56729

Sire Manager la S.C.Moldocons Grup S.R.L.

  • România, Ploiești
  • România, Ploiești
  • Romania, Ploiești
  • Romania, Ploiești
Deblocheaza date contact
Traduceri ale CV-ului
50%
  • Ultima actualizare: 30.10.2015
  • Numar referinta: 56729

Experienta

  • iulie 2014 - aprilie 2015

    Sire Manager, S.C.Moldocons Grup S.R.L.

    • Ploiești, România
    • Full time
    • Domeniu - Inginerie: Constructii

    Liaising with clients and reporting progress, professional staff (such as architects and surveyors) and the public,  supervising contracted staff,  meeting subcontractors,  making safety inspections and ensuring construction and site safety,  checking and preparing site reports, designs and drawings,  maintaining quality control procedures 
      motivating the workforce ,  problem solving

  • septembrie 2013 - aprilie 2014

    Construction Manager, Work Service Impressa-Italy

    • Oyala-Residency of Guineea Equatorial Republic, Global
    • Project based
    • Domeniu - Inginerie: Constructii

    Preparing the site and liaising with other construction professionals such as architects, engineers, buyers, estimators and surveyors before construction work start. Developing the  program  of work and strategy for making the project happen. Planning ahead to prevent  problems on site before they occur, for example, planning the delivery and storage of equipment and materials. Making safety inspections of the site when work is underway and ensuring regulations relating to health safety and the environment (HSE) are adhered  to. Overseeing the running of several projects. using construction management software packages to plan smooth work flows. Communicating with a range of people including the client, subcontractors, suppliers, the public and the workforce.

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Mediu
Franceza
Mediu
Rusa
Incepator
Romana
Nativ
75%
  • Last update: 30.10.2015
  • Reference number: 56729

Experience

  • November 2011 - October 2012

    Civil Quantity surveyor, Technicas Reunidas- Spain

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Quantity Surveyor will require traditional estimating functions such as delineating scopes of work for contractor trades, develop and issue contractor requests for proposals, as well as respond to client requests for proposals. Develop construction cost estimates from unit rates including, plumbing, and civil works. Review and validate contractor bids, ensure compliance to plans and specifications as well as identify potential cost and schedule risks to be mitigated during the execution period. Price bills of quantities for the local market as well as international clients and computer literate in estimating software packages for Construction of industrial plant
    
    

  • March 2011 - November 2011

    Site Manager, Romservice Construct- Bucharest

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

       Cooperating closely with the Safety team to ensure that HSE standards are maintained and that safety issues are monitored and addressed by the site supervision team.
    -   Ensuring that contractors duties are performed by competent and experienced personnel and in sufficient numbers to achieve objectives, promptly advising the Senior field Superintendent or in his absence the Construction Area Manager of any areas of concern. 
    -   Ensuring that the quality of work carried out complies with HSE standards.
    -   Monitoring and reporting, in conjunction with speciality supervisors, technical progress.
    -   Monitoring and reporting, in conjunction with Project Control personnel, the progress of contractors.
    -   Participating in construction meetings with contractors.
    -   Reviewing and commenting on documentation produced by contractors (eg technical reports, specifications, procedures, drawings, etc) ensuring implementation of established procedures and good engineering practice.
    -   Reviewing and evaluating any change proposals / requests, ensuring appropriate technical support is provided in decision making.
    -   Expediting with material control function material delivery, distribution and availability in accordance with planned activities, ensuring Contracts & Procurement are notified to purchase lost or missing material.
    

  • April 2010 - December 2010

    Site Manager, SC Global Trans -Bucharest

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Surveillance of construction at residential project in Bucharest starting with infrastructure and finish with roof, water supply system  and sewerage system.

