66971

I&C Field engineer / Team leader la Netel AS Norway

  • Irlanda, Ireland; Carlow Town
  • Irlanda
  • Ireland, Ireland; Carlow Town
  • Ireland
Deblocheaza date contact
Traduceri ale CV-ului
85%
  • Ultima actualizare: 7 mai.
  • Numar referinta: 66971

Experienta

  • septembrie 2015 - ianuarie 2016

    I&C Field engineer / Team leader, Netel AS Norway

    • «Alt oraș», România
    • Full time
    • Domeniu - It Telecom: Telecomunicatii

    Project – ICE NET swap project                                                                                                      Manage a team in the field work for new LTE sites installation, site upgrade and BTS swap in accordance with Alcatel Lucent specification. Responsible for installation of new antenna line ( antennas, feeders, RRU’s, TMA’s, RET’s), testing, troubleshooting and swap old Ericsson BTS with new Alcatel one, commissioning, speed testing, migration of all external alarms to new BTS, acceptance paperwork and snags clearance. 
    PICW on site responsible for H&S implementation.                                                                                                                           On this project cranes and helicopters were used for swap jobs in order to minimize outage.

  • martie 2013 - septembrie 2015

    I&C Telecoms Field engineer / Surveyor / Team leader / Commissioner / Project coordinator, Glenline Telecoms Ireland

    • «Alt oraș», România
    • Full time
    • Domeniu - It Telecom: Telecomunicatii

    Project – Cosmos 1.5                                                                                                                       Expansion Meteor network for LTE 800 stage 2 and preparation site for future adding H3G-second operator- using diplexers, combiners and dual TMA’s in a common antenna line system. 
    Site surveys for finding optimal solution and composition site material list. 
    Manage a team in the field work to ensure that site install will be in accordance with planning.  
    Responsible for new antenna line install, testing and troubleshooting (antennas; feeders; RRU’s; TMA’S; RET; diplexers; steelwork). 
    Responsible for commissioning of all affected technologies in EricssonRBS6K macro solution, call and speed testing, acceptance paperwork and trace acceptance process. 
    Fault finding and solve performances issues on site.                                       PICW on site responsible for H&S implementation.                                                                                                                         
    
    Project – Cosmos                                                                                                                                Expansion Meteor network for LTE800/1800 in Meteor sites or O2 sites.
    Site surveys for finding optimal solution and composition site material list. Responsible for new site build (antennas, feeders,TMA’s, RET’s, RRU’s diplexers, splitters, combiners, steelwork ) , site upgrade to multi standard mix mode GSM1800/LTE1800, commissioning EricssonRBS6K, call and speed testing, paperwork for acceptance, technical support, troubleshooting. 
    Fault finding and solve performances issues on site.                                                                                  PICW on site responsible for H&S implementation.                                                                                                                                                 
    
    Project – NRA                                                                                                                           Expansion Meteor / O2/ H3G networks - Responsible for new site build (antennas, feeders,TMA’s, RET’s, RRU’s, diplexers, splitters, combiners, steelwork ), site upgrade, commissioning EricssonRBS6K or 2K, Call and speed testing, Acceptance paperwork, Technical support, Troubleshooting, Snags clearance, Fault finding and solve performances issues on site.                                                                                                                                               PICW on site responsible for H&S implementation.                                                                                 
    
    Project – Mosaic Consolidation                                                                                                                   Network sharing project between Meteor and O2, by relocate Meteor sites in O2 sites, or reverse, following guest-host rules.                                                                                            Site surveys for finding optimal solution and composition site material list. 
    Manage and technical support for teams in construction and commissioning of new sites. 
     Manage one team in the field work, variable team 3-9 people, depending on the complexity of the work. 
    Responsible for decommissioning of one operator equipment and move all those in the other operator site. Sometime back up equipment were delivered for job. In some cases TX interconnection cable between sites were used for swap job, to minimize down time impact. 
    Responsible for new antenna line install, using new antennas, feeders, diplexers, combiners, RRU’s, RET’s,TMA’s. Feeders test, call and speed testing, migration of all external alarms to new BTS. Recommissioning  and commissioning up to 11  technologies per site by moving  up to 5 technologies for one operator in the other operator RBSs, by changing  RBBs,  using RLS and upgrade to MSMM (G9 / G18 / U9 / U21 / L8 / L18).  Commission all technologies in all possible ways in new or existing Ericsson RBSs 6201/6102, or Ericsson 2K RBS’s. 
    Acceptance paperwork, and snags clearance. 
    Fault finding and solve performances issues. 
    PICW on site responsible for H&S implementation.                                                                                                          
    
