7801

engineer at Arcelik AS, Beko

  • România, Târgoviște
  • România, Târgoviște
  • Romania, Târgoviște
  • Romania, Târgoviște
Deblocheaza date contact
Traduceri ale CV-ului
30%
  • Ultima actualizare: 06.06.2011
  • Numar referinta: 7801

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Avansat
Franceza
Mediu
Italiana
Mediu
Spaniola
Incepator
Romana
Nativ
80%
  • Last update: 06.06.2011
  • Reference number: 7801

Experience

  • July 2004 - Present

    engineer, Arcelik AS, Beko

    • Târgoviște, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    1)	Constructive  Design & Cooling System Engineer (Product Development Department)
    
    -	constructive design for refrigerators and design of cooling systems for refrigerators
    -	January 2004 – first design project: KSS 32
    -	Design for following new refrigerator projects:
    1.	KSS 32, A+ energy class, comby type
    2.	RD 33, double door type
    3.	KSC 32, electronic comby type 
                     - also soft projecting
    4.	KSC 35, electronic comby type
                     - also soft projecting
    5.	K 5270, comby type
    6.	K 5240, comby type
    7.	K 6360, comby type
    8.	K 6360, A+ energy class, comby type
    9.	K 6360, twin compressor, comby type
    10.	K 5250 NF, frost free comby type
    11.	K 6360 ESV, solenoid valve electronic  comby refrigerator
    12.	K6370FNFE, full-no frost electronic control comby refrigerator
    ETC
           -      2006, awarded for “Best Project of the year”
           -      2008, awarded again for “Best Project of the year”
           -      2009, awarded for the project “Energy consumption decreasing for future refrigerators”
    
    
    
    
    Project design stages:
    I.	M1 – analyze, design, calculations
    -	receiving the project definition from Product Management department, Export department or Marketing  department
    -	analyzing the product impact on the client requirements
    -	analyzing the competitor similar product (if necessary) 
    -	calculations: heat gain, ref-sim, etc.
    -	designing the product components 
    -	checking the product components
    II.	M2 – prototypes 
    -	supplying the prototypes necessary materials (with suppliers & purchasing department)
    -	making the prototypes (with production department)
    -	testing the prototypes
    III.	M3 – production trial 1
    -	meetings with production dep, production engineering dep, purchasing department. (trial preparation)
    -	supplying the necessary materials 
    -	making the trial
    -	meeting after the trial (corrective actions)
    -	testing samples from the trial (6 pcs)
    IV.	M4 – production trial 2
    -     meetings with production dep, production engineering dep, purchasing department, quality assurance department. (trial preparation)
    -     supplying the necessary materials 
    -     making the trial
    -     meeting after the trial (corrective actions)
    -     quality assurance testing
    -     testing samples from the trial (8 pcs)
    V.          M5 – serial production
    -    observation on first serial production
    -    observation of the product evolution (production – client) one year time (with Service department analyse)
    
    2)	Noise analyser engineer (2004)
    -	responsible engineer for noise analysing and noise reduction of  refrigerators
    -	2005 – TPM project leader: “Noise reduction for KS 32 comby refrigerator.
    -	Starting September 2005,  Service Call Rate for noise defects decrease 32% due to this project effects
    -	Noise level measurements in anechoic chamber with PULSE, noise analysers, etc.
         3)     EMC – electromagnetic compatibility – test reports analyse engineer 
    -	2006 EMC test reports responsible engineer for refrigerators
    

Education

  • 1999 - 2004

    Bachelor's degree, Industrial Engineering University

    • Târgoviște, Romania

Skills

Driving license
  • B

Foreign languages

English
Advanced
French
Intermediate
Italian
Intermediate
Spanish
Beginner
Romanian
Native