72418

Railways, Road&Bridges Engineer -Responsible Engineer Quality Assurance la VEGA 93 Galati. Trading Company SRL Galati

  • România, Filiași
  • România, Filiași
  • Romania, Filiași
  • Romania, Filiași
Deblocheaza date contact
Traduceri ale CV-ului
60%
  • Ultima actualizare: 29.03.2015
  • Numar referinta: 72418

Experienta

  • februarie 2014 - Prezent

    Railways, Road&Bridges Engineer -Responsible Engineer Quality Assurance, VEGA 93 Galati. Trading Company SRL Galati

    • Iași, România
    • Full time
    • Domeniu - Inginerie: Calitate,Constructii

    Design and Construction Construction runways Iasi.
    Execution of earthwork,  lay the foundation of ballast and ballast stabilized with special hydraulic binders, Construction of bituminous flexible structure to 2.4 km runway and taxiway and building concrete platform with sliding formwork car,  drawing execution details.
    check external documents:
    Project Execution:
    - If verified by inspectors certified design specialists;
    - If the plan includes decisive phase control;
    - If you include all the parameters of quality checks;
    - If it includes documents prepared by providers of product quality (quality certificates, technical agreements, technical certificates, etc.)
    verifies and approves internal documents prepared for the work that has been designated:
    - Quality of the work plan;
    - Technical execution procedures applicable;
    - The organization of the works (graphical execution plan site organization, graphic insurance workforce and equipment);
    - Chip manufacturing technology;
    - Protocols necessary for the execution of the work: reception quality records, minutes of hidden works etc.
    - Ensure the acquisition and appropriation of technical documentation, the applicable contract or project;
    - Participate in determining optimum technological solution of the works according to the level of quality that have made the requisite degree of complexity and technical difficulty of the project execution, technical equipment and professional material by the company.
    - Develop a plan to control its execution of the work, which will be approved by the Director General;
    participate in further work authorization decisive phase and sign this protocol;
    -Convened factors that should participate in the work in Phase Determinants of execution, completion and preparation of the necessary conditions for the day of their documents in order to obtain agreement ISC further local paper;
    -Take part in all phases of construction Determined imposed by the Inspectorate and sign Minutes decisive phase;
    -Coordinates the reporting of state control bodies;
    - Stops the execution of construction where there were serious quality defects or deviations from procedures for direct execution by checking the findings or complaints of persons authorized to carry out (designer, customer, CTC);
    -Analyze ballots received from the laboratory testing;
    -Stops further execution of the works with products that have found their storage nonconformities and nonconformities to solve
    
    participation in management meetings to improve the quality of corporate quality, coordination and verification laboratory construction activities, the unauthorized laboratory testing, the proposed laboratory for testing, the controls provided in quality control plans, ensuring compliance plan stipulation quality legislation and technical regulations in force, proposal drafting new documents, developing, updating, distribution, document management system for integrated management, participation in inspections carried out by representatives of state control bodies, control over the manner in which the reception quality of the materials received from suppliers, control systematically the objectives, execution phases that determine the quality of works according to the quality control, supervise the preparation of documents relating to the quality of works (compiling module building techniques, how to draw up plans integrated management system, method of preparation of documents for authorization and approval).

  • iulie 2013 - decembrie 2013

    Railways, Road&Bridges Engineer - Manager & Quality Control Assurance (roads&bridges), CT SRL BUCURESTI/CF IASI SA Trading Company SRL Bucharest

    • Iași, România
    • Full time
    • Domeniu - Inginerie: Calitate,Constructii

    Design and Construction Developing east-west axis, the city of Iasi
    Road Upgrading Pacurari Pacurari Street (DN24), Independence Avenue, Sarariei street, street Elena Lady (Bituminous coatings AB2a bedding, BADPC25a, MASF16a, BA16a), building-level passage reinforced concrete superstructure of prestressed beams type "dwarf" elevation of resting on molded walls, poured monolithic execution pavements, street tram line modernization Ms. Elena..
    participation in management meetings to improve the quality of corporate quality, coordination and verification laboratory construction activities, the unauthorized laboratory testing, the proposed laboratory for testing, the controls provided in quality control plans, ensuring compliance plan stipulation quality legislation and technical regulations in force, proposal drafting new documents, developing, updating, distribution, document management system for integrated management, participation in inspections carried out by representatives of state control bodies, control over the manner in which the reception quality of the materials received from suppliers, control systematically the objectives, execution phases that determine the quality of works according to the quality control, supervise the preparation of documents relating to the quality of works (compiling module building techniques, how to draw up plans integrated management system, method of preparation of documents for authorization and approval).

