Experienta

  • aprilie 2011 - Prezent

    Inginer ofertare,, SC STIZO NUCLEAR

    • Fetești, România
    • Full time
    • Domeniu - It Telecom: Inginerie

    - Urmarirea pe SEAP/Proceduri de atribuire/Cereri de oferta/Invitatii de participare,anunturi
    de participare;
    - Elaborarea propunerii tehnice si financiare, participarea la licitatii;
    - Intocmirea Notelor de Renuntare ,Notelor de comanda Suplimentare si a
    Situatiilor de llucrari pe articole de deviz;
    - Cunoscator si posesor al Programului Doclib 38.
    

  • martie 2010 - martie 2011

    Inginerie Asistenta Tehnica, RAAN - SITON Magurele

    • Fetești, România
    • Full time
    • Domeniu - It Telecom: Inginerie

    Inspectii asupra calitatii constructiilor unitatilor U3 si U4 executate la C.N.E. Cernavoda,emitereRapoarte de Neconformitate a lucrarilor neconforme,solutii de remediere a acestora prin Dispozitii de Santier si evaluarea costului de reparatii 

  • noiembrie 2007 - martie 2010

    Inginer ofertare,, SC Filip Construct SRL

    • Fetești, România
    • Full time
    • Domeniu - It Telecom: Inginerie

    - Urmarirea pe SEAP/Proceduri de atribuire/Cereri de oferta/Invitatii de participare;
    - Elaborarea propunerii tehnice si financiare, participarea la licitatii;
    - Verificarea calitatii lucrarilor pe faze de executie;
    - Urmarirea lucrarilor pe stadii fizice;
    - Elaborarea situatiilor de lucrari pe articole de deviz;
    - Cunoscator si posesor al Programului Doclib 38
    

  • septembrie 2002 - noiembrie 2007

    Quality Supervisor, Societatea Nationala Nuclearelectrica(SNN)-Sucursala CNE Invest Cernavoda

    • Fetești, România
    • Full time
    • Domeniu - It Telecom: Inginerie

    Supravegherea si verificarea activitatii de control a compartimentelor CTC ale firmelor contractoare de pe platforma CNE Cernavoda avand ca obiect de activitate executarea elementelor structurale din beton armat, executarea hidroizolatiei, compartimentarilor interioare,realizarea captuselilor decontaminabile epoxidice,
    etansari cu chituri polisulfidice,lucrari de finisaje si protectii anticorozive.
    Control in punctele de stationare obligatorie sau de asistenta din partea beneficiarului;verificarea inregistrarilor de calitate emise pe parcursul executiei lucrarii;confirmarea din punct de vedere calitativ a progresului lucrarii si avizarea platii; verificarea actualizarii planurilor de executie cu situatia finala din teren;emiterea Rapoartelor de Neconformitate in cazul observarii unor lucrari neconforme si solutionarea lor prin Dispozitii de Santier;verificarea dosarelor de inregistrari de calitate emise pe timpul executiei si acceptarea arhivarii lor .
    Realizari:
    - Turnul de Reconcentrare D2O
    - Centrala Diessel de Avarie
    - Captuseli epoxidice interior anvelopa reactor 2 si CSAN 2
    - Extindere Bazin Combustibil Uzat
    - Protectii anticorozive- sablari,grunduiri,emailuri(alchidice,epoxidice,
    vinilice,epoxigudron)
    

  • octombrie 1988 - septembrie 2002

    Sef Punct Lucru , CCCF SA-SC G.S.P.T.M. SA Bucuresti

    • Fetești, România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    Responsabilitati:
    - Organizarea lucrarilor pe santier;
    - Verifica planurile de executie si propune solutii constructive pentru rezolvarea neconformitatilor identificate si tehnologii;
    - Studiaza detaliile de proiectare si documentatia tehnica necesara pentru lucrarile de
    constructie;
    - Urmareste executia lucrarilor pe santier din punct de vedere al cantitatii, calitatii, si respectarii termenelor de executie;
    - Intocmeste cartea constructiei;
    - Intocmeste si/sau verifica atasamente, situatiile de lucrari, rapoarte de lucru, procese verbale si orice alta documentatie cu caracter tehnic;
    - Urmareste ca aprovizionarea cu materiale comandate sa se faca la timp si se verifica existenta documentelor de calitate;
    - Isi insuseste si urmareste aplicarea legislatiei, procedurilor si instructiunilor tehnice
    de lucru.
    Realizari:
    -Reabilitare DN1Breaza - Nistoresti- in colaborare cu firma ILBÄU -Austria.
    -Executat 12Km lucrari de terasamente,turnare nisip stabilizat, asfaltare , ziduri de sprijin din beton armat si ciclopian,viaduct din beton armat.
    - Pod Rutier peste Canal Dunare-Marea Neagra la Cernavoda: montaj viaduct si
    