    Project – Mosaic P5                                                                                                                       Network sharing project between Meteor and O2, for upgrade Ericsson RBS’s 2K to 6K, and add U900.                                                                                                                               Manage one team in field work for construction of new U900 sites. Build new sites (antennas, feeders,TMA’s, RET’s, RRU’s, diplexers, splitters, combiners, steelwork) or site upgrade only.  Responsible for new sites build or BTS swap. Responsible for antenna line test, site commissioning for Ericsson RBS2K or 6K, call and speed test, migration of all external alarms to new BTS, acceptance paperwork, snag clearance. Some sites were applicable only for card infill jobs. Fault finding and solve performances issues.                                                                                                                                         
    
    Project – Mosaic P4                                                                                                Upgrade Meteor network                                                                                                            BTS swap for adding Meteor U900. Swap existing Meteor BTS Ericsson2K with new Ericsson 6K for U900 upgrade. RUG to RUS swap in existing Ericsson 6K RBS. RLS between GSM900 and U900.Site commissioning, migration of all external alarms to new BTS, speed and call test, troubleshooting, testing new or existing antenna line, snag clearance, acceptance paperwork. Fault finding and solve performances issues on site.                                                                                                                                                                                                                                                                                                                             
    
    Project – Darwin / Earl                                                                                                                                                                                                                                                                                        Expansion and upgrade Vodafone network                                                                                           BTS swap and site configuration upgrade.                                                                          Manage one team in the field work for new sites build or BTS swap. Responsible for antenna line installation and testing (feeders, FO, RRU’s, TMA’s, diplexers, etc.), site commissioning for Ericsson RBS2K or 6K, migration of all external alarms to new BTS, call and speed test, acceptance paperwork, snag clearance, swap report.                                                                                                                                  Ericsson main remote solution RBS6601 and macro RBS6201 were used on this project.     
    Fault finding and solve performances issues on site.
    
    Troubleshooting                                                                                                             Fault finding in order to clear all radio and external alarms. Fault finding and solve performances issues like bad RSSI levels and ICM band for Meteor, O2 and Vodafone networks in Ireland. Investigation of antenna line system components in order to correct any related fault or high VSWR. Investigation of BTS configuration, in order to correct any fault parameter, which can affect site performances.                                                                                                                        
    
    Radio links build                                                                                                                                    O2 network - Upgrade Huawei radio links from RTN600 to RTN900 series. Acceptance paperwork and snags clearance.                                                                                          Meteor network – Build new Ericsson TN links (Installation of antennas; IF cables; groundings; antenna alignment and commissioning.). Acceptance paperwork and snags clearance.                                                                                                                               
    
    LOS – Line–of- sight propagation surveys for new links                                                             Meteor network - Line-of-sight propagation surveys for new links to find best solution from multiple choice options.                                                                                                              
    Site surveys for new sites or site upgrade.                                                                               Meteor and O2 networks - Site surveys for new sites or site upgrade in order to find best solution for new site build, upgrade or consolidation between operators.

  • decembrie 2011 - martie 2013

    I&C Field engineer / Team leader, SPL Powerlines Siemens Austria

    • «Alt oraș», România
    • Full time
    • Domeniu - It Telecom: Telecomunicatii

    Project – T-MOBILE Austria – 2G BTS swap project.                                                        GSM900 and DCS1800 BTS swap.                                                                                        Manage a team for swap existing BTS Siemens 240 / 241 XL with new BTS - Huawei BBU 3900 family.  Responsible for BTS swap and commissioning, swap old PSU Voigt Haffner with new TP Huawei PSU, migration of all radio links, sensors and other devices power source from old PSU in to the new one, migration of all external alarms to new BTS, site activation, call and speed testing, RF antenna line testing, acceptance paperwork and swap report.
    Working day and night shifts for small network impact.                                                                  On this project cranes and helicopters were used for swap jobs in order to minimize outage.

  • mai 2011 - octombrie 2011

    I&C Field engineer / Team leader, Graniou Belgium

    • «Alt oraș», România
    • Full time
    • Domeniu - It Telecom: Telecomunicatii

    Project – 3G BASE Swap project.                                                                                      Swap existing 3G BTS Ericsson 3K with new BTS ZTE BBU 8200 family. 
    Manage a team for swap job. Reconfiguring antenna line system, installation of RRU’s, TMA’s, feeders and optical cables, commissioning, integration, RF feeder test, call and speed test, preparation of site folder, troubleshooting, snags clearance.

