79114

Package Mechanincal Engineer at QAPCO, Mesaeed, Qatar

  • România, Craiova
  • România, Craiova
  • Romania, Craiova
  • Romania, Craiova
Deblocheaza date contact
Traduceri ale CV-ului
25%
  • Ultima actualizare: 17.05.2013
  • Numar referinta: 79114

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Avansat
Italiana
Mediu
Rusa
Mediu
Romana
Nativ
75%
  • Last update: 17.05.2013
  • Reference number: 79114

Experience

  • May 2012 - January 2013

    Package Mechanincal Engineer, QAPCO, Mesaeed, Qatar

    • Craiova, Romania
    • Full time
    • Work domain - Finance: Management

    Responsibilities: I checked and commented the TBE documents of project related to mechanical package equipments.
    I performed vetting of Vendor Mechanical Data Sheets and Equipment Requisition for Purchase Order received from EPC Contractor. I was the first liaison with EPC Engineering Management (IHI Japan and CTCI Taiwan) for technical issues in case of pumps, compressors, generators, hoisting systems, burners qualifications test, heat exchangers packages for de-bottlenecking of the existing plant phase (New Ethylene storage capacity and replacement of the existing furnaces with new type one)  
    Replacing the Mechanical Static Engineer during his leave I performed the vetting of the detail design documents (drawings and calculations) of Ethylene Tank. 

  • October 2010 - February 2012

    QC Manager, Oficina Metalmeccanice Generali, Stongoli, Italy

    • Craiova, Romania
    • Full time
    • Work domain - Engineering: Energy / Extractive Industries,Industries / Production / Manufacturing

    Responsibilities: Develop Quality Resource organizational plans and track the QC deparment budget; Develop, Review, Maintain and Manage the construction Quality Inspection Plan, Quality Plans, Erection Sequences, QA/ QC procedures, management of NCR (Engineering solution proposal and monitoring), WPS, PQR, Welder List, Equipment List, equipment calibrations, material and welds traceability, dimensional check up to as built documentation and final dossier; Participate/ Conduct internal audits and monitors thru inspectors the site activity; Attend kick off meeting with Client to ensure Quality objectives are addressed; Provide to Planning and Cost Control Department the project progress data, based on release certificates; Perform (pre) commissioning activities witnessed by the client. 
    Projects: Kizomba Jackets, Usan Jackets, West Franklin Jacket for TOTAL, Static Equipments fabrication for Khabarovsk Refinery, Russia, Jasmine Jacket for Connoco Philips.

  • November 2008 - October 2010

    Piping Engineer, Litwin, Ploiesti, Romania

    • Craiova, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Responsibilities: Provide piping engineering services (line lists, piping routing, slopes, classes, specifications, material take off, general arrangements, isometrics, design review, 3D model review, Quality and Inspections Plans, aso.) relative to various projects; Review the P&ID according piping classes specifications; Provide cost estimates and planning for bid in new engineering projects; Monitor, prepare progress reports, man-hours/ software costs to the management.
    Projects:DVU - Sinclair, Tulsa Refinery, USA, DVU- Tesoro Refinery, USA (both in JV with Mustang Engineering, Rehabilitation of Homs Refinery Syria estimates (a JV with Saipem, Italy), Ma’aden Wet Acid Phosphoric Plant, SABIC, KSA, Petrotel LukOIL LNG – spherical LNG tank farm upgrade, Escravos GasTo Liquid Plant- Chevron (Combined Cycle Power Plant and Demineralization plant), aso.

  • October 2007 - October 2008

    QC Manager, Oficina Metalmeccanice Generali, Stongoli, Italy

    • Craiova, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Responsibilities: Develop Quality Resource organizational plans and track the budget; Develop, Review, Maintain and Manage the construction Quality Inspection Plan, Quality Plans, Erection Sequences, QA/ QC procedures, management of NCR (Engineering solution proposal and monitoring), WPS, PQR, Welder List, Equipment List, equipment calibrations, material and welds traceability, dimensional check up to as built documentation and final dossier; Participate/ Conduct internal audits and monitors thru inspectors the site activity; 
    Attend kick off meeting with Client to ensure Quality objectives are addressed; Record the project progress data, based on release certificates; Perform (pre) commissioning activities witnessed by the client; Liaison with Engineering Dept. Intermare Sarda Office in order to provide the shop drawings in time and as per erection sequence in order to achieve the Cost Time and Resources projects parameters. 
    Projects: Olowi Decks (4 decks for Olowi Field development Canadian Natural Resources) and Scarabeo 8 (ENI)

  • July 2004 - October 2007

    Project Manager , Dextron ltd, UK

    • Craiova, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Responsibilities: Projects Management in FEED and Detail Design engineering activities (planning, cost control, vetting, claims, invoices, aso.) to employee development and field engineering support supply of manpower; Prepare: projects milestones, review equipment performances analisys, layouts of equipments and piping, methods of statement, cost estimates into the FEED projects for TBD; Prepare Projects Progress Reports to the General Manager and the board; Liaison with Clients Representatives in order to fulfill their specific demands as prime contact technical, contractual and comercial, tender invitation and technical specifications, proposed method of erections. Act as Client advisor into the bid stage; Liaison with manufacturing plants in comercial, quality and planning issues; with shipping, international heavy lifting equipments supliers, construction, and other services companies in order to reduce the shipping and erection defects and costs, planning of erection based on equipments manufacturer calender.
    Projects: Chevron Escravos Tank Farm Rehabilitation, De-sulphur Unit Petrotel LukOIL and OMV Romania upstream stations metering, Eco-Rehabilitation of Romanian Plants - Alimenta Group, Swizerland (Ecological generation of Steam & Electricity by burning seeds skins debris, 4x100MW boiler, 100MW Steam turbine), White Petroleum Products Un(Up)Loading Storage Facility in Lagos (Client Afrinvest London), Rural Communities Electricity Supply in Yemen, FEED - (General Electric leasing of Combine Cycle  Power Plants) in cooperation with UTI Romania (Electrical Grid),
    Alprom Pitesti – Upgrade and rehabilitation of Wilcox Babcock boilers (2x 50MW).

