92218

Chief electrician la Dietswell (France)

  • România, Râmnicu Sărat
  • România, Râmnicu Sărat
  • Romania, Râmnicu Sărat
  • Romania, Râmnicu Sărat
Deblocheaza date contact
Traduceri ale CV-ului
95%
  • Ultima actualizare: 15.07.2015
  • Numar referinta: 92218

Obiectiv profesional

I'm electrical engineer,I watch a contract for an electrical job

  • UK,Italia,Olanda
  • Full time
  • Salariul dorit2100 €
  • Domeniile urmariteFinante Consultanta
  • Disponibilitate deplasare in interes de serviciuPana la 100% din program
  • Disponibilitate relocareNumai in strainatate

Experienta

  • aprilie 2014 - ianuarie 2015

    Chief electrician, Dietswell (France)

    • Oceanul Atlantic - Golful Biscay, Spania
    • Sezonier
    • Domeniu - Muncitori Tehnicieni: Service / Instalare

    Chief electrician for  electrical and instrumentation testing commission for electrical instrumentation installations- Offshore platform GAVIOTA –Atlantic Bay of Biscay
    
    During the contract period I worked  for the electrical and instrumentation of drilling rigs(Gaviota-Enagas platform Atlantic Ocean Bay of Biscay)Mention that the contract consisted in checking the entire electrical automation and instrumentation.Checking insulation resistance and motors functioning of the:
    -mud agitators
    -ventilation
    -mixing pump motors
    -mud pumps motors
    -rotary table motor
    -draw works motors
    -brake draw works motor
    -degassed motor
    -water cooling plant motor current continue
    -rotary table motor
    -mud  pumps motor
    -draw  works motors
    Checking:
    -the flow sensor
    -pressure vessel cooling water
    -checking and  adjusting press states motors
    -rotary table motor
    -mud pumps motors
    -draw works motors
    -was checked and  replaced when the case of the ventilation motors(belts and tension system).
    Was checked for pressure regulators pressurization system for:
    -electrical rooms
    -hall agitators
    -mud lab.room
    -doghouse
    -checking the wiring in the power supply TOP DRIVE
    -insulation resistance
    -electrical connections
     Checked all sensor:
    -smoke sensor
    -gas sensor
    -hydrogen sulfide sensor
    Changed electric motors:
    -the mixing pumps(BOP)
    -the oil pumps(mud pumps)
    -restoring electrical circuits by changing the power supply cables
    -checking the installation of safety lighting
    -remove all power wiring divide drilling murder probe
    -checking the installation of blowout prevents closing(type CAMERON)
    -remove all plant government probe drilling(type Martin Decker)         
    I made and installed cable support for instrumentation cables
    I mounted instrumentation  cables for control equipment :
    -mud pump-sensor for racing piston made in unit time
    -mud tanks-mud level sensor in the tanks.
    -level sensor lubricating oil tank mud pump piston
    -mounted and powered monitor sensor video.

  • ianuarie 2013 - decembrie 2013

    Electrical engineer, GSP Constanta

    • Istambul, Turcia
    • Sezonier
    • Domeniu - Inginerie: Energie / Industrii extractive

    Member team of the testing and commission for electrical and automation for offshore installations.Tested and put into operation:
    •Cables for the lights 
    •Cables for control
    •Cables heads for M.V. [10000 v]
    •Cables heads for power control room
    •Check the connections and cables for surveillance cameras
    •Sensor installations: gas sensors, fire sensor,H2Ssensors,CO2sensors,movement sensors
    •Electrical wiring alarm system
    •Electrical automation:crown blok crane,oil worker chef booth,rotary table.
    •electrical automation for systems:sweet water pumps,air compressors,fuel pumps station(diesel,oil),mud pumps station,control panel for power generators.

  • februarie 2012 - decembrie 2012

    Inginer electric, OILROM(romania) pentru Caspian Mariane Services Kazakhstan

    • Marea Caspica, Kazakhstan
    • Project based
    • Domeniu - Inginerie: Energie / Industrii extractive

    Member team of the testing and commission for electrical and automation for offshore installations.Tested and put into operation:
    •Cables for the lights and power installations
    •Cables for control
    •Cables heads for M.V. [10000 v]
    •Cables heads for power control room
    •Check the connections and cables for surveillance cameras
    •Sensor installations: gas sensors, fire sensors,H2S sensors,CO2 sensors ,movement sensors.
    •Electrical wiring alarm system
    •Electrical automation: crown block crane ,oil worker chef booth ,rotary tables.
    Electrical automation for systems: sweet water pumps ,air compressors stations, fuel pumps stations[diesel oil],mud pumps stations, control panel for power generators

