  • noiembrie 2012 - Prezent

    electrician, soltec impianti italia

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Industrii / Productie

               - electrician (lucrez pentru Siemens la aeroportul din Copenhaga )
    Lucrari efectuate:
                                             Instalaţia electrică pentru benzi transportoare de bagaje :
    -	 realizarea podurilor de  cabluri electrice ;
    -	 instalarea si alimentarea panourilor electrice  ;
                                -      montarea si conectarea cablurilor electrice 5G1,5 ; 5G6 ; 5G10 ; 5G16 ; 4G2,5 ;3G2,5 ;3G4 ; 5G1,5 ; 7G1,5 ; 12G1,5 ; 16G1,5 ;
                                -      montarea casetelor de alimentare (multi-punct interconectare 3lnn );
                                -      montarea si conectarea motor starter M200D ;
                                -      conectarea motoarelor electrice SEW eurodrive (movigear dac b );
                                -      executarea legaturilor cablurilor electrice si de semnal in panourile electrice ;
    
                                            Realizarea sistemului AS-Interface :
                                -      montarea in dulapuri a placii UR2 Rack ;
                                -      montarea pe placa UR2 Rack  si conectarea AS-Interface master (Simatic S7-400 )
                                -      montarea cablului AS-Interface cu doua fire ,neecranat , galben pentru transferuri de semnal si acelui negru ,auxiliary pentru alimentarea cu 24V DC ;
                                -      montarea si conectarea sclavilor :  
                                        -  module digitale i/o pentru folosirea in camp (module  k60 , k 45 , k20 ) ;                                                                                                                      
                                       - module analogice i/o pentru folosirea in camp ( k60 ) ;     
                                       - module digitale i/o pentru folosirea in cabinet ( module slimline s22,5 si seria s45 : module f90 si module plate ) ;
                                       - module special digitale cu integrarea solutiilor ;
                                       - instalarea si conectarea modulelor AS-Interface carcasa (dispositive distribuite de control seria 3sb3 );
                                       - montarea si conectarea coloanelor de semnalizare ;   
                                       - conectarea comutatorului de proximitate si a releelor contactor ;       
                                       - montarea si conectarea modulelor E70200 PAAS ,FC distribuitor, a senzorilor fotoelectrici cu amplificatory incorporate ;
    	  - montarea comutatoarelor de pozitie ; 
    	  - montarea si conectarea encoderelor , a cititoarelor de pozitie , a limitatorilor de cursa ;
    	  - instalarea si conectarea butoanelor de oprire in situatii de urgenta ;
    	  - montarea conectorilor prelungitor ;
    	  - realizarea conectarii AS-Interface prin intermediul conectorilor m12 ;
    	  - setarea adresei AS-Interface .
    	Realizarea sistemului Profibus :
    	 - montarea controlelor logice programabile : 
    	     - montare placii UR2 Rack ;(element de montare pentru S7-400) ;
    	     - montarea si alimentarea sursei de tensiune (PS407) ,a unitatii central de procesare (CPU 414 F-3 PN/DP) , procesorului de comunicatii (CP443 ) ,module de intrari (DI421) , module de iesiri (DO422 ) ;
    	 -  montarea si conectarea ET200 M si DP/AS-I Link Advanced ;
    	 -  montarea si alimentarea OLM-urilor (modulul optic link ) ;
    	 -  monarea si alimentarea RS 485 Repetor ( amplificator pentru semnalele de date ) ;
    	 -  montarea si conectarea DP/DP Coupler si Y Coupler ;  
    	 -  montarea cablurilor Profibus si conectarea lor prin conectori canbus ;
    	 -  montarea si conectarea cablurilor de fibra optica la OLM-uri ;
    
    
    
    

