88137

Construction Project Manager - Oil & Gas Surface Facilities at Amromco Energy (Based in Houston, Texas, U.S.A.)

  • România, Ploiești
  • România, Ploiești
  • Romania, Ploiești
  • Romania, Ploiești
Deblocheaza date contact
Traduceri ale CV-ului
30%
  • Ultima actualizare: 14.09.2013
  • Numar referinta: 88137

Aptitudini

Permis de conducere
  • B

Limbi straine

Engleza
Avansat
Franceza
Avansat
Italiana
Mediu
Romana
Nativ
80%
  • Last update: 14.09.2013
  • Reference number: 88137

Experience

  • April 2013 - Present

    Construction Project Manager - Oil & Gas Surface Facilities, Amromco Energy (Based in Houston, Texas, U.S.A.)

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Co-ordination for Oil & Gas Surface Facilities Construction, having main responsibilities:
    •	Manage subcontractors and internal services team during Production Equipment installation and pipelines construction;
    •	Manage and supervise construction works and services performed on site as pipe spool fabrication, piping installation,  Hydro-test and Leakage Test;
    •	Providing assurance / verification for Engineering specialties: mechanical, structural, topographical, process, roads; 
    •	Monitoring project activities within the framework of budget, operational requirements, technical specifications and timetable;
    •	Supervising workshop manufacturing for equipment such as tanks, heat exchangers or separators; 
    •	Communicating and reporting on matters concerning all stakeholders involved: Project Team, Contractors, Senior Management, Vendors;
    •	Assurance for major equipment works required on site: Crane, Backhoe, Cementing and Fracturing Unit, Water Truck, Liquid Nitrogen Converter & Truck.
    
    

  • May 2012 - April 2013

    Project Manager - Oil & Gas Projects, Confind

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Design & Build for Oil & Gas EPCC & EPCM Projects – Exploration, Production, Refining - having main responsibilities:
    •	Deliver support to customers in order to identify Scope of Works: site visits, presentations;
    •	Participating in site inspections in refineries and/or production parks in order to evaluate the existing Units and submitting reports containing revamping / replacing solutions for piping and equipment such as pumps, compressors, pressure vessels, tanks;
    •	Issuing organizational chart for specific projects;
    •	Providing engineering design assurance/ verification of specific files:  Feasibility study, Conceptual, FEED, Permitting, Detailed Engineering, As Built;
    •	Project governance by means of regular meetings and reporting with stakeholders: designers, vendors, clients, senior management and company personnel;
    •	General planning and follow – up for all the activities required: offers, engineering, permitting, procurement, manufacturing, installation, close – out;
    •	Supervision for work packages: procurement, fabrication, site installation;
    •	Generating procedures for Testing, Pre-Commissioning, Commissioning: Hydro test, Water Flushing, Air Blowing, Air Freeing;
    •	Providing support for maintenance and operations: manuals, Spare Parts list / 2 years insurance stock
    •	Preparing files to be approved by 3rd party (NOBO) for piping or vessels certification;
    •	Monitoring safety key performance indicators and root causes analysis for incidents;
    •	Checking vendors invoices and preparing submission of invoicing to client;
    •	Keeping project register updated and management for Punch List items;
    •	Non-conformities: identifying and corrective actions;
    •	Team management: mentoring, coaching.
    PROJECTS:
    •	Revamping for Gas conditioning unit for OMV Petrom in Boldesti, Romania – over 3,000,000 € budget. The project included replacing of existing liquefiable gas cut recovery process with a much more efficient technology based on LTS package.
    •	Metering Point various locations–4,000,000 € budget, consisting in modules: intake manifold, separators, electric, instrumentation, instrumental air.Each project was adapted to location and crude oil properties. 
    