Aptitudini

  • Capacitate de a munci in echipa
  • Spirit practic

Limbi straine

Engleza
Mediu
Franceza
Incepator
Romana
Nativ

Distinctii

Certificari
Project Manager (Estimation resources, resource identification and development of programs for projects, Project Development - Study design, development needs and necessities, SWOT, PEST, budget, resource analysis Gantt, Pert, developing project proposals, business plan cachflow, project implementation by FIDIC, etc.-Specify managements contracts, project team management, implemtarii management, performance of contracts, management contracts)
ISC (Re)Certified as Technical Manager with quality, Roads and Bridges, tunnels and tracks
Authorized by the Ministry of Regional Development and Tourism for Technical Execution, II.1 + II.2 +II.3 areas (roads,  bridges and aviation runways)
Initiation course in using computers PC: OS: MS-DOS, Windows, Databases, officiate, (Excel, Word, etc.), AutoCAD, Project
MS-DOS; WIndous NT; 2000; Profesional System; 7 Ultimate; Northon Commander; Total Commander
MS Office(Excel, Word, Project, Outlook; Acces, InfoPath; PowerPoint; Publisher); AutoCAD; MathCAD, AutoCAD Civil3D, ARD, Robot
Ongoing internal audit of quality management systems, with Mr. Dr. eng
Emil Ciobanu recorded chief auditor TÜV CERT, ARNA, DGQ certificate, EOQ
85%
  • Last update: 29.03.2015
  • Reference number: 72418

Experience

  • February 2012 - January 2013

    Railways, Road&Bridges Engineer -Responsible Engineer Quality Assurance& Technical Execution II(roads&bridges), ROMSTRADE. Trading Company SRL Bucharest

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Execution of earthwork, construction of culverts of corrugated board,; lay the foundation of ballast and ballast stabilized with cement in situ using complex equipment, WR4200 recycler. , Execution of anrombat bituminous layer II storm water drain works in situ, erection drilled concrete columns, L20m the passage over the highway, drawing execution details
    check external documents:
    Project Execution:
    - If verified by inspectors certified design specialists;
    - If the plan includes decisive phase control;
    - If you include all the parameters of quality checks;
    - If it includes documents prepared by providers of product quality (quality certificates, technical agreements, technical certificates, etc.)
    verifies and approves internal documents prepared for the work that has been designated:
    - Quality of the work plan;
    - Technical execution procedures applicable;
    - The organization of the works (graphical execution plan site organization, graphic insurance workforce and equipment);
    - Chip manufacturing technology;
    - Protocols necessary for the execution of the work: reception quality records, minutes of hidden works etc.
    - Ensure the acquisition and appropriation of technical documentation, the applicable contract or project;
    - Participate in determining optimum technological solution of the works according to the level of quality that have made the requisite degree of complexity and technical difficulty of the project execution, technical equipment and professional material by the company.
    - Develop a plan to control its execution of the work, which will be approved by the Director General;
    participate in further work authorization decisive phase and sign this protocol;
    -Convened factors that should participate in the work in Phase Determinants of execution, completion and preparation of the necessary conditions for the day of their documents in order to obtain agreement ISC further local paper;
    -Take part in all phases of construction Determined imposed by the Inspectorate and sign Minutes decisive phase;
    -Coordinates the reporting of state control bodies;
    - Stops the execution of construction where there were serious quality defects or deviations from procedures for direct execution by checking the findings or complaints of persons authorized to carry out (designer, customer, CTC);
    -Analyze ballots received from the laboratory testing;
    -Stops further execution of the works with products that have found their storage nonconformities and nonconformities to solve
    
    participation in management meetings to improve the quality of corporate quality, coordination and verification laboratory construction activities, the unauthorized laboratory testing, the proposed laboratory for testing, the controls provided in quality control plans, ensuring compliance plan stipulation quality legislation and technical regulations in force, proposal drafting new documents, developing, updating, distribution, document management system for integrated management, participation in inspections carried out by representatives of state control bodies, control over the manner in which the reception quality of the materials received from suppliers, control systematically the objectives, execution phases that determine the quality of works according to the quality control, supervise the preparation of documents relating to the quality of works (compiling module building techniques, how to draw up plans integrated management system, method of preparation of documents for authorization and approval).
    