  • iunie 2012 - octombrie 2012

    electrician, Job Timmes International

    • Onești, România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

                 electrician  ( am lucrat pentru GMB –Italia la noul terminal al aeroportului Henry        Coanda –Bucuresti ) ;
    Lucrari effectuate :       Instalatia electrica pentru benzi transportoare de bagaje .
                                    -  montarea podurilor de cabluri electrice ;
    	     -  instalarea si alimentarea panourilor electrice ; 
    	     -  montarea si conectarea cablurilor electrice 5G16 , 5G10 , 5G6 ,5G1,5 ,4G 2,5 , 3G4 , 3G2,5 , 5G1,5 , 7G1,5 ;
    	      -  montarea cablurilor plate de alimentare 7G2,5 (sistem podis) ;
                                     -  montarea terminalelor pentru cablul plat (sistem podis ) ; 
                                     -  montarea modulelor de racordare 7 poli (sistem podis) ;	
                                     -  efectuarea legaturilor cablurilor electrice si de semnal in panourile electrice ;	
    	              -  montarea si conectarea invertoarelor G110D ; 
    	-  montarea si conectarea motor starter M200D ;
    	-  efectuarea conexiunilor la motoarele electrice sew ;
    	Realizarea sistemului AS-Interface :
    	-  montarea cablurilor AS-Interface galben pentru transferuri de semnal si a celui negru auxiliary pentru alimentarea cu 24vdc ;
    	-  montarea si conectarea modulelor E70200 PAAS ,FC distribuitor ;
    	-  instalarea si conectarea senzorilor fotoelectrici PRK46B (leuze electronic);
    	-  instalarea si conectarea butoanelor de oprire in situatii de urgenta ;
    	-  montarea si conectarea encoderelor , a limitatorilor de cursa ; 
    	-  montarea si alimentarea coloanelor de semnalizare ;
    	-  montarea conectorilor prelungitor ;
    	-  realizarea conectarii AS-Interface prin intermediul conectorilor m12 ( mama si tata ) ; 
    	-  montarea si efectuarea conexiunilor la casetele de seranda si checking ;
    	-  montarea si conectarea display-urilor , cantarelor si pedala ;
    	-  montarea cablurilor Profibus si Profinet .
    
    
    

  • mai 2011 - mai 2012

    electrician, Techimp Impianti Italia

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Industrii / Productie

    :           electrician – punct de lucru rafinaria din Elefsis- Hellenic Petroleum  Grecia ;
    Lucrari efectuate :    -  coordonarea echipei de montat cabluri electrice ;
    	-   realizarea conexiunilor la motoarele electrice (stea si triunghi ) ;
    	-  conectarea cablurilor electrice in panourile din statiile electrice si camp ;
    	-  montarea podurilor de cabluri electrice si de instrumentatie ;
    	-  instalarea panourilor electrice de iluminat distributie si a celor de instrumentatie ;
    	-  conectarea cablurilor electrice pentru iluminat in panourile de distributie si doze ;
    	-  realizarea instalatiei de impamantare : montarea prizelor de impamantare ,montarea cablurilor de impamantare , realizarea conexiunilor cablurilor de impamantare la echipamentele electrice si la structura metalica ;
    	 -  montarea cablurilor de comanda si conectarea acestora ;
    	 -  montarea dulapurilor electrice in statiile electrice ;
    	 -  montarea bateriilor pentru UPS ;
    
    
    
    
    
    
    
    
    
    
    
    
    
    

  • februarie 2010 - aprilie 2011

    electrician, Techimp Impianti Italia

    • Onești, România
    • Full time
    • Domeniu - Inginerie: Industrii / Productie

    :   electrician – punct de lucru rafinaria Neste Oil –Rotterdam Olanda ;
    Lucrari effectuate :      Realizarea instalatiei de impamantare :                                                                        
    	-  montarea cablurilor de impamantare ;
    	-  montarea electrozilor de impamantare si realizarea prizelor de pamant ;
    	-  imbinarea cablurilor de impamantare prin sudura exoterma ;
    	-  montarea barelor colectoare de impamantare ; 
    	-  conectarea la instalatia de impamantare a echipamentului electric si a structure metalice ;
    	-  realizarea instalatiei de impamantare in statiile electrice si conectarea echipamentului la barele colectoare ; 
    	 -  montarea cablurilor de iluminat si conectarea acestora la panourile de distributie si doze ;
    	-  montarea panourilor de protective catodica ,a casetelor de jonctiune si a puncelor de testare ;
    	-  realizarea conexiunilor in panourile de protective catodica ,cutii de jonctiune sipunctelor de testare ;
    	-  conectarea motoarelor electrice in stea si triunghi ;
    	-  realizarea si montarea podurilor de cabluri electrice ;
    	-  instalarea heat-tracing . 
    
