5889

Civil Supervisor Inspector at Profile Midlle East UAE / Saipem Br. SHARJAH

  • România, București
  • România, București
  • Romania, București
  • Romania, București
Deblocheaza date contact
Traduceri ale CV-ului
40%
  • Ultima actualizare: 11.11.2015
  • Numar referinta: 5889

Obiectiv profesional


                            

  • Midle East, Europe, Asia
  • Project based
  • Domeniile urmariteInginerie Constructii, Inginerie Energie / Industrii extractive
  • Disponibilitate deplasare in interes de serviciuPana la 100% din program
  • Disponibilitate relocareIn tara si in strainatate

Aptitudini

Permis de conducere
  • B
  • Experienta in management
  • Capacitate de a munci in echipa

Limbi straine

Engleza
Avansat
Franceza
Avansat
Italiana
Incepator
Rusa
Incepator
Romana
Nativ
100%
  • Last update: 11.11.2015
  • Reference number: 5889

Career goals

Civil Supervisor

  • Midle East, Europe, Asia
  • Project based
  • Wanted work domainsEngineering Construction, Engineering Energy / Extractive Industries
  • Availability for work related travelUp to 100% of the schedule
  • Willing to relocateIn the country and abroad

Experience

  • October 2014 - Present

    Civil Supervisor Inspector, Profile Midlle East UAE / Saipem Br. SHARJAH

    • Um Qasar / Bashra, Irak
    • Project based
    • Work domain - Engineering: Energy / Extractive Industries

    *Coordinate and monitoring day-to-day operation on site and achieve daily management of operations regarding the inspection of structures, oil and gas pipelines and equipment ( vessels and tanks ).
    *Coordinate and monitoring day-to-day the activity of subcontractors staff regarding to the work, knowledge and implementation of the rules and requirements of the project at company standards.
    *Preparing and planning the work for inspection.
    *Follow the preparation and registration of documents specific to the site, on quality, receptions, inspections and HSE.
    *Ensuring the support for staff by providing appropriate training and toolbox talks to ensure compliance of project implementation.
    *Ensuring that all work on site was carried out safely, to the correct quality and having a minimum impact on the environment
    *Verification and approval the norms of work and hours worked
    *Reporting the activity and progress on site to the Project Manager

  • March 2014 - August 2014

    Civil Site Manager, Profile Middle East UAE (Prisma Engineering It.-Branch Libya)

    • Zliten / Tripoli, Libya
    • Full time
    • Work domain - Technicians: Construction

    Responsibilities:
    *Coordinate and monitoring day-to-day operation on site and achieve daily management of operations related to human resources, equipment, tools, ordering and receiving materials, storage of this, procedures and technical documentation for execution.
    *Preparing and planning of schedules for the entire work (Manpower, Machinery, Materials & Equipment) and ensuring that all work is performed to the standards required for the project and company
    *Follow the preparation and registration of documents specific to the site, on quality, receptions, inspections and HSE
    *Ensuring the support for staff by providing appropriate training and toolbox talks to ensure compliance of project implementation.
    *Ensuring that all work on site was carried out safely, to the correct quality and having a minimum impact on the environment
    *Verifying the quality of works execution
    *Approval of material orders and follow them on site on time delivery
    *Verification and approval the norms of work and hours worked
    *Reporting the activity and progress on site to the Construction Manager
    
    Achievements: 
    Zliten Teaching Hospital Project – consists in the execution of the infrastructure and superstructure .

  • November 2012 - February 2014

    Site Manager Concrete Works, Botrygg AB Sweden

    • Gotheborg / Orebro, Sweden
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Responsibilities:
    *Coordinate and monitoring day-to-day operation on site and achieve daily management of operations related to human resources, equipment, tools, ordering and receiving materials, storage of this, procedures and technical documentation for execution.
    *Preparing and planning of schedules for the entire work (Manpower, Machinery, Materials & Equipment) and ensuring that all work is performed to the standards required for the project and company
    *Follow the preparation and registration of documents specific to the site, on quality, receptions, inspections and HSE
    *Ensuring the support for staff by providing appropriate training and toolbox talks to ensure compliance of project implementation.
    *Ensuring that all work on site was carried out safely, to the correct quality and having a minimum impact on the environment
    *Verifying the quality of works execution
    *Approval of material orders and follow them on site on time delivery
    *Verification and approval the norms of work and hours worked
    *Reporting the activity and progress on site to the Construction Manager.
    