    

  • iulie 1993 - octombrie 1998

    Sef de Lucrare , SC C.N.E. SA CERNAVODA

    • Fetești, România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    Responsabilitati:
    -Planificarea,organizarea, monitorizarea si
    coordonarea activitatilor desfasurate in scopul realizarii proiectului, din punct de vedere al cantitatii, calitatii si respectarii termenelor;
    - Respectarea normelor tehnice;
    - Respectarea normelor de munca
    - Coordonarea activitatilor de urmarirea stadiilor de desfasurare a lucrarilor de executie:
    - Distribuirea sarcinilor in cadrul echipei in functie de rolul si capacitatile fiecarui angajat,pentru a asigura realizarea in timp si la standardele asteptate a obiectivelor echipei;
    - Intocmirea si centralizarea rapoartelor de lucru, pe categorii de lucrari.
    - Intocmirea situatiilor de lucrari si rapoarte de productie;
    - Mentinerea unei bune colaborari cu beneficiarul;
    - Urmarirea in timp si de calitate a constructiilor in conformitate cu proiectul si procedurile tehnice de executie;
    - Evidenta zilnica a personalului din subordine;
    - Intocmirea inregistrarilor de calitate,fise de betonare.
    - Realizari:
    Depozitul Intermediar de Deseuri Radioactive al Unitatii nr.1;Centrala Diessel de alimentare cu energie la avarie a Unitatii nr1 C.N.E; Corp de legatura intre Cladirea Serviciilor Auxiliare Nucleare si Cladirea Integrata a Unitatii nr 2;
    - Liceul de Energetica Nucleara Cernavoda;
    - Atelier de reparatii auto,garaje autobuze si statie alimentare cu carburanti pentru SN Nuclearoelectrica-Cernavoda
    
    

Educatie

  • 1983 - 1987

    Diploma de facultate, - Facultatea de constructii civile,industriale,agrozootehnice

    • București, România

Limbi straine

Engleza
Incepator
Franceza
Incepator
Romana
Nativ
75%
  • Last update: 21.08.2011
  • Reference number: 671

Experience

  • April 2011 - Present

    Engineering, Technical Assistance, RAAN - SITON Magurele ( subcontractor for S.N.Nuclearoelectrica – U3-U4 Project Implementation Division)

    • Fetești, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    -   Construction quality inspections of units U3 and U4 performed at CNE (Cernavoda Nuclear Plant), issue of Non Conformance Reports (N.C.R), solutions to repair them by Site Dispositions(S.D) and assess the cost of repairs.
    

  • November 2007 - March 2010

    Proposals engineering , SC Filip Construct SRL - Monitoring SEAP/Procedures/Request for proposals/Bidding Communication

    • Fetești, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    -Monitoring SEAP/Procedures/Request for proposals/
    Bidding Communication;
    -Technical and financial proposals 
    -Technical and financial proposals in pre-bidding phase;
    -Prepairing Waiver Notes andt Additional order Notes;
    -Quality inspections on every project execution phase;
    -Scheduling, activities monitoring;
    -Activity listing,planning,
     budget;
    

  • April 2007 - April 2008

    Site manager , SC COMINCO SA Bucuresti

    • Fetești, Romania
    • Full time
    • Work domain - Technicians: Construction

    -Organizing works on site;
    -Resource planning, planning activity and scheduling ; 
    -Project implementation,
    -Supervising activity of subordinates;
    -Preparing the papers and production reports.
    -Human resource management
    ( managing ); 
    -Technical plans in site validation, proposals for reworking the plans to in 
    according to the in site realities.
    -Check the execution drawings and propose solutions to resolve non-conformities  
    identified and construction
    technologies;
    -To respect Quality Assurance ;
    -Check  the supply of  materials ordered to be timely and existence quality documents ;
    -Prepare and / or check attachments, work situations, work reports, 
    records and  any other documentation with technical character;
    -Elaborates the History Records ( H.R );
    -Communications management, activity reporting; Communication to the manager of the progress report;
    -Validating execution plans (in order to oorelate to in site conditions, choosing the 
    proper technologies);
    -Ensuring proper logistic-maintaining a fluent flow of orders for materials &
    supplies ;
    -Assumes and monitors the implementation of laws, procedures and technical 
    work instructions.
    -Planning the re-working activities,  associate resources, materials technology and supplies.
    Cost estimation;
    