    
    
    

  • ianuarie 2006 - ianuarie 2010

    electrician, Instalatii sa

    • Onești, România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    	
    Lucrari effectuate :  Realizarea instalatiilor electrice interioare si de forta :
    	-  realizarea instalatiilor electrice sub tencuiala , aparente si sub rigips :
    	   -  trasarea pe perete a locului viitoarei instalatii electrice cu stabilirea locului intrerupatoarelor , prizelor , dozelor de ramificatie ;
    	   -  executarea trecerilor prin pereti , realizarea coturilor din pvc ;
    	   -  realizarea canalelor pentru circuite si a locurilor pentru dozele de ramificatie si apart ;
    	   -  montarea sectiunilor de tub cu conductoarele introduce, a dozelor si fixarea lor ;
    	   -  realizarea legaturilor in doze ;
    	   -  montarea aparatelor si receptoarelor : intrerupatoare , prize , corpuri de iluminat ,tablou general ;
    	    
    	    -  realizarea gaurilor circulare cu diametrul egal cu cel al dozelor pentru rigips ;
    	    -  montarea cablurilor electrice sub scheletul de sustinere al placilor din rigips ;
    	    -  punerea sub tensiune a instalatiei electrice ;                                                                                
                                   Realizarea instalatiei de paratraznet :
    	-  montarea tijei de captare /impamantare ;
    	-  montarea suportului pentru tija ;
    	-  montarea dispozitivelor izolante de prindere : tija izolanta , piese de legatura T , piese de record , piese de capat , varf de paratraznet ;
    	-  montarea suporturilor conductor , a pieselor de dilatatie  , a bridelor pentru jgheaburi ;
    	-  montarea platbandului , a pieselor de legatura pentru platband ;
    	-  montarea electrodului de impamantare si a bridelor de fixare universal pentru impamantare ;
    
    
    

Educatie

  • 1989 - 1993

    Liceu / scoala profesionala, liceul Dimitrie Cantemir

    • Onești, România

Aptitudini

Permis de conducere
  • B
  • Capacitate de a munci in echipa
  • Spirit practic
  • Flexibilitate si adaptabilitate

Limbi straine

Engleza
Mediu
Italiana
Mediu
Romana
Nativ
85%
  • Last update: 31.12.2015
  • Reference number: 85291

Experience

  • November 2012 - Present

    electrical, NAN impianti electrici Italy

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    - Electrical – project : Heavy residue process complex – first phase  -
                                                         Lukoil Neftochim Burgas Bulgaria
     stations and substations and instrumentations :
    -	Installation of electrical and instrumentation panels ;
    -	Interconnection cables and mounting coupling in instrumentation panels ;
    -	Identification of electric cables and check the insulation resistance and the 
    Megger continuity ;
    -	Installation of electric cables for power supply and connecting them in panels ;
    -	Identification and verification of instrumentation cable continuity ;
    -	The preparation of terminal cables instrumentation section various : 
    1x2x1,5 ; 1x2x2,5 ; 6x2x0,75 ; 6x3x1,5 ; 12x2x0,75 ; 12x2x2,5 ; 12x3x1,5 ;12x2xAWG ;
    -	Connecting cables for instrumentation in Honeywell and Rittal  panels of  
    various types : dcs system cabinet ; esc system cabinet ; f&g marshaling cabinet ; mms system
    cabinet ; power distribution ;
    -	Reading plans and tehnical drawings ;
           Works in the field :
    -	Preparation of instrumentation cables terminals ;
    -	The fitting of glands ;
    
    -	Connecting cables for instrumentation in junction boxes ;
    
    -	Connecting  instruments of different types .
    