  • July 2011 - April 2012

    Project Manager - Mechanical Section, ArcelorMittal, Flat Carbon Europe

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    Co-ordination for CAPEX/ OPEX projects for general revamping in Primary Production Area (Sintering, Blast Furnaces and Steel Melting Shop) - roughly project portfolio: 200,000,000 €. As result, the steel production capacity has increased for 50% (from 2Mto/y to 3Mto/y). 
    I was completely involved in:
    •	Identifying the performance of the existing mechanical equipment and proposing new devices to be installed;
    •	Elaborating the scope of works together with the User Leader;
    •	Issuing/ Checking engineering file, supervising site works and releasing work procedures for Manufacturing, Lifting, Installation, Pre-commissioning, Commissioning, Start Up;
    •	Reviewing Operating and Maintenance manuals;
    •	Releasing procedures for preventive maintenance: non-destructive tests, replacement schedule for components;
    •	Communication with local authorities, ISC, ISCIR;
    •	Reporting to Steering Committee and making presentations in Proximity Meetings;
    •	Issuing non-conformity reports and approval for corrective actions;
    •	People development: coaching and encouraging initiative, communication and delegation.
    PROJECTS:
    •	300tf Crane Replacement in Steel Melting Shop – over 10,000,000 € budget. The project was performed with minimal impact on production and included the existing beams dismantle, replacing them and installation of a new crane. 
    •	Revamping Desulphurization and slag skimming station in Steel Melting Shop –1,350,000 € budget
    

  • January 2010 - July 2011

    Senior Mechanical Project Manager, IMSAT (Grope SNEF )

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Project management & Engineering for EPCC projects in industrial area such as chemical plants, refineries, cement plants and including Technical Installations, Industrial Shelters, Containerized Control Rooms and Conveying systems, fully involved in:
    •	Issuing General Arrangement Drawings and Equipment Arrangement Drawings in 3D;
    •	Mechanical design in all required stages: Conceptual, Bidding, Detailed, Bill of Quantities, Specifications;
    •	Elaborating the network co-ordination plan in 3D, including: technological lines, cable trays, ventilation and sewage;
    •	Releasing work procedures: Welding, Painting, Erection, Storage;
    •	Issuing request for quotation to vendors and leading audits to them;
    •	Generating purchasing orders to suppliers and verifying their invoices;
    •	Quantity and quality supervision of the works performance;
    •	Pro-active follow-up and co-ordination with internal Business Units: Workshop, Sites, Quality, Engineering;
    •	Compliance with international standards: ASME, ISO.
    REPRESENTATIVE PROJECTS
    2010 (Project Based in Middle East)
    •	Revamping Di-Ammonium Phosphate Production Plant for SNC-Lavalin & Jordan Phosphate Mines Company in Aqaba, Jordan.
    2011
    •	Containerized Control Rooms within South Yoloten Gas Field Development project for Turkmengas/ Petrofac in Turkmenistan.
    

  • July 2009 - December 2010

    Mechanical & Structural Manager, Epstein A & E (Chicago, USA & Bucharest)

    • Ploiești, Romania
    • Full time
    • Work domain - It Telecom: Engineering

    Design & Build for industrial area projects;
    •	Leading mechanical and structural design team consisting in specialists: engineers, cost controller, planner;
    •	Issuing engineering timetable and responsible for meeting all the major schedule milestones dates;
    •	Management for construction phase of major projects, including procurement, fabrication, quality, safety and co-ordination over specialty subcontractors;
    •	Mentoring and coaching junior engineers and trainees. 
    Projects: 
    •	Manufacturing Areas and Regional Offices for Cameron in Ploiesti (Romania) – 16,000,000 € budget. The facility is used for production of high pressure oil & gas systems and the production area included automated machining for valves and well head subassemblies, welding, QA/QC spaces and product delivery zone.
    

  • February 2005 - June 2008

    Managing Director, Rosfera Proiect

    • Ploiești, Romania
    • Full time
    • Work domain - Finance: Consulting,Management

    •	Design & Consultancy in industrial and civil area

  • August 1996 - February 2005

    Technical Department Manager, Coifer Grup

    • Ploiești, Romania
    • Full time
    • Work domain - Technicians: Construction

    Coordinating industrial and civil projects for such clients as Nuovo Pignone, ENI or OMV Petrom, fully involved in:
    •	Leading and planning a team of specialists: mechanical & structural engineers, cost controller, HVAC;
    •	Design in all required stages;
    •	Checking and approval for the design documents;
    •	Issuing and justifying the variation orders;
    •	Leading site visits together with the clients;
    •	Pro-active follow-up for the steel structure workshop (~600 tones/ month) and sites.

  • July 1992 - June 1996

    CAD Mechanical Design Engineer, Upetrom 1 Mai

    • Ploiești, Romania
    • Full time
    • Work domain - Engineering: Industries / Production / Manufacturing

    CAD design (2D, 3D) of tools required to manufacture oil production equipment, according to international standards such as API or DIN.

Education

  • 1987 - 1992

    Bachelor's degree, Polytechnic University

    • Roman, Romania

Skills

Driving license
  • B

Foreign languages

English
Advanced
French
Advanced
Italian
Intermediate
Romanian
Native