  • September 2002 - April 2007

    Civil Quality Supervisor, National Society ”Nuclearelectrica”(SNN) - CNE Invest Cernavoda Branch

    • Fetești, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    -Supervision and control verification activities of the divisions of the firms contracted by the CTC-NPP platform with the object of activity performance 
    of reinforced concrete structural elements,
    performance waterproofing, 
    interior partitions,  achievement decontaminated epoxy liners, sealing  with polysulphide sealants, finishing and corrosion protection.
    -Control in stationary points or assistance required from the beneficiary quality
    checking records issued during the execution of the work confirm the 
    point tive work and the progress payment approval checking execution plans 
    to update the final status of the land issuing of  Nonconformance Reports
    ( N.C.R.) in the case of observation of their work and solve the inconsistent
    provisions of the contract; the records of records issued during  the 
    execution quality and  acceptance archiving their.
     Achievements:
    -D2O Tower Unit 2
    -Central Emergency-Diessel Unit 2
    -Epoxy liners inside the reactor and  CSAN Unit 2
    -Spent Fuel Pool Expansion Unit 2
    
    

  • October 1988 - September 2002

    Site Supervisor , CCCF SA-SC G.S.P.T.M. SA Bucuresti

    • Fetești, Romania
    • Full time
    • Work domain - Technicians: Construction

    -Check the execution drawings  and propose solutions to resolve non- 
    conformities  identified and construction technologies;
    -Studies design details and technical documentation
    needed for construction;
    -Checks the supply of  materials ordered to be timely and existence quality documents ;
    -Prepare and / or check attachments, work situations, work reports, 
    records and  any other documentation with technical character;
    -Elaborates the History Records ( H.R );
    -Site planning and organizing, Activity planning, and monitoring, project time scheduling; 
    
    Achievements:
    -Bridge over Danube-Black Sea Channel (Cernavoda)
    -Restoration of DN1 road Campina-Nistoresti.
    
    

  • July 1993 - October 1998

    Assistance site manager, SC C.N.E. SA CERNAVODA

    • Fetești, Romania
    • Full time
    • Work domain - Technicians: Construction

    -Site planning and organizing, activity planning, and monitoring, project time scheduling; 
    -Monitoring the project components functionality; 
    -Defining, planning and implementing the project informational, communication and 
    reporting system. 
    -Project scheduling; 
    -Project staffing and human resources allocation 
    -Supervising the personell activities;  
    -Project communication management,
    -Checking the project execution. 
    -Planning, organizing, monitoring and co-ordinating activities 
    -Complying to sectorial work regulations;
    -Elaborates the History Records ( H.R );
    -Inventory control; 
    -Communications and reporting; 
    -Quality control.
                               Achievements:
    -   Wastewater pipelines network str.9 Mai Cernavoda
    -   Radioactive wastes warehouse for Unit no.1;
    -   Central Emergency-Diessel Unit 1
    -   Tresspassing between Auxiliary Services Building and si Main Unit  no.2 
        Building;
    -   Nuclear Energy Technical School Cernavoda;
    -   Reparations workshop, gas filling station for S.N. Nuclearelectrica-Cernavoda
    

  • August 1987 - July 1992

    Site Supervisor, IACM Ialomita – Fetesti Site

    • Fetești, Romania
    • Full time
    • Work domain - Technicians: Construction

    -Scheduling, activities supervising; 
    -Site planning 
    -Elaborates the History Records ( H.R );
    -Communication and reporting..
    -Quality control.
    
    Achievements:
    -Industrial warehouse;
    -Residential buildings (224 Ap.).
      
    

Education

  • 1983 - 1987

    Bachelor's degree, Civil and Industrial Engineering Institute

    • București, Romania

Foreign languages

English
Beginner
French
Beginner
Romanian
Native