  • februarie 2011 - decembrie 2011

    electrical engineer, E-ON GAS (Germany)

    • Ezel - Fridburg, Germania
    • Project based
    • Domeniu - Inginerie: Energie / Industrii extractive

    Member team of the testing and commission for electrical equipment and automation.  Tested and put into operations:
    -grounding installations, low and medium voltage installations, inside and outside lighting for compressors stations for gas transportation, AMC equipment and cables ending for engine from 1kw-17000kw

  • februarie 2010 - decembrie 2010

    electrical engineer, SIE SOLARI GROUP

    • Bari,Milano,Roma,Alexandria., Italia
    • Project based
    • Domeniu - Inginerie: Electrica / Mecanica,Energie / Industrii extractive

    Main activities and responsibilities	•Testing and commission for electrical installations:
    •Transformer station for solar panels
    •Electrical installations for conveyor belt for baggage delivery
    •Cables heads for solar panels

  • martie 2008 - noiembrie 2008

    Electrical engineer, Colemn Rey SRL

    • Buzău, România
    • Full time
    • Domeniu - Inginerie: Constructii,Electrica / Mecanica

    Civil and Industrial constrctions

  • februarie 1998 - septembrie 2007

    Electrical engineer, SC PERTROM SERVICE SA

    • București, România
    • Full time
    • Domeniu - Inginerie: Constructii,Electrica / Mecanica,Energie / Industrii extractive

    Electrical engineer( supervisor)
    Coordinating all activities of execution and management of projects.
    
    
    • Tested and put into operation:
    •Overhead power lines 20 kv
    •Overhead power lines 0,4 kv
    •Transformation points 20/0.4kV
    •Underground power lines 20/0.4kV
    •Grounding installations
    •Lighting and power installations
    •Electrical installations for cathodic protect
    •Electrical installations for industrial parks-[Bors-Oradea]
    •I put in the position of project manager GAS Pipeline 12”-Gura Humorului- Vatra Dornei -27 KM
    •We also put methane Gas Pipeline 6”-Paltinoasa-Solca-Milisauti,Radauti-42 Km.
    •The pipes were made in construction on units of 36 meters(triplets),welded,insulated and then undergo surgery Gamma ray verification.Triplets are carrying rout.Triplets were welded along the pipe,insulate and fit in grooves on sand.the intervals set by the project were under pressure to check tightness. After these tests stopper groove.the last operation consists in preparing the reports of surrender beneficiary pipeline.
    •I drove from the position of manager of project execution works factory meat dishes-Mizil. I drove all construction works:
    •concrete structure
    •water supply
    •gas supply
    •sewerage
    •all facilities automation,electrical and mechanical.
      I led the execution of civil construction projects industrial and energy:
       -adductions water for localities:Pirscov,Cernatesti,Bozioru.
       -industrial and vegetable market: Buzau
      I led the execution construction project industrial and energy for 
      PETROM Company  Romania:
     -petrol stations Petrom type: Bicaz,Piatra Neamt,Savinesti,Roman.
     -fuel oil depozit: Piatra Neamt,Roman
     -administrativ building:PETROM Company headquarters Piatra Neamt

  • iunie 1994 - septembrie 1998

    Electrical engineer, SC INSPET SA

    • Ploiești, România
    • Part time
    • Domeniu - Inginerie: Constructii,Electrica / Mecanica,Energie / Industrii extractive

    -tested and put into operation:
    • Overhead Power Lines 20kV, Overhead Power Lines 0.4kV 
    •Transformation points 20/0.4kV
    •Underground power lines 20/0.4kV
    •Grounding installations
    •Lighting and power installations
    •Lighting installations Danube
    •Cathodic protections
    • Electrical installations drilling and extraction wells
    Electrical installations for oil filter parks We used for monitoring and control oil filtration parks systems PLC/SCADA. The system was used to monitor oil pumps(flow and engine speed) and the valves (closed,open) for storage tanks.