  • July 2001 - June 2004

    Mechanical/ Piping Engineer , Ingenieurgemeinschaft Lässer-Feizlmayr’ Consulting Engineers, Munchen, Germany

    • Craiova, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Responsibilities: included the detail design vetting, as built vetting, procedures vetting according to project specifications. Also, the site supervision, project progress measurements, Work Break Schedule, projects planning, cost analysis and risk analysis were part of my duties. 
    Acting as Piping Engineer in Sohar Salalah Pipeline I analyzed different stages of the project development (1200Km between Saih Rawl and Salalah, 12” and 16”, 22 valve stations, 2 compressors stations and Saih Rawl Tie-in), site inspection, QIP and design approval, pre and commissioning test; ensuring that all third party parts and certifications are in line and delivery/ production/ erection is done as per schedule; in FEED study for Takwa Bay – Lagos Marketers’ Jetty Facility Lagos (Client Uando, Nigeria) I developed four chain-age constructions’ proposed solutions of crossing the Lagos Harbor area between Badagry Channel and Apapa Shoals, Piping Specifications, Classes, Material Take Off, method of constructions, a.s.o. 
    Acting as Piping Engineer I done the vetting for the proposed methods of rehabilitation based on ROW survey data, environmental impact analysis of deposited crude; and life span expectancy of existing P/L (including the J-tube replacement) for Escravos Export Facilities and Escravos Pipeline, analysis of costs of the rehabilitation, planning analysis proposed to the client (NNPC). 
    Acting as Mechanical Engineer I done the vetting of design, erection procedures and (pre) commissioning activities of NNPC New Jetty Takwa Bay, PPMC New Tank Farm Takwa Bay, OSO offshore complex Rehabilitation (gas turbine replacement)
    I was liaison with the Client and Contractors PMT on projects’ specific issues and development

  • June 1999 - July 2001

    QC Engineer/ Welding Engineer, Chrome Consortium, Port Harcourt, Nigeria

    • Craiova, Romania
    • Full time
    • Work domain - Technicians: Service / Installation

    Responsibilities: I prepared WPS, PQR, Welders Qualifications, welders performance records, inspections, aso.) and repair alternative procedures of long lead supplied items found defective; I monitored the site activities and provide the input data to planning department based on equipment released certificates/ to construction department based on “in site found” data.
    Major equipments responsible: CNIM Babcock boilers (4x80MW) repairs, Burkhart Reciprocating Compressors, FCC Reactor, DVU Heater. 

  • October 1997 - May 1999

    Mechanical Rotary Engineer/ Site Manager, Kuwait Shipbuilding & Repairyard Co. S.A.K, Kuwait

    • Craiova, Romania
    • Full time
    • Work domain - Technicians: Service / Installation

    Responsibilities: includes the management of materials, manpower, and equipments for Doha West Power Plant Maintenance (8 x 450MW Boilers and desalination - 60% of Water & Electricity Kuwait production in 1998), Kuwait Oil Company (BS140 Gas Turbine Sealing Repair) and N.A.M.T.Co. Trucks and Cars Facility Rehabilitation, Site Management of operators and supervisors, preparation of reports to the Client (Ministry of Electricity and Water or NAMTCo) regarding: equipment wearing and life expectancy, man-hours expenditures, risk of delays analysis, weekly project progress reports; and reports to the company management (man-hours expenditure, material costs expenditure, equipments usage expenditure, aso.) 

  • August 1992 - October 1997

    QC Engineer / Field Piping Engineer, Monticor S.R.L., Ploiesti, Romania

    • Craiova, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Responsibilities: included issue of Quality Inspections Plan, monitoring of welders performances, WPS, PQR, welders qualifications, various inspections of materials, Heat Treatments records, laboratory tests witnesses, (Pre) Commissioning activities, site support engineering, full records of as built documents up to the issue of final dossier. Also I provide progress reports of projects to the management;  
    I managed and I signed the (pre) commissioning of the following: Rehabilitation of Petrotrans Tank Farm Ploiesti and Buzau (tanks, pump station, metering systems, railway cylinders maintenance workshop, Ploiesti-Brasov pipeline rehabilitation), Turn Around Maintenance of Astra Romana Refinery (Edeleanu spherical tank farm, FCC, DVU Heater, Columns, aso.) , Remat Ploiesti (50MW boiler installation and steam grid distribution)

  • September 1987 - August 1992

    Welding Processing Engineer. , Electromecanica, Ploiesti, Romania

    • Craiova, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Responsibilities: includes QIP, process planning of over 6,000 parts and commissioning activities in order to optimize the costs of materials and manpower; writing of technical specifications; devices detail engineering, aso. 
    I developed of a mark of mar-raging steel filler materials (HT, WPS and PQR development, chemical composition, aso.) studies and PQRs for spot welding of hetero-gen joints (calcium/nickel, silver, aluminum alloys, coppers alloys), cladding procedures to recover crankshafts and HT of harnessed materials. 
    Liaison with Material Suppliers, Sub-contracting plants, ISIM (Romanian IWI Branch) and Authorities for the technical issues and process license approval.

Education

  • 1982 - 1987

    Postdoctorate, "Dunarea de Jos" University, faculty of Mechanics

    • Galați, Romania

Skills

Driving license
  • B

Foreign languages

English
Advanced
Italian
Intermediate
Russian
Intermediate
Romanian
Native