Experience

  • March 2011 - August 2012

    MPS Foreman, TOZZI LLP/Agip KCO KAZAKHSTAN

    • Bacău, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries,Industries / Production / Manufacturing

    Electrical/Instrument/Mechanical modifications in all the  D/ A Islands LER’s(Local Equipment Rooms)for F&G System instal infrared flame detectors and gas asper safety standards and drawings,wellhead ESD System fabricating and connecting stainless steel pipe extra heavy for high pressure , bending, threading and beveling with special machine and assembling with autoclave system 1000 bar from skids panel to ESD valves, fabricating supports and cable tray lines all asper client request with safety and quality standards  , HVAC  System fabricating , assembling and modiffy water supply line with galvanized pipe of different sizes from chiller system maked asper isometrics and revizion, Firefighting System making lays out from CO2carbon-steel pipeline and  reorganize support sistem, asper site instruction maked by client, Telecom System  install CCTV camera and fabricating supports for them, according to Project request/Eni/Agip indications and Mechanical Completion asper punch lists dellivered by client ,Pre-commissioning of all the items. Fabrication and erection of stainless steel pipe line, assembled with niple PARKER 316 sistem from Compressed air for Emergency Pressurization Sistem , Pressure Reducing Panels, manifolds, draining line from Emergency Chiller Sistem , copper pipe line, instrumental tubbing, cable tray different sizes , many tipes of structure from instrumentation devices all as per isometrics and revisions.

  • February 2006 - December 2010

    Team Lead, ERSAI CASPIAN CONTRACTOR LLC, Republic of KAZAKHSTAN

    • Bacău, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Fabrication and  erection of the steel structures using beams of 100-700 HEA,HEB, fabrication of 1000 mm beams from 50-75mm plates, piles from 47-inch carbon steel pipe and flares using 14,16,18 inch carbon steel,extension from marine drilling platform using different beams, profiles and plates, mud tanks using beams from 100 mm to 500 mm, corogate plate, pipe rack supports,pipe linespools stainlles steel,carbon steel heavy and extra heavy, copper nickel pipe, from 2-inch to 20-inch erection, alignement, leveling,hidrotest, asper isometrics. Cutting, grinding, beveling and fit up of spools as per ISO and P&ID, spools made of carbon steel, stainless steel, law alloy steel, galvanized, Cupper Nickel, etc. with a large spectrum of sizes from ¾ to 30 inch according to the ISO and given coordinates. 
    Installation of fittings: elbow, tee, reducer, flange, etc, different types of valves: ball valve, globe valve, butterfly valve, check valve, control valve etc,  gaskets, bolting activities.Installation of various type of supports: clamp shoes, special pipe supports, spring supports, anchors, reinforcing pads, guides/hold down guides etc, as per given ISO. Checking spools length and material as per drawings. Cutting, grinding and beveling of different types of beam, primary and secondary.Preparing the structural beam support as per Standards and according to the specific drawing.
    

  • May 2005 - January 2006

    Team Lead, Saipem –Nigeria

    • Bacău, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Fabrication and erection of the steel structures and pipe racks.Erection of equipment supports. Building a gas power plants, with three generators, two using gas as fuel and the third using the steam from the other two. I produced and engineered, reviewed structural work progress and coordinate changes in schedules steel structure using beams of 100-700 HEA, HEB, U profiles, angles, assembled by welding and bolts. manufacture and installation of supports for pumps and compressors, Static equipment assembly, alignment and leveling asper isometrics. Erected steel and lays out trusses and structures to specific dimensions. Cutting, grinding, beveling and fit up of spools as per ISO and P&ID, spools made of carbon steel, stainless steel, law alloy steel, galvanized, Cupper Nickel, etc. with a large spectrum of sizes acording to ISO and P&ID.

  • May 2004 - March 2005

    Hydro test Team Lead, P.S.L, Baku - Azerbaijan

    • Bacău, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Preparing systems for Hydro/Pneumatic Test as per Isometrics and P&ID included in  Test Packs.
    Performing pressure test, witnessed by QC-Inspector  and client.
    Reinstatement of all items removed for test. Torque and tighten bolted joints.
    

  • April 1997 - May 2004

    PIPE FITTER, SC.CET. SA Bacau

    • Bacău, Romania
    • Full time
    • Work domain - Technicians: Workers

    Fabrication of Steels structures and gas pipe line,pipe blowing. Building a power plant of 50 megawatt coal-fired boilers and two gas combustion of 240 tons each. I participated in the construction of gas pipe line carbon steel 12-inch fitting station for adjusting gas pressure automatic safety valves ,assembled and secured pipes, tubes, fittings, and related equipment, according to specifications, by welding, brazing, cementing, soldering, and threading joints.Attached pipes to walls, structures and fixtures, such as radiators or tanks, using brackets, clamps, tools or welding equipment, steel structure fabrication and assembly of a boiler turbine house with steel beams of various sizes , installation of heat exchanger inside the boiler made of carbon steel pipe 3-inch high pressure , pipe line fabrication and erection,carbon steel, copper nickel,gas plant,hidrotest  leak test asper isometrics ,using water and air, blowings.

  • February 1995 - March 1997

    PIPE FITTER- Fuel Stations , N.I.S YUGOSLAVIA

    • Bacău, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Fabrication of carbon steel pipe line spools and erection cutting,grinding, beveling, fitting using cutting torch , grinder machine and pencil grender, pressure vessels steel using 10mm normal plate reinforced by ‚‚U’’ profiles using hydraulics jacks , chain blocks , pull chainers , making lays out, fabricates, maintains, threading and repair mechanical piping system from fuel line and suply line , basement supports using different tipes of beams  , structure , leveling and alignement static equipment, fuel pumps , emergency draining sistem , assembled by welding and bolts,  hidrotest from fuel station using high capacity water pump , gauge system for pressure monitoring and leaks , all maked asper isometrics and drawings.

  • March 1988 - February 1995

    PIPE FITTER, SC.SCUT.SA BACAU

    • Bacău, Romania
    • Full time
    • Work domain - Technicians: Construction

    Fabrication and erection of 24 inches carbon steel spool pipe with elbows, weld neck flanges, loose flanges, bellause and erecting on water with 24 mm bolts and rubber gasckets.Utility piping for civil construction consist of coopper, PVC , CPVC ,polyethylene and galvanized pipe wich is tipicaly glued, threaded or welded.            

Education

  • 1983 - 1985

    Highschool, Liceul Industrial de Marina Galati

    • Galați, Romania
  • 1981 - 1983

    Highschool, Liceul Industrial Nr.2 Bacau

    • Bacău, Romania

Foreign languages

English
Advanced
Italian
Intermediate
Russian
Beginner
Romanian
Native