  • septembrie 1987 - martie 1994

    inginer electric, SC ENERGO-PETROL SA

    • Câmpina, România
    • Part time
    • Domeniu - Inginerie: Constructii,Electrica / Mecanica,Energie / Industrii extractive,Industrii / Productie

    Team leader of the testing and commission for the electrical and automation installations
    -tested and put into operation:
    • Overhead Power Lines 20kV, Overhead Power Lines 0.4kV 
    •Transformation points 20/0.4kV
    •Underground power lines 20/0.4kV
    •Grounding installations
    •Lighting and power installations
    •Lighting installations Danube
    •Cathodic protections
    • Electrical installations drilling and extraction wells
    •Electrical installations for oil filter parks

  • februarie 1986 - noiembrie 1987

    Inginer electric(supervisor), Rompetrol (TURKMENISTAN)

    • București, România
    • Project based
    • Domeniu - Inginerie: Constructii,Electrica / Mecanica,Energie / Industrii extractive

    Works supervision of execution of electrical installations for power supply of the oil fields. I have prepared work permits and daily work reports.
    
    
    - Tested and put into operation:
    - Overhead power lines 20 kv,electrical and automation for drilling and oil- gas extraction,transformation points 20 kv- 0,4 kv,electrical installations for cathodic protections.

  • august 1983 - ianuarie 1987

    Inginer electric, Schela de foraj IANCA

    • Brăila, România
    • Full time
    • Domeniu - Inginerie: Constructii,Electrica / Mecanica,Energie / Industrii extractive

    Execution, maintenance and operation drilling wells

Educatie

  • 1980 - 1983

    Diploma de facultate, Institutul de Petrol si Gaze Ploiesti

    • Electromecanica
    • Ploiești, România
  • 1980 - 1983

    Diploma de facultate, Institutul de Petrol si Gaze

    • Electromecanica
    • Ploiești, România

Aptitudini

Permis de conducere
  • A
  • B
  • Capacitate de a munci in echipa
  • Putere de organizare si disciplina
  • Flexibilitate si adaptabilitate

-adaptabilitate de a munci in conditii specifice
-adaptabilitate de a munci cu parteneri straini
-disponibilitatea de a munci peste program cind este nevoie
-bun specialist in instalatii electrice si de  instrumentatie.

Limbi straine

Engleza
Mediu
Franceza
Mediu
Italiana
Mediu
Romana
Nativ

Pre-interviu

Cum ti-ai descrie personalitatea?

Un om normal cu adaptabilitate de a lucra in conditii grele cind se impune si adaptare de  lucrul in echipa cu parteneri straini.

Care sunt telurile tale in viata?

Sa pot reusi sa tin pasul cu cele mai noi metode de lucru si cunostinte temeinice a noilor  instalatii electromecanice

Descrie jobul ideal pentru tine.

Consider ca visul meu ar fi sa pot lucra intr-o companie serioasa in domeniul electromecanic pentru mentenanta sau punere in functie.

Care sunt scopurile pe care ti le-ai stabilit in cariera ta?

Sa pot spune mereu ca mi-am facut datoria la locul de munca.

Esti mai motivat lucrand in echipa sau in mod individual?

Cred ca fiecare mod de lucru in functie de specificul proiectului isi are scopul lui, dar cred ca in echipa este cel mai greu.

Ce job ti-ar place sa ai peste 5 ani?

As dori sa pot lucra intr-o companie foarte serioasa cu perspective de viitor.

La actualul sau fostul loc de munca, care au fost/sunt cele mai importante 5 realizari?

-Experienta
-cunostinte technice noi
-experienta de lucru in echipa 
-experienta de lucru in extra program si in coditii de stres
-am cistigat un salariu competitiv

Ce fel de salariu meriti?

Consider ca la experienta acumulata si cunostintele insusite pot spera oricind la un salariu pina in 2000 Euros.

Poti lucra dupa termene limita, sub presiune, etc?

Majoritatea locurilor de munca avute erau sub semnul termenelor si mereu a trebuit sa lucram in regim prelungit si sub presiune.

Care a fost ultima carte pe care ai citit-o?

Confesiunile unui cafegiu  gheorghe Florescu

35%
  • Last update: 15.07.2015
  • Reference number: 92218

Career goals


                            

  • UK,Italia,Olanda
  • Full time
  • Salary wanted2100 €
  • Wanted work domainsFinance Consulting
  • Availability for work related travelUp to 100% of the schedule
  • Willing to relocateOnly abroad

Skills

Driving license
  • A
  • B
  • Ability to work in team
  • Organization skills
  • Flexibility and adaptability

Foreign languages

English
Intermediate
French
Intermediate
Italian
Intermediate
Romanian
Native