  • July 2007 - December 2008

    Civil Engineer of pipeline Refinery, Shalenov - Kazahstan

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

     Coordination and organization activity in site of Refinery respecting procedures and instruction of quality system, projects and particular regulation.
    - Marked on terrain distances: marked the tray of pipe-lines 
    - Assurance the contact between pumps station and pipe lines, pressure test and leak tests carried out, according  to specific regulation.
    - Coordinate the work for pipe-fitters and welders, carpenters, concreters, blacksmith fixers and compliance and quality of works executed in a timely manner. 
    

  • September 2006 - July 2007

    Senior Site Engineer, Senior Site Engineer

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Coordination and organization activity in site respecting procedures and instruction quality system, projects and particular regulation. To assist and solve technical problems with the optimum solutions for company;
    -To observe and apply all regulations concerning the Quality Assurance System within the company;
    -Marked on terrain distances between valves manhole, the tray of pipe-lines on the streets , longer of tray, 
    -Assurance the contact between pumps station and pipe lines tray.
    -Make ordering note for supply the site with pipe, materials, fittings, for all links and check in site if all materials was installed as drawings.
    

  • August 2004 - September 2005

    Senior Construction engineer for rehabilitation “Fire fighting System” of Michelin factory., S.C. Seracom International Group - Bucharest

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    To provide directions and instruction to subcontractor as requested by the main contractor, designers, and ensure if they are put in practice.
    To check that subcontractor carries out the work according to relevant quality guidelines and procedures;
    To prepare daily site reports, weekly site reports. 
    To make note of changes in the scope of work and to prepare non-conformance reports and ensure that as-built markups are properly recorded by the subcontractor ;
    To observe and apply all regulations concerning the Quality Assurance System within the company;
    

  • August 2003 - August 2004

    Site Manager, S.C. "INDSERV "S.R.L. -Ploiesti-Romania

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Coordination and organization activity in site respecting procedures and instruction quality system, projects and particular regulation.
    -Award technical consulting for workers
    -Achievement the bill of quantity monthly, daily site report, weekly site report.
    -Ordering the quantity of concrete, re-bar, materials.
    -Checking with site engineer the size, position, level, for each element according drawings (slabs, pillars, re- bar, formwork, scaffold before pouring reinforced concrete)
    

  • October 2002 - August 2003

    Senior Site Engineer, Mivan-Kierr

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Site engineer at Mivan-Kierr for instalation water pipe-line in country: Mehedinti, Gorj, Dolj, Valcea with Sappard Programs.
    -To provide directions and instruction to contractor as requested by the subcontractor;
    -To check that subcontractor carries out the work according to relevant quality guidelines and procedures;
    -To prepare daily site reports;
    -To make note of changes in the scope of work and to prepare non-conformance reports and ensure that as-built markups are properly recorded by the subcontractor ;
    -To assist in the solving of problems and to achieved the optimum solutions for company;
    -To observe and apply all regulations concerning the Quality Assurance System within the company;
    -Marked on terrain distances between fountains, :marked the tray of pipe-lines on the streets , longer of tray.
    -Assurance the connection between pumps station and pipe lines tray.
    -Make note of command for supply the site with pipe , materials for connection and check in site if all materials was erected according drawings.
    -Confirm the activity of equipment in the site.
    

  • February 2002 - October 2002

    Civil Construction Supervisor , ABB – Romanian Branch

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    To provide directions and instruction to contractor as requested by the subcontractor;
    -To check that subcontractor carries out the work according to relevant quality guidelines and procedures;
    -To prepare daily site reports;
    -To make note of changes in the scope of work and to prepare non-conformance reports and ensure that as-built markups are properly recorded by the subcontractor ;
    -To assist in the solving of problems and to achieve the optimum solutions for company;
    -To observe and apply all regulations concerning the Quality Assurance System within the company; 
    -Supervision the execution for foundation of support at cable tray.
    -Check the quantity of concrete pouring in foundation, accuracy   size of foundation, correct positioning of reinforced bar , the support for pillars (iron plate),the deep and high of foundation, size of form work , the alignments for metal poles.
    -Check the quality materials, quantity materials for control room building and in same time in the work are in conformity with drawings.
    -Made the “Construction Book” according national regulations
    