    Achievements: 
    Lagerbladet Project – consists in the execution of the infrastructure and superstructure of the residential park ( 7 blocks housing, office, retail space and underground parking spaces on two levels ) in Orebro and Wastergarten Project in Goteborg ( identical project )

  • July 2011 - May 2012

    Senior Supervisor Civil Works, Saipem Spa (Branch Abu Dhabi)

    • AbuDhabi, Abu Dhabi
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries,Industries / Production / Manufacturing

    -Ensuring that all sub-contractors under supervision are competent, fully trained, are aware of all requirements of project and they was appraised  before starting the work on site
    -Monitoring and achieve daily management of site operations related to human resources, equipment, tools, and materials storage of this on site, procedures and technical documentation for execution
    -Ensuring that all work on site is carried out to adequate standards as stated in the contractual specification
    -Verifying the technical and quality documentation.
    -Coordination with technical office and QC department to verify and ensured that construction activities and facilities are being completed and are implemented in accordance with current specifications and standards 
    -Verifying the quality execution of works and follow for be applying the RFI at all the phase requested by the norms and project.
    -Ensuring that all productivity targets are achieve
    -Ensuring the support for staff by providing appropriate training and toolbox talks to ensure compliance of project implementation
    -Monitoring the progress of work according with schedules execution
    -Verifying the works reports of subcontractor regarding amounts of quantities  prepared in accordance with contractual requirements
    -Liaising between the site's staff of Dodsal (subcontractor) and PMC supervisors of the beneficiary Al Hosn Gas.
    -Collect information and data about daily work activities
    -Reporting the activity on site to the head of the construction site

  • November 2010 - March 2011

    Civil Site Supervisor, Saipem

    • Arzew / Oran, Algeria
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    *Manage day-to-day operation, on site, human resource, materials and transport and stores related issues
    *Ensure that all staff and sub-contractors under supervision are competent, fully trained, are aware of all requirements and have been fully approved, appraised and/or inducted before starting on site
    *Ensure all work on site is carried out to adequate standards as stated in the contractual specification	
    *Ensure all productivity targets are achieve
    *Ensure all work on site is carried out safely, to the correct quality and having a minimum impact on the environment
    *Ensure that all time sheets for staff under supervision are complete, accurate and authorized

  • November 2009 - November 2010

    Site Supervisor, Impregilo

    • Misratah, Libya
    • Full time
    • Work domain - Technicians: Construction

    *Coordinate day-to-day operation on site, human resource, transport, materials and stores related issues					
    *Ensure that all staff and sub-contractors under supervision are competent, fully trained, are aware of all requirements and have been fully approved, appraised and/or inducted before starting on site	
    *Ensure all productivity targets are achieved		
    *Ensure all work on site is carried out safely, to the correct quality and having a minimum impact on the environment
    *Attend site management review meetings (as instructed) to discuss various construction related issues and opportunities for system and execution improvements
    *Monitoring the nonconformity and solve it 
    *Coordinate with technical office ,MEP office and QC department to verify and ensure that Construction activities and facilities are being completed and are implemented in accordance with current specifications and standards  
    *In conjunction with the Site Construction Engineers, identify current and potential problems and propose corrective and/or preventive actions in the construction part of the project.
    *Collect information and data about daily work activities and send to the Construction Manager to verify that project is going on schedule and within the set time and budget limits

  • June 2006 - July 2009

    Site Supervisor, : Novatec Project Management (Anchor Group)

    • București, Romania
    • Full time
    • Work domain - Finance: Consulting,Management

    *Main responsibilities were coordinating and supervising the execution of the construction by the contractor.
    *Responsible for the issuing, updating and controlling of quantity reports and accounting documents in accordance with the monthly work sheets.  
    *Verifying the technical and quality documentation of materials and approving using the materials on site.
    *Checking of the works carried out at sites and preparation of the weekly and monthly progress reports.
    *Monthly measurement records preparation in order to be agreed by the Client.
    *Supervising the contractors respect the quality plan and manual of quality. 
    *Monitoring the nonconformity and solve it. 
    *Monitoring the contractor respect the rules of health and safety.
    *Coordinate the meetings regarding quality and safety of work.
    * Ensure all work on site is carried out safely, to the correct quality and having a minimum impact on the environment	
    *Ensure that all time sheets for staff under supervision are complete, accurate and authorized
    *Ensure that the movement and usage labourers and materials in site are carried out in the most efficient manner possible
    *Undertake toolbox talks when necessary and ensure teams fully understand the content and ensure registers of toolbox talks are retained for future reference
    *Offer support to staff by providing appropriate training and toolbox talks to ensure compliance	
    

