  • ianuarie 2013 - Prezent

    Inginer sef lot, SC Hidroconstructia SA

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    -depozit zgura si cenuse Rovinari
    -extindere si refacere retele apa si canalizare oras Tg-jiu

  • ianuarie 2007 - ianuarie 2013

    Inginer sef lot AHE Bumbesti - Livezeni, SC HIDROCONSTRUCTIA SA

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    -Betonari Galerie – Front Castel
    -Injectii galerie
    -Betonare conducta fortata
    -Betonare CHE Bumbesti cota ± 0.00
    -Castel echilibru
    -Lucrari edilitare – Canalizare si alimentare cu apa
    -Betonari baraj Balea Paroseni
    

  • ianuarie 2003 - ianuarie 2007

    Inginer sef lot AHE Bumbesti - Livezeni, SC HIDROCONSTRUCTIA SA

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    Excavatii subterane front Bratcu (Sistem perforare – impuscare)
    Sustinere galerie prin torcretare
    Depozite zgura si cenuse Rovinari
    Depozite zgura si cenuse Paroseni

  • ianuarie 1999 - ianuarie 2003

    Inginer sef lot - Constructii Civile, SC HIDROCONSTRUCTIA SA

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    - Scoala Sambotin  
    - Salvamont Ranca 
    - Casa de vacanta Papusa –Ranca   
    - Biserica Bumbesti Jiu
    

  • ianuarie 1995 - ianuarie 2003

    Inginer sef lot - AHE Valea Sadului, SC HIDROCONSTRUCTIA SA

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    -Terasamente CHE Valea Sadului
    -Betonari CHE Valea Sadului
    -Depozite zgura si cenusa Rovinari
    

  • ianuarie 1989 - ianuarie 1995

    Inginer sef punct lucru – AHE Valea Sadului, SC HIDROCONSTRUCTIA SA

    • «Alt oraș», România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    -Terasamente
    -Beteonari
    -Etansari
    

Educatie

  • 2009 - 2009

    Postdoctorat, Ministerul Educatiei Cercetarii si Tineretului

    • București, România
  • 1984 - 1989

    Diploma de facultate, Institutul de Mine Petrosani

    • Petroșani, România

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Mediu
Franceza
Mediu
Romana
Nativ
75%
  • Last update: 08.08.2013
  • Reference number: 85768

Experience

  • January 2013 - Present

    Lead Engineer , SC Hidroconstructia SA

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

    1.	Hydropower Head Race Tunnel(HRT) Project Bumbest-Livezeni: The 180 million euro project is situated along the Jiu river.The project includes a 22 kilometers long and 6 meters diameter head race tunnel that was digged trough different rock types with classic dynamite/perforation system. The concrete lining has been placed in variety of conditions, with temparature ranging from -5.C to 25.C. The run off the river project has 45 meter high concrete dam to divert water to HRT trough one desilting chamber. The plant has twin-unit power generating setup totalling in 87 MW of installed capacity.The watter falls from the supply tunnel trough 250 meters, 150m level difference lined preassure shaft.
    Relevant Work Experience in this project: 
    
    Lead a workers team of 90 peoples for:
    •	Excavation and lining of tail race tunnel:
    -	Drilled 8 kilometers out of 22 long tunnel using perforation/dynamite system and Tamrock drill machine.Rock quality variation: 75%>RQD<25% ; Cycle duties for excavation : surveying, equipment placing, drilling, loading, defuming, lowering equipment & labor.,mucking, rock bolting, shotcreting,shift change.
    -	Tunnel lining with BCH 20/25 concrete applied with Putzmeister pump,
     custom concrete crown forms was used.
    -	Tunnel Grouting
    •	Excavation and reinforced concrete lining of pressure shaft (250 meters long, 150 meters level difference)
    -	Pressure shaft excavation
    -	Pressure shaft concrete forming
    -	Pressure shaft reinforced concrete lining
    -	Complete final reports
    •	Surge tank (circular, 48 meters tall, 12 meters beam)
    -	Preparing surge tank foundation 
    -	Surge tank concrete forming
    -	Surge tank Rebar 
    -	Surge tank structure reinforced with concrete
    -	Complete final reports
    •	Power Plant (87MW Installed power) Roller compacted concrete used(RCC)
    -	Central excavation
    -	Power Plant concrete forming
    -	Power Plant Rebar 
    -	Power Plant structure reinforced with concrete 
    -	Complete final reports
    •	Performing Administrative Activities - Performing day-to-day administrative tasks such as maintaining information files and processing paperwork. 
    -	Excavation reports
    -	Weekly Concrete Report
    -	Field Core Reports
    -	Concrete Test Beam Data
    -	Quality Results and Report 
    -	etc.
    