  • August 2011 - December 2011

    Railways, Road&Bridges Engineer group chief engineer bridges, PA & CO International Trading Company SRL Bacau

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Workstation management entrusted to Bridges
    Analyze and check the documentation at the site for construction works do observations for the effective exercise of the workplace.
    - Request the appropriate committees to land;
    - Drawing books attachment for workstations (daily, weekly).
    - Follow the progress of the works and the issues raised by the production process;
    - Prepare technical compartment together with order forms / waiver for the site.
    - Analyze technical consumption if it was made according to the regulations in force, compared with provisions of the estimate.
    - Responsible for achieving production program within the time stipulated in the contract, each job organizing and preparing the conditions for the execution of works, organizing supplies on each job raw materials and semi-finished products and providing drawings, technical sheets and other documentation technical as well as tools, devices and equipment required for performance measurement and control and verification work.
    - Responsible for full use of production capacities, use of equipment with maximum efficiency, preventing and eliminating disruptions or inefficiencies in their operation.
    - Provide fair and reasonable allocation of workers to jobs, work distribution according to qualification of workers and to support the introduction of new techniques to the workers.
    - Responsible for the quality of work performed and must prevent scrap to achieve normal production cost savings through rational use of materials, the avoidance of unproductive expenditures and the organization of production according to established technological process.
    - Responsible for use as full and as productive working day to all workers that he is in charge, must be fought by workers absence from work and take concrete measures to remedy these shortcomings.
    - Has the right to take disciplinary action in accordance with internal regulations against those who violate labor discipline and safety standards, environmental, occupational health or emergency situations.
    - Face closing month (consumption vouchers, NIR, travel orders, inventory) and forward it to the accounting department.
    - Performs daily and periodic training to all his staff taking and record sheets.
    - Participate in committees and disposal inventory management data based decision
    

  • February 2011 - July 2011

    Chief Engineer Road&Bridges lot roads Technical Execution II, IASICON Trading Company SA Iassy

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Coordination outlets road within the site Recreation Area Ciric Iasi (earthworks, foundations ballast clothing manufacturing cement concrete, cast in situ, bank revetments of gabions, clothing bituminous apparel bituminouse lightweight ) Technical Execution for Modernization Common County Roads Hangu, Piatra Neamt county (earthworks, foundations macadan gobble, manufacturing clothing apparel bituminouse lightweight prefabricated culverts works)
    check internal and external documents on line quality technical execution procedures applicable;
    - The organization of the works (graphical execution plan site organization, graphic insurance workforce and equipment);
    - Chip manufacturing technology;
    - Protocols necessary for the execution of the work: reception quality records, minutes of hidden works etc.
    - Request the appropriate committees to land;
    - Drawing books attachment for workstations (daily, weekly).
    - Follow the progress of the works and the issues raised by the production process;
    - Prepare technical compartment together with order forms / waiver for the site.
    - Analyze technical consumption if it was made according to the regulations in force, compared with provisions of the estimate.
    - Responsible for achieving production program within the time stipulated in the contract, each job organizing and preparing the conditions for the execution of works, organizing supplies on each job raw materials and semi-finished products and providing drawings, technical sheets and other documentation technical as well as tools, devices and equipment required for performance measurement and control and verification work.
    - Responsible for full use of production capacities, use of equipment with maximum efficiency, preventing and eliminating disruptions or inefficiencies in their operation.,
    for technical achievement - economic
    -developing economic solutions, technical and technological
    -monthly statements and supporting papers to recipient
    -regular visits on site for verification and monitoring of execution
    etc.
    

  • July 2009 - August 2010

    Railways, Roads&Bridges Engineer - Designer roads and bridges, ARCADIS companies TGH SA Iassy

    • Filiași, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Design streets Pascani municipality, county Iasi, Sibiu municipality streets, Rehabilitation DJ Ilva Mica, Bistrita county Nasaud - Suceava County border, DC 88 Cocove roads, Bacau county, etc.
    Road and bridge design (design geometry route road structure sizing, sizing elements reszistenţă bank protection wall support of reinforcements concret. Gabions, road signaling design, sizing bridges (resistance and hydraulic) design vertical systematization of projects planning, technical assistance in the execution of the project, preparing written parts of the project (technical memoranda specialists, specifications, Breve computing, etc.) schedule, drawing, design feasibility and feasibility studies, technical bid auction
    

  • June 2008 - July 2009

    Railways, Road&Bridges Responsible Engineer Quality Assurance and Control Road&Bridges, IASICON Trading Company SA Iassy