  • februarie 2006 - aprilie 2011

    I&C Field engineer / Team leader / Technical support, Egnatia Group - Romania / Bulgaria / Greece / Albania

    • București, România
    • Full time
    • Domeniu - It Telecom: Telecomunicatii

    Projects – Romania - Expansion of several networks projects – Telekom, Vodafone, Orange and Romtelecom.                                                                                                                    Team leader for new site build.                                                                                               PICW on site responsible for H&S implementation.                                                                                  Responsible for all site build – Installation of shelters / cabins.                                                Installation of AC boards PMB, LDB, SWAC and PLC.                                                   Installation of DC PSU – Sunlight, Power-one, Eltek.                                                     Installation cabin sensors and link all site devices to external alarms box or PLC.
     Installation of antenna line system – RF panels, feeders, TMA’s, optical fiber, RRU’s, steelwork. 
    Testing and troubleshooting antenna line.                                                                      Installation commissioning and troubleshooting radio links. (MW antennas; IF cables; waveguides; groundings.)                                                                                               Installation commissioning and troubleshooting BTS.                                                           Deliver site folder paperwork for acceptance process.                                           Troubleshooting performance issues.                                                                                   Quality check.                                                                                                                 Installation, commissioning and troubleshooting experience of PDH/SDH equipment: 
    Ericsson Minilink E, Ericsson Minilink TN, Alcatel 9400 UX/LX, Alcatel 9400 AWY, Alcatel Melody 9400, Alcatel 9500 MXC, Huawei RTN 900 series. 
     Installation, commissioning and troubleshooting experience of GSM / DCS / UMTS equipment: 
    Ericsson 2000 series, Ericsson 6000 series.                                                                      Siemens BS240XL /241.                                                                                                            ZTE BBU 8200 Family.                                                                                                         Huawei BBU 3900 Family.    
    
    Project – Greece – Expansion of Cosmote and Wind networks.                             Manage a team for new site build.                                                                                             Installation of new antennas, feeders, TMA’s, RET’s.                                                                          Test new feeders.                                                                                                    Commissioning and integration of Ericsson 2K RBS and call test.                                 Installation and commissioning of new Ericsson Minilink E links.                                   Paperwork for acceptance process. 
    
    Project – Bulgaria – Expansion of Globul network.                                                             Manage a team for new site build.                                                                                  Installation of new antennas, feeders, TMA’s.                                                                                Test new feeders.                                                                                                                  Quality check.                                                                                                                
    
    Project – Albania – Expansion of Cosmote and Plus networks.                               Manage a team for new site build.                                                                                         Installation of new antennas, feeders, TMA’s.                                                                                Test new feeders.                                                                                                                    Installation of Eltek PSU.                                                                                                           Installation and commissioning of new Ericsson Minilink E links.

Educatie

  • 1994 - 2003

    Liceu / scoala profesionala, Marin Preda College

    • Sociologie
    • București, România

Aptitudini

  • Capacitate de a munci in echipa
  • Capacitate de negociere si de convingere
  • Adaptare rapida la un grup nou

DRIVING LICENSE  - L-driver B Irish 

COMPUTER SKILLS
Very good skills using and troubleshooting PC.                                                                              Very good skills for all Microsoft windows op. systems.                                                            Very good command of Microsoft Office tools.

SOCIAL SKILLS AND COMPETENCES                                                                         Teamwork oriented, Problem solving, Hardworking, Determined.

JOB – RELATED SKILLS
Ericsson project trained for U9 and LTE	- Ericsson Ireland 2013            Ericsson project trained for 2nd ' generation DUW ' s - Ericsson Ireland 2015 
Huawei RTN 900 series installation and commissioning training course - Ireland 2015           

Very easy and smoothly jump in to a new project.                                                                                                                 

Strong rigging skills.                                                                                                                

PICW on site responsible for H&S implementation. (Very good understanding of working in a climate in agreement with H & S regulations.)

Limbi straine

Engleza
Avansat

Distinctii

Cursuri / traininguri
MEWP - mobile elevated work platform operator 
Manual handling 
First Aid Course 
RF awareness training 
Rooftop safe access 
Advanced climber 
Rescue from telecom structures 
ESB site access induction - Ireland
Safe pass (Site safe access) - Ireland
Shared access telecom sites - Ireland
CIE sites access - Ireland
RTE site access - Ireland
35%
  • Last update: 7 mai.
  • Reference number: 66971

Skills

  • Ability to work in team
  • Negotiation skills
  • Interpersonal skills

Foreign languages

English
Advanced