    

  • February 1915 - Present

    electrical, Techimp Impianti

    • Mochovce, Slovakia
    • Full time
    • Work domain - Technicians: Construction

    Works power stations and instrumentations :
    
    -	Inspection of cables ;
    -	Placing of cables inside of the cabinets ;
    -	Arrangement of the cables in cabinets ;
    -	Connection of cables in cabinets type Siemens T2000 , Areva Teleperm xs; AEG;
    -	Connection junction boxes ;
    -	Connecting instruments of different types :
    -	Connecting electric motors ;

  • November 2012 - January 2014

    electrical, soltec impianti italy

    • Onești, Romania
    • Full time
    • Work domain - Technicians: Construction

    I work for Siemens in the airport of Copenhagen
    Work performed:
                                             Electrical Installation for conveyor belts of baggage :
    -	 Carrying out the wiring bridges ;
    -	 Installation and supply electrical panels ; 
                                - Assembling and connecting electric cables 5G1.5 ; 5G6 ; 5G10 ; 5G16 ; 4G2.5 ; 3G2.5 ; 3G4; 5G1.5 ; 7G1.5 ; 12G1.5 ; 16G1.5 ;
                                - Installing the power boxes (multi-point interconnection 3Lnn );
                                - Assembling and connecting motor starter M200D ;
                                - Connecting electric motors SEW eurodrive (movigear dac b );
                                - The execution links electric cables and electrical panels in the signal;
    
                                            Work on the system AS-Interface:
                                - Installing cabinets to UR2 Rack plate ;
                                - Install  and  connection of AS-Interface master (Simatic S7-400 )
                                - Installing the cable AS-Interface with two wires ,unshielded , yellow for transfers of signal and that black ,auxiliary for power supply to 24V DC ;
                                - Assembling and connecting slaves :  
                                        - Digital modules i/o for use in the field (modules k60 , k 45, k20 ) ;                                                                                                                      
                                       - Analog modules i/o for use in the field ( k60 );     
                                       - Digital modules i/o for use in cabinet ( modules Slim Line s22.5 the series s45 : modules and modules flat f90 );
                                       - Particular digital modules with the integration of solutions.
                                       - The installation and connection modules AS-Interface housing (dispositive series distributed control 3sb3 );
                                       - Assembling and connecting columns signals ;   
                                       - Connecting the proximity switch and the switch relays ;       
                                       - Assembling and connecting modules E70200 PAAS ,FC distributor, of the sensors photoelectric with amplificatory incorporated ;
    	  - Install switches position ; 
    	  - Mounting and connecting encoders  and readers position ;
    	  - The installation and connection stop push buttons in emergency situations.
    	  - Install extension connectors ;
    	  - Carrying out connecting them AS-Interface via m12 connectors.
    	  - Address setting AS-Interface .
    	Work on the system Profibus :
    	     - Install control programmable logic(PLC); 
    	     - UR2 Rack mounting plate; (element of fitting for the S7-400) ;
    	     - Assembling and the supply voltage supply (PS407) ,a central processing unit (CPU 414 F-3 PN/DP) , communication processor (CP443 ) ,input modules (DI421), and output modules (DO422 ) ;
    	    - Assembling and connecting ET200 M and DP/AS-I Link Advanced ;
    	    - Assembling and the OLM (optical module link );
    	    - Mounting and power RS 485 Repeater ( amplifier for the data signals );
    	    - Assembling and connecting DP/DP Coupler and Y Coupler ;  
    	    - Installing Profibus cables and connect them with CAN BUS connectors.
    	    - Assembling and connecting the cables of the fiber optic to OLM-changer.
    
    
    
    

  • June 2012 - October 2012

    electrical, Job Timmes International

    • Onești, Romania
    • Full time
    • Work domain - Technicians: Construction

    :              Electrical (I work for GMB -Italy to the new airport terminal Henry Coanda -Bucharest ) ;
           Electrical installation for conveyor belts of baggage .
                                    - Installing the wiring bridges ;
    	     - The installation and supply electrical panels. 
    	     - Assembling and connecting electric cables 5G16 , 5G10 , 5G6 ,5G1.5 ,4G 2,5 , 3G4 , 3G2.5 , 5G1.5 , 7G1.5 ;
    	      - Installing flat cables supply 7G2.5( system podis) ;
                                     - Install terminals for flat cable( system podis ); 
                                     - Install modules from the connection 7 pole( system podis) ;	
                                     - Carrying out links electric cables and electrical panels in the signal;	
    	              - Assembling and connecting inverters G110D ; 
    	- Assembling and connecting motor starter M200D ;
    	- Making the connections to electric motors SEW ;
    	Work on the system AS-Interface:
    	- Installing cables AS-Interface yellow for transfers of signal and the black auxiliary for power supply 24VDC ;
    	- Assembling and connecting modules E70200 PAAS ,FC dealer ;
    	- The installation and connecting sensors photoelectric PRK46B (leuze electronic);
    	- The installation and connection stop push buttons in emergency situations.
    	- Assembling and connecting encoders ; 
    	- Assembling and the supply columns signals ;
    	- Install extension connectors ;
    	- Carrying out racks AS-Interface via connectors m12 ( mother and father ); 
    	- Assembling and making the connections in damper boxes and checking ;
    	- Assembling and connecting display balance and pedal ;
    	- Installing Profibus and Profinet cables .
    
