM R.A.” – “Videle – Subsidiary Production & Drilling Company”
    Geologist technician
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for water, gas and oil.
    
    
    
    
    I HAVE SUCCESSFULLY COMPLETED
    8 years of primary school.
    5 years of “Mines, Oil & Geology of Industrial High School”.
    1 month on “Cementing & Drilling Fluids” training.
    Type of Diploma – Geological Technician operator.
    Present occupation – Geological & Hydrogeological Technician.
    Personal Data
    Born on December 07, 1961 Ivesti, Galati district, Romania.
    Good communication and writing in English.
    Good skill in computers 
    Driving licence class B.
    Health: good.
    Passport No: 09408845 issued in Romania in November 2004.
    

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Mediu
Franceza
Incepator
Romana
Nativ
80%
  • Last update: 12 oct.
  • Reference number: 558

Career goals


                            

  • Romania, Strainatate, Strainatate
  • Full time
  • Wanted work domainsEngineering Energy / Extractive Industries, Engineering Industries / Production / Manufacturing, Technicians Drivers
  • Availability for work related travelUp to 100% of the schedule
  • Willing to relocateIn the country and abroad

Experience

  • April 2013 - Present

    Hydrogeologist / Geologist Technician Supervisor - Drilling Department, GAMA POWER SYSTEMS ENGINEERING AND CONTRACTING, INC

    • București, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Disi-Mudawarra To Amman Water Conveyance System Project - Jordan
     Monitoring the water wells’ drilling progress
    Monitoring the formations’ lithology & development methodology
    Water wells hydro tests (air lift & submersible pump).

  • January 2012 - July 2012

    Well site Hydrogelogist, Hajjan Drilling Est Kingdom of Saudi Arabia

    • București, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings)
    Managing the setting for Pump House Casing final depth, according to the owner contract 
    specifications
    Responsible with Daily Lithology description sheet and Master Log update
    Development and water well hydro geological tests (air lift & submersible pump).
    

  • May 2009 - March 2011

    Ghadames Water Wellfield Site Hydrogeologist, LICAN, LIBYAN CANADIAN DRILLING COMPANY LTD

    • București, Romania
    • Full time
    • Work domain - Technicians: Workers

    Monitoring the water wells’ drilling progress.
    Monitoring the formations’ lithology & development methodology.
    Water wells development & hydrotests (air lift & submersible pump).
    

  • April 2006 - May 2009

    Techinician, S.C. CIPROM Bucuresti Branch S.A

    • București, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    	Technical villages gas net department

  • April 2005 - May 2006

    Well Site Geologist , S.C.FORAJ SONDE BRAILA S.A

    • București, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Deviation survey, final projection.
    	Preparing and submitting the Final “Technical Well Report” to the owner. 
    	Preparing tehnical documentation for “PETROM OMV GROUP” biddings. 
    	Multichannel analyser “Georomservice” equipment drilling parameters supervisor. 
    

  • June 2003 - April 2005

    Hydrogeolog technician & Drilling and Development Service Rig Manager, MIVAN KIER” WATER SUPLAY ROMANIAN VILLAGES - S.C.FORADEX S.A. BUCURESTI

    • București, Romania
    • Full time
    • Work domain - Technicians: Workers

    Hydrogeolog technician & Drilling and Development Service Rig Manager
    Monitoring the water wells’ drilling process.
    Monitoring the formations’ lithology & development methodology.
     Hydrotests water wells.
    

  • September 2002 - March 2003

    Geologist technician & Camp Administrator, SINA OASIS COMPANY” – AMMAN, JORDAN

    • București, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Monitoring the formations’ lithology for oil wells at South Rumaila Oilfield, Iraqi National Oil     	Company.
    Chemical analysis for gas and oil.
    	Deviation survey, final projection.
    	Final Masterlog documentation for the owner.
    

  • May 2000 - September 2002

    Geologist technician, PETROM R.A.” – “Braila - Subsidiary Drilling Company”

    • București, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Deviation survey, final projection.
    Preparing and submitting the Final “Technical Well Report” to the owner.
    

  • May 1997 - February 2000

    Hydrogeolog – Tazerbo Wellfield Site Supervisor, Er-petro Ltd. Hungary consulting & engineering “GREAT MAN-MADE RIVER PROJECT” LIBYA; “GENERAL WATER AUTHORITY”

    • București, Romania
    • Full time
    • Work domain - Technicians: Workers

    Monitoring the water wells’ drilling progress.
    Monitoring the formations’ lithology & development methodology.
    Water wells development & hydrotests (air lift & submersible pump).
    

  • May 1995 - July 1996

    Hydrogeolog & Development Service Rig Manager, “FORADEX INTERNATIONAL” “GREAT MAN-MADE RIVER PROJECT” LIBYA; ompany”

    • București, Romania
    • Full time
    • Work domain - Technicians: Workers

    Monitoring the water wells’ drilling process.
    Monitoring the formations’ lithology & development methodology.
    Hydrotests water wells.
    

  • March 1992 - May 1995

    Geologist technician, “PETROM R.A.” – “Braila - Subsidiary Drilling Company”

    • București, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Deviation survey, final projection.
    Preparing and submitting the Final “Technical Well Report” to the owner.
    

  • September 1991 - March 1992

    Geologist technician, “ROMPETROL OF LIBYA” – “GOFS & Co”.

    • București, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Gas-Chromatograph unit operator.
    Final “Well Masterlog”.
    

  • September 1983 - September 1991

    Geologist technician, “PETROM R.A.” – “Braila - Subsidiary Drilling Company”

    • București, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Construction of the preliminary technical & geological design for oil production wells.
    Monitoring the formations’ lithology (shale shaker’s samples and core cuttings).
    Chemical analysis for gas and oil.
    Deviation survey, final projection.
    Preparing and submitting the Final “Technical Well Report” to the owner.
    

Education

  • 1976 - 1981

    Highschool, Industrial High School

    • Aiud, Romania

Skills

Driving license
  • B

Foreign languages

English
Intermediate
French
Beginner
Romanian
Native