86458

Electrician la S.C. General Concrete - Cernavoda (România), Cernavoda

Electrician at S.C. General Concrete

  • România, Cernavoda
  • România, Cernavoda
  • Romania, Cernavoda
  • Romania, Cernavoda
Deblocheaza date contact
Traduceri ale CV-ului
75%
  • Ultima actualizare: 30.09.2013
  • Numar referinta: 86458

Experienta

  • iunie 1999 - Prezent

    Electrician, S.C. General Concrete - Cernavoda (România), Cernavoda

    • Cernavoda, România
    • Full time
    • Domeniu - Muncitori Tehnicieni: Constructii

    Activităţi de întreținere a echipamentelor de tipul: schimbătoare de căldura, rezervoare, bazine de stocare a diferitelor fluide din incinta Centralei Nucleare Cernavoda
    Majoritatea timpului am lucrat in Centralele Nucleare 1si 2 din Cernavoda, atat la instalarea echipamentelor electrice de joasa si inalta tensiune,cat si la lucrari de precommissioning in aceste unitati. Efectuat trasee din confectie metalica pentru cabluri; tras si conectat cabluri in dulapuri de automatizari, cutii de distributie si panouri de control in care sunt instalate intrerupatoare, relee si diferite chei de comanda dupa planuri de conexiuni;insatlatii de iluminat (normal,emergenta), sisteme de avertizare.Dupa darea in folsinta a Unitatii 1,am efectuat lucrari de intretinere si mentenata electrica la tot ce era deja montat in Unitatea 2 (sistemul de iluminat, panouri si prize electrice,poduri rulante,etc.

Educatie

  • 1994 - 1998

    Liceu / scoala profesionala, Lazar Edeleanu (Colegiu Tehnic)

    • Roman, România

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Incepator
Romana
Nativ
75%
  • Last update: 30.09.2013
  • Reference number: 86458

Experience

  • June 1999 - Present

    Electrician, S.C. General Concrete

    • Cernavoda, Romania
    • Full time
    • Work domain - Technicians: Construction

    In this time I make activities such as maintenance of equipment: heat exchangers, tanks, storage tanks of different fluids inside the Cernavoda Nuclear Power Plant 
    - I work in Nuclear Power Plant , Unit.1 and Unit.2 , inside the Electrical Building and Control Center Room(C.C.R) for install electrical panels , transformer 10kv/0.4kv,pull cables,cables try .
    -The Nuclear Power Plant activity had been stoped each year (SUTDOWN), for actions of repairs , cecking and cleaning the electrical equipment
    - Terminations on electrical and instrument cables by connections,install “RAYCHEM” for 6KV and 10 KV -3 core terminations. Interconnection internal wiring in electrical panels M.C.C(type Tozzi) , power center(typeAutomatica) , 6 and 10kv panels (typeMagrini,ABB) engineering modification interconnection digram of panels.
    - Connectingg cables for fire alarm system (Nuclear Power Plant).
    - Connecting the public warning systems(Nuclear Power Plant).
    - Installation of many types of lamps and plugs according to their instuction manuals.
    - Wiring the control panels(including breakers, relays and different types of panels and equipment).
    

Education

  • 1994 - 1998

    Highschool, Lazar Edeleanu (Technical College)

    • Roman, Romania

Skills

Driving license
  • B

Foreign languages

English
Beginner
Romanian
Native