5879

Rig manager workover at BURGAN DRILLING,TRADING & MAINT. KUWAIT

  • România, Ploiești
  • România, Ploiești
  • Romania, Ploiești
  • Romania, Ploiești
Deblocheaza date contact
Traduceri ale CV-ului
25%
  • Ultima actualizare: 24.05.2011
  • Numar referinta: 5879

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Mediu
Franceza
Incepator
Romana
Nativ
75%
  • Last update: 24.05.2011
  • Reference number: 5879

Experience

  • December 2010 - Present

    Rig manager workover, BURGAN DRILLING,TRADING & MAINT. KUWAIT

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries,Industries / Production / Manufacturing

    -  Prepare the daily well report related to well intervention at the end of the well   intervention
    -   Provides technical advice and recommendation regarding drilling, production /
     operation, maintenance, abandonment and project teams when required.
    -  Ensure full compliance with all HSEQ procedures/regulations. Minimum compliance
     level of HSEQ requirements are Petrom/OMV procedures or equivalent Romanian legal
     regulation.
    - Direct, coordinate and supervise operations to preparation well for:
    - acidisation and tension-active treatment
    - cementing, and milling
    - washing,clearing by clack valve cutter,sand-bailer
    - fishing after: tools,tubing, pump rods,electrical cable
    - replaced helical pump, charge pump,TH,RH,PCP ,ESP.
    - check seal,detected top leak,swabing for negative test cassing  and test productions
    - completions fluids program, stimulation program, well testing program, well evaluation program  and  all  preparation for:                                                                                                  perforating program, washover operations with coiled-tubing, frack-pack,gravell-packing
      

  • February 2008 - September 2010

    Head of workover and well intervention, OMV PETROM ROMANIA

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    -  Monitoring working formation’s activity, work scheduling in workover, performing workover activity at wells; capital repairs at wells, Responsible for all administrative management and engineering functions at 5 well rigs
    -  Ensure the implementation and the application of the operating polices and procedures.
      -  Prepare the daily well report related to well intervention at the end of the well intervention
    
      -  Direct, coordinate and supervise operations execution, maximizing productivity, minimizing costs and managing priorities;
      -  Supervise workover equipments set-up, record the possible unconfomities and addreses the replacement request;
      -	Monitor equipmqnts failures and adrress  actions to restore working activities;
      -   Monitor the consumption and stock of material  availables at well site and request materials and recording , checking and confirming the repairs , interventions , mechanic and electric works .
    -	Recording and calculate the losses of electricity brakes and mechanic failures causes                     
      -  Plan and manage the department resources according to the agreed and established budget.
    -   Provides technical advice and recommendation regarding drilling, production / operation, maintenance, abandonment and project teams when required.
    
        -  Support the implementation and monitoring of corporate technical guidelines and standards, operating procedures and technical studies.
      -  Ensure full compliance with all HSEQ procedures/regulations. Minimum compliance level of HSEQ requirements are Petrom/OMV procedures or equivalent Romanian legal regulation.
      -  Design well completion through the discution with sub-Surface Departament to finalize completion design.
    
    

  • May 2004 - February 2008

    Head of workover and well intervention , PETROMSERVICE SA

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

     
    -  Monitoring working formation’s activity, work scheduling in workover, performing workover activity at wells; capital repairs at wells, Responsible for all administrative management and engineering functions at 5 well rigs
    -  Ensure the implementation and the application of the operating polices and procedures.
      -  Prepare the daily well report related to well intervention at the end of the well intervention
      -  Direct, coordinate and supervise operations execution, maximizing productivity, minimizing costs and managing priorities;
      -  Supervise workover equipments set-up, record the possible unconfomities and addreses the replacement request;
      -   Monitor equipmqnts failures and adrress  actions to restore working activities
      -   Monitor the consumption and stock of material  availables at well site and request materials and recording , checking and confirming the repairs , interventions , mechanic and electric works .
     -	Recording and calculate the losses of electricity brakes and mechanic failures causes                     
      -  Plan and manage the department resources according to the agreed and established budget.
      -   Provides technical advice and recommendation regarding drilling, production / operation, maintenance, abandonment and project teams when required.
      -  Support the implementation and monitoring of corporate technical guidelines and standards, operating procedures and technical studies.
      -  Ensure full compliance with all HSEQ procedures/regulations. Minimum compliance level of HSEQ requirements are Petrom/OMV procedures or equivalent Romanian legal regulation.
      -  Design well completion through the discution with sub-Surface Departament to finalize completion design
    