  • November 2000 - February 2002

    Civil Construction Supervisor , HYUNDAI ENGINEERING & CONSTRUCTION CO LTD

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Supervisor for execution at Cogeneration Power Plant executed by HYUNDAI  in PetroBrazi  Refinery (2000-2002)
    -To provide directions and instruction to subcontractor as requested by the subcontractor;
    -To check that subcontractor carries out the work according to relevant quality guidelines and procedures;
    -To prepare daily site reports;
    -To make note of changes in the scope of work and to prepare non-conformance reports and ensure that as-built markups are properly recorded by the subcontractor ;
    -To assist in the solving of problems and to achieve the optimum solutions for company;
    - To observe and apply all regulations concerning the Quality Assurance System within the company;
    -Make the connections between General Contractors (Hyundai) and subcontractors. 
    -Supervise pouring reinforced concrete in foundation of major objective (generator foundation for electricity, control rooms, transformer station ,supports of pillars , pumps station, walls of GIS 110 KVA.
    -Check re-bar for foundation from all major objective , the size of foundation ( horizontal and vertical,  the size of re-bar and position for each element, level of concrete )
    Supervise execution for  water supply system, sewerage system, access roads and concrete platforms, fire water
    

  • May 1991 - November 2000

    Chief engineer of the building site, S.C.UMO S.A Ploiesti

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Co-ordination of the site activity, using technical solution, depending on the execution project
    Access  roads for oils fields in Campina,  Urlati,  Boldesti-Scaieni, Baicoi
    Glass foundation and metallic structure for “BRITISH AMERICAN TOBACO “ in Ploiesti city.
    Supervision and guidance in execution for civilian and industrial buildings in Ploiesti city like: -frigorific storehouse in Ploiesti city.
    - making bill of quantity for materials( gravel, sand ),marked the tray ,marked the change of declivity, supervise the compaction of soil, gravel, sand ,check dimension of road according drawings and technical requirements.
    -assurance the quality of work in conformance with national requirements.
    -check the excavation for glass foundation (dimension, deep, dimension of form work, level) exactly position form iron plate (support for iron pillars).
    - coordinate the work for concreters and carpenters.
    - supervising the execution oil station for “LUKOIL ROMANIA “in Ploiesti, in Busteni, in Azuga.
    -check the accordance between drawings and the build construction.
    -check the deep of foundation, evacuation of water, pouring concrete, make the form work, re-bars, installation windows, doors, metallic roof, sewerage system, pipe lines for fire fighting systems, parking, access roads .
    -make the foundations for reservoir gas, petrol and diesel oil, walls between reservoir, compaction of soil, fence and concrete platforms.
    -check the excavation for glass foundation (dimension, deep, dimension of form work, level), exactly position form iron plate (support for iron pillars).
    -supervision and guidance in execution for civilian and industrial buildings in Ploiesti city, lik1e:
    - roads in Ploiesti city  (streets : Cornatel,  Gradinari, Emile Zola, Th. Aman)
    - reinforced concrete platform 
    -stores (streets : Bunavestire, Ilie Pintilie )
    - for the bigger store house in Ploiesti I’m supervise the execution for one platform (concrete) with all the accessories (sewerage system, evacuation of water rain, building garages, water wash station, oil-gas station , fence, fire-fighting system, water supply system. 
    -water tank (5000 m3) 
    -glass foundations and metallic structure for “VOLVO” representation in Bucharest
    -check the excavation for glass foundation (dimension, deep, dimension of form work, level), exactly position form iron plate (support for iron pillars).
    

Education

  • 1978 - 1981

    Bachelor's degree, Institutul de Constructii Bucuresti

    • București, Romania

Skills

Driving license
  • B

Foreign languages

English
Intermediate
French
Intermediate
Russian
Beginner
Romanian
Native