    
    

  • May 2011 - May 2012

    electrical, Techimp impianti Italy

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

                 Electrical  - the working point oil refinery in Elefsis- Hellenic  Petroleum Greece ;
        - Team coordination to be fitted electrical wiring ;
    	-Making connections to electric motors (star and delta);
    	- Connecting the cables in electrical panels in electrical and field stations.
    	- Installing the wiring bridges and the instrumentation ;
    	- The installation of lighting distribution electrical panels and for instrumentation ;
    	- Connecting electric cables for lighting in panels of distribution and doses ;
    	- The carrying out of the plant ground : fitting outlets the grounding ,fitting the grounding cable, cable connections grounding electrical equipment and the metal structure.
    	 - Installing the control cables and the connection thereof ;
    	 - Installing electrical cabinets in electrical stations.
    	 - Install batteries for UPS ;
    
    
    

  • February 2010 - April 2011

    electrical, Techimp impianti Italy

    • Onești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    :             Electrical - point refinery working Neste Oil -Rotterdam Netherlands ;
          Making the grounding facility :                                                                        
    	- Installing the grounding cable ;
    	- Installing the grounding electrode and the achievement of earth power outlets.
    	- Linking the grounding cables by exothermic welding ;
    	- Installing dirt bars the grounding ; 
    	- Connection to the plant the grounding of electrical equipment and the metal structure.
    	- The carrying out of the plant ground stations in electrical and connect the equipment into the bus bars. 
    	 - Installing cables of lighting and connected to panels of distribution and doses.
    	- Installation of   cathodes  protection panels ,boxes of point  junction and the test ;
    	- Making connection in panels cathodes  ,boxes of junction of the test point ;
    	- Connecting electric motors in star and delta ;
    	- Achieving and fitting the wiring bridges ;
    	- Installing heat-tracing . 
    
    
    
    

  • January 2006 - January 2010

    electrician, Instalatii sa

    • Onești, Romania
    • Full time
    • Work domain - Technicians: Construction

    :                    Making inside electrical installations and power :
    	- Carrying out electrical installations under the plaster , visible and under gypsum :
    	   - Drawing on the wall of the place future electrical installations with determining the place switches , outlets , doses ramification ;
    	   - The execution passes through the walls , the production of polyvinyl elbow ;
    	   - To make channels for circuits and the places for the doses of ramification and apart ;
    	   - Installing sections of the tube with the leads insert doses and fixing them.
    	   - Achieving links in doses ;
    	   - Install appliances and receivers: switches, outlets, lighting   general panel.
    	    
    	    - To carry out circular holes with a diameter equal to the amount of doses for gypsum ;
    	    -  Fitting electric cables under skeleton supporting motherboards of gypsum ;
    	    - The implementation on the voltage in the electrical installation ;                                                                                
                                   Carrying out of the plant lightning rod:
    	- Installing the catchment rod ground ;
    	- Install support for the rod.
    	- Install insulating the clamping devices : insulating rod, parts the link T, parts of the record, parts the end , peak lightning rod ;
    	- Install brackets lead ;
    	- Install cover plate , of the parts to cover plate ;
    	- Installing the grounding electrode and the mounting bracket for grounding universal ;
    
    
    

Education

  • 1989 - 1993

    Highschool, liceul Dimitrie Cantemir

    • Onești, Romania

Skills

Driving license
  • B
  • Ability to work in team
  • Practical spirit
  • Flexibility and adaptability

Foreign languages

English
Intermediate
Italian
Intermediate
Romanian
Native