  • January 1997 - May 2004

    Head of production oil & gas, PETROM ROMANIA

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Head of  production  oil &  gas
    -  Monitor and optimise well performance, required echo meter measurement at wells    with bottom hole pumps.
    -  Focal point, by asset, for all issues of well performance and production
      -  Monitor and review daily oil & gas production and weekly oil inventory
      -  Diagnose well productivity issues and recommends/implements remedial
      -  Implement new technologies for production enhancement.
      - Prepare the daily well report related to well intervention at the end of the well    intervention
    -  Direct, coordinate and supervise operations execution, maximizing productivity,
     minimizing costs and managing priorities;
    -  Supervise workover equipments set-up, record the possible unconfomities and 
     addreses the replacement request;
    -  Monitor equipmqnts failures and adrress  actions to restore working activities;
    -  Monitor the consumption and stock of material  availables at well site and request
     materials and recording , checking and confirming the repairs , interventions ,
     mechanic and electric works . 
    -  Centralizing and calculate the oil gas and gasoline production 
    -  Recording and calculate the losses of electricity brakes and mechanic failures causes.
      -  Elaborating of daily reports regarding: 
    	completely branch activity
    	oil gas and gasoline production .
    	calculate the all losses and their  justification
    	technology problems .
    	the sectors requires .
    	any possible accidents . 
    -	Plan and manage the department resources according to the agreed and established
     budget.
    -	 Provides technical advice and recommendation regarding drilling, production/ 
    operation, maintenance, abandonment and project teams when required.
    -	Support the implementation and monitoring of corporate technical guidelines
     and standards, operating procedures and technical studies.
    -	Ensure full compliance with all HSEQ procedures/regulations. Minimum 
    compliance level of HSEQ requirements are Petrom/OMV procedures or equivalent
     Romanian legal regulation.
    -	Design well completion through the discution with sub-Surface Departament to 
    finalize completion design  
    
      
                   
    

  • May 1992 - January 1997

    Supervisor Perform Technology well intervention, WorkOver and production, PETROM ROMANIA

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    
      -  Responsible for supervisor all activity for 245 wells in gas-lift and conventional bottom hole pumps like:
      -  Well cutting sample, wells calibration schedule, schedule for intervention rig at , required echo meter measurement at wells with bottom hole pumps.
      -  Responsible for welding and mechanical, electrical permit to work in tank farm area
    -  Experience in all production facilities separators,treaters,headers and safety sensors.
      -  Responsible for handover report between rig tool pusher and production department after operations was finished at well site.
      -  Responsible for all administrative management and engineering functions for tank farm.
      -  Responsible for all  HSEQ activity in tank farm. 
      -  Responsible for all administrative management and engineering functions as night shift engineer at production department.
      -  Check production during the night shift in tank farms and make calculation for gross production during all day.
      -  Responsible for all interventions and workover operations during the night shift.
      -  Preparation and treatment of oil production in the field for custody transfer.
      -  Responsible for all firefighting systems in production field during the night shift. 
    

  • September 1990 - May 1992

    Rig manager , intervention and Work-Over , PETROM ROMANIA

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    -  Prepare the daily well report related to well intervention at the end of the well intervention
    -   Provides technical advice and recommendation regarding drilling, production /
     operation, maintenance, abandonment and project teams when required.
    -  Ensure full compliance with all HSEQ procedures/regulations. Minimum compliance
     level of HSEQ requirements are Petrom/OMV procedures or equivalent Romanian legal
     regulation.
    - Direct, coordinate and supervise operations to preparation well for:
    - well exploatation by gas-lift
    - acidisation and tension-active treatment
    - cementing, and milling
    - washing,clearing by clack valve cutter,sand-bailer
    - fishing after: tools,tubing, pump rods
    - replaced helical pump, charge pump,PCP (progressive cavity pump).ESP
    - check seal,swabing, and test productions
    - completions fluids program, stimulation program, well testing program, well evaluation program  and  all  preparation for:                                                                                                  perforating program, washover operations with coiled-tubing, frack-pack,gravell-packing
    

Education

  • 1984 - 1990

    Bachelor's degree, UNIVERSITY OIL AND GAS PLOIESTI CITY DRILLING AND EXTRACTION OIL AND GAS

    • Ploiești, Romania

Skills

Driving license
  • B

Foreign languages

English
Intermediate
French
Beginner
Romanian
Native