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Construction Parking and vertical systematization Business Centre Vaslui Construction access road and car parking Neamt Fortress-Neamt Fortress Rehabilitation
    Quality assurance and quality control work stations, internal audits of the Quality Management System at the premises, following completion of the technical, and keeping in touch with external factors (the beneficiary - the specialized project supervisor ISC-ITJ etc.) and internal on impression quality, attending receptions and elaborate qualitative phase measurements corresponding quality work for settlement
    checking of raw materials, semi-finished and finished products in terms of quality (both dimensional and visual)
    - Reporting defects in manufacturing
    - Making quality reports
    - The reporting of noncompliance, within the site
    - Responsible for nonconforming materials are segregated from production flow
    - Found quality problems throughout the production
    - Monitoring the quality of products manufactured and fault analysis
    - Managing, analyzing data, preparing reports and statistics as
    - Setting actions for continuous improvement of processes and products
    - Quality management problems in the relationship with suppliers
    - Quality management and resolution of complaints received from customers
    

  • May 2004 - May 2008

    Railways, Road&Bridges Responsible Engineer Quality Assurance and Control Road&Bridges, Construction companies Railway Iassy - Group Colas SA Iassy

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    DN17 Rehabilitation Contract 4R11 and 4R12 Suceava-Gura Humor& Gura Humor - Sadova, km0 000-80 000; Swerve DN 28 Blagesti - Pascani County. Iaşi Consolidation and Rehabilitation earthworks DN 29 D Stăuceni km. 5 000-7 500 Botosani County, Worcester County Modernisation Suceava municipality; Modernization DJ 291 C Pomîrla km. 13 000-22 000 Botosani, Vaslui Streets Rehabilitation Str, angle, Union, Building verse, Petunia Street, Lascar Luti, Suceava Bridges Rehabilitation in the Community Ipoteşti, Suceava County
    Quality assurance and quality control work stations, internal audits of Quality Management System in the working points, following the completion of the technical, and keeping in touch with external factors (the beneficiary - the project supervisor for specialitateş ISC-ITJ etc.) and internal on impression quality, attending receptions qualitative phase personaluli periodic technical training for each project line technology and quality execution (after SR EN ISO 9000 and 14000) [tracking quality products and processed materials and unprocessed gravel, aggregate production plants for roads and bridges. cement and concrete mixing plants asphalt mixtures, stabilized with cement ballast
    Inspection of raw materials, semi-finished products and checking documents attest and certify the quality of products supplied and manufactured.
    Conducting random inspections and quality control on all products and equipment manufactured and supplied in accordance with approved plans and procedures and control of the storage, preservation, packaging and shipping them.
    The suitability documentary in production / quality at the workstation.
    Checks during production, and record any deficiencies or gaps.
    Detection, monitoring and tracking of cases nonconformities, defects and complaints received and propose corrections, corrective and preventive actions for their elimination final.
    Checking the quality of the works according to plan.
    Drafting and signing according to procedures approved quality plans and compiling the technical file of the product based on documentation prepared and received from departments that work. and to file for approval of ballast concrete production plants and asphalt mixtures
    Planning quality control inspections.
    Active participation in the learning standards and quality procedures in place and constantly monitoring compliance management system implemented them.
    Adequately manage all documents and records made
    

  • March 2001 - April 2004

    Railways, Road&Bridges Engineer - Head of Working Point, Railway Engineering Trading Company SA Iassy

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    European E 85 Roman Road Rehabilitation - Bacau (executive variant traffic from filling ballast, road system of ballast stabilized with cement foundation, the provisional bridge deck superstructure metallic CF, leaning against a pack of sleepers, over the brook "Black Prîrul" to bridge Secuieni km. 310; Execution indirect Charity BA BA bridge over the brook "Black Stream" to bridge Secuieni km. 310, digging and leveling the road box) Consolidation rehabilitation earthworks and road DN 29 D Stăuceni km. 5 000-7 500 county Botosani (executive elastic imperfect drainage, asphalt lay the foundation of ballast stabilized with cement and ballast, construction precast culverts P2, C2, execution ballast foundation and the box BSC road repaired imbtacaminti bituminous) Modernization County Roads DC Fîntînele, Suceava County (Execution take foundation of ballast, ballast foundation and precast culverts) Modernization County Roads DC Botosani County Common Calarasi (executive penetrated the foundation of ballast gravel, culverts Dalat Reinforcements Concrette)
    Endpoint management entrusted; training of subordinate line work safety and quality execution of works, responsible for the impression quality work, preparation of statements of work, drawing sheets of subordinate staff remuneration agreement, confirmation services firms in subcontracting in the paper, preparation of comparative materials, labor, equipment and transportation, attending receptions quality execution phases, preparation and quality assurance documentation receptions reception quality
    