    2.	 Valea Sadului Hydropower Dam Project: 80 million euro project, 11 MW; Concrete-face rock-fill dam, 640 million m3 capacity.(56x22x320 meters (HxWxL)
     Relevant Work Experience in this project:
    •	Preparing dam foundation
    -	Foundation excavation
    -	Foundation rebar
    -	Foundation concrete forming
    -	Foundation concreting
    •	Dam ramp consolidation
    •	Dam Overflowing Spillway and control gate rebar and concreting
    •	Embankment fill and in depth consolidation
    •	Dam water intake towers rebar and concreting
    •	Dam Tailrace rebar and concreting.
    •	Performing Administrative Activities - Performing day-to-day administrative tasks such as maintaining information files and processing paperwork.
    3.	Baleia Paroseni double-arch concrete retaining dam (72 meters tall, 24 meter width at base, and 4 meters width at crest of wave)
    Relevant Work Experience in this project:
    •	Dam concrete forming with Perri panels
    •	Dam concretings BCH 20/25, with tower cranes MTO, the concrete was transported from local factory with cars.
    •	Performing Administrative Activities - Performing day-to-day administrative tasks such as maintaining information files and processing paperwork.
    
    4.	Ashes and coal combustion residues deposit for thermal power plant Rovinari: 600.000 euro project:
                Relevant Work Experience in this project:
    •	Prepare landfill for coal combustion residue where it can be disposed
    5.	Urban improvement work Tg-Jiu and Bumbesti-Jiu cities: sewerage and water network extension; 12 million euro project
    Relevant Work Experience in this project:
    •	Construction – General:
    -	General Work Provisions 
    -	Excavation
    -	Backfilling 
    -	Surface Replacement And Site Restoration
    -	Erosion Control
    -	Pay Measurement  
    •	Construction – Storm and sanitary sewer
    -	Laying Of Pipe Sewers 
    -	Monolithic Concrete Sewers And Appurtenances
    -	Reconnecting Building Sewers, Storm Water Drains And Utility Drains
    -	Catch Basins, Storm Water Inlets And Storm Water 
    -	Leakage Test of Sanitary Sewers
    •	Building Services
    -	Excavation
    -	Building Sanitary Sewers
    -	Building Combined Sewers 
    -	Building Storm Sewer (Laterals)
    -	Water Service Piping  
    •	Laying Of Building Sewers
    -	Connecting Building Sewers 
    -	 Acceptance Testing Of Building Sewers
    •	Laying Of Water Services
    -	Lead Joints 
    -	Laying Water Services
    •	Repair of existing sewer and water facilities        -    Remove And Replace Sewer Pipe 
    -	Inlet and Catch Basin Repair Work 
    -	Manhole Repair Work
    -	Manhole and Catch Basin Adjustments 
    -	Manhole Removal And Replacement
    -	Aggregate Slurry Backfill   
    

  • September 1989 - January 2000

    Lead Engineer, SC Hidroconstructia SA

    • «Alt oraș», Romania
    • Full time
    • Work domain - Technicians: Construction

    Main Activities: Superintendent, team supervisor for civil engineering buildings(from base structure to finish) and also hydro buildings:
    -	Builded Sambotin School building 
    -	Builded Mountain rescue office building - Ranca mountain resort
    -	Builded Vacation property Papusa building – Ranca mountain resort 
    -	Builded Bumbesti Jiu church 
    -	Ashes and coal combustion residues deposits Rovinari
    -	Groundwork for hydropower dam Valea Sadului 
    

Education

  • 2008 - 2008

    Postdoctorate, Ministerul Invatamantului

    • București, Romania
  • 1984 - 1989

    Bachelor's degree, Mines Institute Petrosani

    • Petroșani, Romania

Skills

Driving license
  • B

Foreign languages

English
Intermediate
French
Intermediate
Romanian
Native