  • January 2003 - July 2006

    Deputy Site Manager , Sinergy Construct

    • București, Romania
    • Full time
    • Work domain - Technicians: Construction

    *Supervising the execution of the workings, according to the execution project. 
    *Coordinating the worker teams.
    *Drawing up the execution documents according to the norms in force and to the buildings book.
    *Coordinating the supply with materials, equipment and human resources of the building site. 
    *Verifying the technical and quality documentation.
    *Monitoring the contractor respect the rules of health and safety.
    *Coordinate the meetings regarding quality and safety of work.
    *Estimating the works for stage payments for subcontractors.
    *Issuing of intern applications for payment to the client.
    *Tracking execution of the works on schedule and budget execution.
    *Collect information and data about daily works activities and report to Construction Manager to verify that project is going on schedule and within the set time and budget.
    

  • July 2003 - June 2006

    Civil supervisor, Mega Electric Srl

    • București, Romania
    • Full time
    • Work domain - Technicians: Construction

    *Coordinating the personal's and under contractor's activities. 
    *Planning and supervising the execution process and the execution graph. 
    *Coordinating the supply with materials, equipment and human resources of the building site. 
    *Verifying the technical and quality documentation of materials 
    *Drawing up the documents related to the workings execution (records, concrete register).
    *Monitoring the nonconformity and solve it. 
    *Monitoring the contractor respect the rules of health and safety
    *Liaison with clients with regards to interruptions to supply	
    *Review and benchmark Cost of Operations via weekly cost reports and/or cost returns
    *Provide cover for Schedulers and other Agents as required	
    *Ensure that all staff and sub-contractors under supervision are competent, fully trained, are aware of all requirements and have been fully approved, appraised and/or inducted before starting on site	
    *Ensure all productivity targets are achieved
    

  • May 1994 - June 1995

    QS / Civil Supervisor, Beker & Beta

    • București, Romania
    • Full time
    • Work domain - Technicians: Construction

    *Supervising and executing the works, according to the execution project. 
    *Coordinating the teams, drawing up the execution documents according to the norms in force and to the buildings book.
    *Collect information and data about daily works activities to the Construction Manager to verify that project is going on schedule and within the set time and budget.
    *Coordinate between the HSE, QA/QC, Subcontractor, Engineers and Site construction Engineer for be sure that are implemented the performance efficiently inspection, taking into consideration cost, progress manpower and material aspects.
    *Monthly measurement records preparation in order to be agreed by the Client.
    *Maintaining and issuing the subcontractor daily manpower reports.
    *Providing technical support in preparation of appropriate responses as required to all subcontractor claims.
    *Verifying of the subcontractor invoice amounts including any quantity and pricing to ensure prices are prepared in accordance with contractual  requirements.
    
    

  • June 1990 - June 1994

    Supervisor Civil Works, Independent

    • București, Romania
    • Full time
    • Work domain - Technicians: Construction

    *Supervising and execution of works, according to the project requirements.
    *Coordinating the workers teams, drawing up the execution documents according to the norms in force and to the buildings book.
    *Collect information and data about daily works activities and send to Construction
     Manager to verify that project is going on schedule and within the set time and	  budget	
    *Coordinate between the HSE,QA/QC, Subcontractor, Engineers and Site 	 construction Engineer for be sure that are implemented the performance 	efficiently inspection, taking into consideration cost progress manpower and material aspects		  
    

Education

  • 1973 - 1978

    College, Technical High School of Civil and Industrial Constructions

    • București, Romania

Skills

Driving license
  • B
  • Management experience
  • Communication skills
  • Ability to work in team

- PC Skills: word, excel, powerpoint, web searching, autoCAD 
-Technical and Organizational Skills :
•	Drawing and reading plans
•	Knowledge of construction machinery and equipment
•	Use tools and equipment for execution and control of construction
•	Prepare specific documents in construction
•	Knowledge of safety measures in construction works
•	Management and Leading teams
-Social skills and competence: 
•	Verbal communication skills
•	Workplace ethics
•	Analytical skill
•	Initiative and creativity
•	Teamwork ability

Foreign languages

English
Advanced
French
Advanced
Italian
Beginner
Russian
Beginner
Romanian
Native