  • May 2000 - March 2001

    Railways, Road&Bridges Engineer - Head of Working Point, Railway Construction companies "Moldova" Iassy

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Rehabilitation of national road DN 24 Iassy - Sculeni (execution of earthworks and foundation road ballast box)
    Endpoint management entrusted; training of subordinate line work safety and quality execution of works, responsible for the impression quality work, preparation of statements of work, drawing sheets of subordinate staff remuneration agreement, confirmation services firms in subcontracting in the paper, preparation of comparative materials, labor, equipment and transportation, attending receptions quality execution phases, preparation and quality assurance documentation receptions reception quality
    

  • July 1998 - February 2000

    Road&Bridges Technician - Working Head Point, Trading Company for Road Maintenance Works Iassy - SA

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Modernization DJ 282 D Popeşti "" Modernization DJ 281 Podu-Iloaiei - Erbiceni (Execution take ballast foundation and structure of the existing road;) Modernization DC Sculeni - Victoria (repaired pavement and lay IAU) Banu-DC36 paving Dumesti "" DJ 282 D Podu-Iloaiei - Rumanesti "," paving DJ 281 Erbiceni - Spin (execution gravel on the foundation stone ballast ballast foundation executive) Snow Removal county and communal roads, traffic study (coordination activity Review pedestrian and auto traffic and data transmission processing center for county roads)
    Endpoint management entrusted; training of subordinate line work safety and quality execution of works, responsible for the impression quality work, preparation of statements of work, drawing sheets of subordinate staff remuneration agreement, confirmation services firms in subcontracting in the paper, preparation of comparative materials, labor, equipment and transportation, attending receptions quality execution phases, preparation and quality assurance documentation receptions reception quality
    

  • July 1993 - July 1998

    Head band roads and bridges, Autonomous County Road and Bridge Iassy

    • Filiași, Romania
    • Full time
    • Work domain - Technicians: Construction

    Slope and platform consolidation 281B DJ Onesti - Boroşoaia County. Iassy, Building 281B sides and Platforms DJ Onesti - Boroşoaia County. Science (Executive drain elastic imperfectly capture) DJ 281C Repair Blagesti - Todireşti - Stroieşti - Hodora - Cîrjoaia - Cotnari;
    Repair DC 144 DN 28B - Cotnari;
    Repairs DJ 281 Cotnari - Belcesti, 248 D Holboca-Tomeşti "," Repair of the road DJ 282 Breazu - Horleşti - Movileni; (pavement repairs and litter IAU), Modernization DJ 281 Belcesti - Spin (Execution path of concrete slabs cast in situ concrete, the foundation of ballast) Modernization DC 20 Holboca - Orzeni - Ruseni New - Old Ruseni (IAU Repair pavement and bedding, construction precast culverts C2) DJ 282 Breazu Maintenance - Horleşti - Movileni, DC 15, DC 17, DC 18 (Execution treatments simple bituminous asphalt for roads and pistris neparafinos sorted) traffic study (coordination activities auto and pedestrian traffic census and county roads transmission data processing center)
    Endpoint management entrusted; training of subordinate line work safety and quality of execution lucrailor, responsible for caliataea works, preparation of statements of work, drawing sheets of subordinate staff remuneration agreement, confirmation services firms in subcontracting in the paper, preparation of comparative materials, labor, equipment and transportation, attending receptions quality execution phases, preparing and providing quality documentation recptii reception quality
    

Education

  • 1988 - 1996

    Bachelor's degree, University "Gh Asachi" Faculty of Civil Engineering

    • Iași, Romania
  • 1988 - 1996

    Bachelor's degree, University "Gh Asachi" Faculty of Civil Engineering

    • Iași, Romania
  • 1988 - 1996

    Bachelor's degree, University "Gh Asachi" Faculty of Civil Engineering

    • Iași, Romania
  • 1988 - 1996

    Bachelor's degree, University "Gh Asachi" Faculty of Civil Engineering

    • Iași, Romania

Skills

  • Communication skills
  • Ability to work in team
  • Practical spirit

Foreign languages

English
Intermediate
French
Beginner
Romanian
Native